I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
EPC stands for Engineering, Procurement, and Construction. It is a type of project delivery method used in construction and engineering industries.
EPC projects involve a single contractor who is responsible for the entire project from start to finish.
The contractor is responsible for designing, procuring materials and equipment, and constructing the project.
EPC projects are commonly used in industries such as oil and g...
Safety refers to the condition of being protected from harm, injury, or danger.
Safety involves taking measures to prevent accidents and injuries.
It includes identifying and mitigating potential hazards in the workplace or environment.
Safety also involves following established protocols and procedures to minimize risk.
Examples of safety measures include wearing protective gear, using safety equipment, and practicing saf...
Preliminary in bid refers to the initial stage of the bidding process where the bidder submits a rough estimate of the project cost.
Preliminary bid is a rough estimate of the project cost submitted by the bidder at the initial stage of the bidding process.
It is also known as a preliminary proposal or preliminary quotation.
The preliminary bid helps the client to shortlist the bidders for the next stage of the bidding pr...
Tender includes all the necessary documents and information required for a project or service to be bid on by potential contractors.
Tender documents provide details about the project or service, such as scope of work, timelines, and budget.
Tender also includes terms and conditions for bidding, evaluation criteria, and submission requirements.
Examples of tender documents include request for proposal (RFP), request for q
Pricing preamble refers to the introductory statement or explanation of the pricing structure.
It is a statement that precedes the actual pricing information.
It provides context and explanation for the pricing structure.
It may include information about discounts, fees, or other charges.
Example: 'The following prices are for standard packages. Additional fees may apply for customization.'
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
Top trending discussions
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.
HDPE and Di pipe IS codes are standards set by the Bureau of Indian Standards for high-density polyethylene and ductile iron pipes.
IS 4984: High-density polyethylene (HDPE) pipes for potable water supplies
IS 8329: Ductile iron (DI) pipes and fittings for pressure pipelines
Aerators are devices used to add air into water or other liquids to increase oxygen levels.
Surface aerators
Submersible aerators
Diffused aerators
Mechanical aerators
Aspirating aerators
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
Interview experience
based on 6 reviews
Rating in categories
HSE Advisor
45
salaries
| ₹7.2 L/yr - ₹20 L/yr |
Mechanical Engineer
39
salaries
| ₹6 L/yr - ₹20 L/yr |
Construction Management
33
salaries
| ₹12.5 L/yr - ₹41.1 L/yr |
Civil Engineer
21
salaries
| ₹5.5 L/yr - ₹17 L/yr |
Electrical Engineer
20
salaries
| ₹7.5 L/yr - ₹22.8 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Simplex Infrastructures
Hindustan Construction Company