Upload Button Icon Add office photos

Filter interviews by

Galfar Hvac Foreman Interview Questions, Process, and Tips

Updated 18 Sep 2023

Galfar Hvac Foreman Interview Experiences

1 interview found

Hvac Foreman Interview Questions & Answers

user image Anonymous

posted on 8 Feb 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. How to work split ac
  • Ans. 

    To work a split AC, you need to understand how the indoor and outdoor units function together to cool the space efficiently.

    • Ensure the indoor unit is properly mounted on the wall at a suitable height.

    • Connect the indoor unit to the outdoor unit using refrigerant lines and electrical wiring.

    • Set the desired temperature and fan speed on the remote control.

    • Regularly clean or replace the air filters to maintain optimal perfo...

  • Answered by AI
  • Q2. What the Full Form VRV
  • Ans. 

    Variable Refrigerant Volume

    • VRV stands for Variable Refrigerant Volume

    • It is a type of HVAC system that uses refrigerant as the cooling and heating medium

    • Allows for individual control of temperature in different zones

    • Commonly used in commercial buildings and large residential complexes

  • Answered by AI
  • Q3. How many Typ Gas
  • Ans. 

    The question is unclear and seems to be missing important context.

    • Ask for clarification on what 'Typ Gas' refers to

    • Provide examples of different types of gases commonly used in HVAC systems

    • Discuss the importance of knowing the specific type of gas for safety and efficiency

  • Answered by AI
  • Q4. Ther have more type gas Just R22/ 410/R32/
  • Q5. How to handle 8/9 people
  • Ans. 

    Delegate tasks effectively, communicate clearly, establish expectations, provide support and feedback, address conflicts promptly.

    • Delegate tasks based on individual strengths and skills

    • Communicate clearly and regularly to ensure everyone is on the same page

    • Establish clear expectations and goals for the team

    • Provide support and feedback to help team members succeed

    • Address conflicts promptly and professionally to maintain

  • Answered by AI
  • Q6. As team work every people polayady speack and truthly and Honestly workjng

Interview Preparation Tips

Interview preparation tips for other job seekers - Life is very importent Money without money life is not sucsses & not happy your & my family 100% Need to job and money life is normaly gone

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(13 Questions)

  • Q1. Easy attempt do best lob completely
  • Q2. Work easy before finishing job
  • Q3. My job 1st any not failure.
  • Q4. My job do the best performances good
  • Q5. All model ac maintance done.
  • Ans. 

    Yes, all model AC maintenance has been completed.

    • Regular maintenance is important to ensure optimal performance and longevity of the AC unit.

    • Maintenance tasks include cleaning or replacing filters, checking refrigerant levels, inspecting electrical components, and lubricating moving parts.

    • By completing maintenance on all models of AC units, we ensure that they are functioning properly and efficiently.

    • This can help prev...

  • Answered by AI
  • Q6. All electrical work done
  • Q7. All house hold work done
  • Q8. Hvac duct work installed
  • Ans. 

    HVAC duct work is installed to distribute air throughout a building.

    • Duct work is typically made of metal or flexible material.

    • It is important to properly size and design the duct work to ensure proper air flow.

    • Duct work should be installed by a licensed HVAC contractor.

    • Proper insulation should be used to prevent energy loss and condensation.

    • Examples of duct work include supply ducts, return ducts, and exhaust ducts.

  • Answered by AI
  • Q9. Firewater work done as ler drawings done
  • Ans. 

    Firewater work is done as per the drawings provided.

    • Firewater work involves installation of fire protection systems such as sprinklers, fire alarms, and fire extinguishers.

    • The work is done according to the drawings provided by the engineer or architect.

    • The drawings specify the location, type, and size of the fire protection systems to be installed.

    • The work is carried out by skilled HVAC technicians who are trained in f...

  • Answered by AI
  • Q10. Telemunictio wire laying install as per drawing done
  • Ans. 

    Telemunicatio wire laying is done as per the provided drawing.

    • Ensure that the wire is laid out in the correct location as per the drawing

    • Verify that the wire is properly secured and fastened

    • Test the wire to ensure proper connectivity and functionality

    • Document the installation process and any issues encountered

  • Answered by AI
  • Q11. All type of workshop maintance maintains in forman incharge done
  • Q12. All type of car gas filling do work done
  • Ans. 

    The question is unclear and does not seem to be related to HVAC FORMAN.

    • The question is not related to HVAC FORMAN.

    • It is unclear what the question is asking.

    • There is no apparent connection between car gas filling and HVAC work.

  • Answered by AI
  • Q13. Customer satisfaction done
  • Ans. 

    Customer satisfaction is a top priority for us.

    • We regularly gather feedback from customers to identify areas for improvement.

    • We ensure that our technicians are trained to provide excellent customer service.

    • We have a dedicated customer service team to address any concerns or issues.

    • We offer warranties and guarantees to ensure customer satisfaction.

    • We go above and beyond to exceed customer expectations.

  • Answered by AI
Round 3 - Group Discussion 

Yes group sidcusison then work start.

Interview Preparation Tips

Interview preparation tips for other job seekers - Job 1st quke, perfect complete and job satisfaction.

I applied via Approached by Company and was interviewed before Jul 2017. There was 0 interview round.

Interview Preparation Tips

General Tips: I have talk about strenght and labor work
Saiesfuction
Skills: Communication, Body Language, Problem Solving, Analytical Skills, Leadership, Presentation Skills, Time Management, Decision Making Skills
Duration: <1 week
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Electrical related in construction.line
  • Q2. Penals substation, slab pipping. Machineries maintenance

Interview Preparation Tips

Topics to prepare for L&T Construction Electrical Foreman interview:
  • Electrical Maintenance
  • Penal
  • Slab pipping.
Interview preparation tips for other job seekers - Electrical work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Fire fiting HVAC System
  • Q2. How many pressure fire line
  • Ans. 

    The number of pressure fire lines can vary depending on the specific requirements of the system and facility.

    • The number of pressure fire lines is determined by the size and layout of the facility.

    • Pressure fire lines are typically installed in areas where there is a high risk of fire, such as industrial plants or commercial buildings.

    • The number of pressure fire lines may also be influenced by local fire safety regulatio...

  • Answered by AI
  • Q3. What is hvac requmamt neme
  • Ans. 

    HVAC requirements refer to the specifications and standards needed for heating, ventilation, and air conditioning systems in a building or facility.

    • HVAC requirements include proper sizing of equipment to meet the heating and cooling needs of a space

    • They also involve ensuring proper ventilation to maintain indoor air quality

    • Compliance with building codes and regulations is essential for HVAC systems

    • Regular maintenance a...

  • Answered by AI
  • Q4. How many sprlar tipe
  • Ans. 

    The question is unclear and does not make sense. It seems to be a typo or a mistake.

    • The question may be asking about a specific type of equipment or tool, but it is not clear.

    • It is important to ask for clarification or more information to provide an accurate answer.

    • Without more context, it is impossible to determine what 'sprlar tipe' refers to.

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Firefiting hvac Systems
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Every month give salary?
  • Q2. Your company everyone system is ok?
  • Q3. Jis company material system and everyone processing is good?
  • Q4. This company what a system material?
  • Q5. This company which country and who is area work?

I was interviewed in May 2022.

Round 1 - Coding Test 
Round 2 - Technical 

(1 Question)

  • Q1. Keval pulling high and low voltage termination login commissioning and testing system have experience of work
Round 3 - Technical 

(1 Question)

  • Q1. I have oil and gas Power Plant finding electrical system maintenance and installation work and supervision

Interview Preparation Tips

Interview preparation tips for other job seekers - Well and guest refinery power plant dash plant

Civil Foreman Interview Questions & Answers

Bechtel user image Balbir Singh Singh

posted on 15 Feb 2022

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips

Interview Preparation Tips

Topics to prepare for Bechtel Civil Foreman interview:
  • Communication Skills
Interview preparation tips for other job seekers - Good team proper material management work under program or safety first
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(13 Questions)

  • Q1. Easy attempt do best lob completely
  • Q2. Work easy before finishing job
  • Q3. My job 1st any not failure.
  • Q4. My job do the best performances good
  • Q5. All model ac maintance done.
  • Ans. 

    Yes, all model AC maintenance has been completed.

    • Regular maintenance is important to ensure optimal performance and longevity of the AC unit.

    • Maintenance tasks include cleaning or replacing filters, checking refrigerant levels, inspecting electrical components, and lubricating moving parts.

    • By completing maintenance on all models of AC units, we ensure that they are functioning properly and efficiently.

    • This can help prev...

  • Answered by AI
  • Q6. All electrical work done
  • Q7. All house hold work done
  • Q8. Hvac duct work installed
  • Ans. 

    HVAC duct work is installed to distribute air throughout a building.

    • Duct work is typically made of metal or flexible material.

    • It is important to properly size and design the duct work to ensure proper air flow.

    • Duct work should be installed by a licensed HVAC contractor.

    • Proper insulation should be used to prevent energy loss and condensation.

    • Examples of duct work include supply ducts, return ducts, and exhaust ducts.

  • Answered by AI
  • Q9. Firewater work done as ler drawings done
  • Ans. 

    Firewater work is done as per the drawings provided.

    • Firewater work involves installation of fire protection systems such as sprinklers, fire alarms, and fire extinguishers.

    • The work is done according to the drawings provided by the engineer or architect.

    • The drawings specify the location, type, and size of the fire protection systems to be installed.

    • The work is carried out by skilled HVAC technicians who are trained in f...

  • Answered by AI
  • Q10. Telemunictio wire laying install as per drawing done
  • Ans. 

    Telemunicatio wire laying is done as per the provided drawing.

    • Ensure that the wire is laid out in the correct location as per the drawing

    • Verify that the wire is properly secured and fastened

    • Test the wire to ensure proper connectivity and functionality

    • Document the installation process and any issues encountered

  • Answered by AI
  • Q11. All type of workshop maintance maintains in forman incharge done
  • Q12. All type of car gas filling do work done
  • Ans. 

    The question is unclear and does not seem to be related to HVAC FORMAN.

    • The question is not related to HVAC FORMAN.

    • It is unclear what the question is asking.

    • There is no apparent connection between car gas filling and HVAC work.

  • Answered by AI
  • Q13. Customer satisfaction done
  • Ans. 

    Customer satisfaction is a top priority for us.

    • We regularly gather feedback from customers to identify areas for improvement.

    • We ensure that our technicians are trained to provide excellent customer service.

    • We have a dedicated customer service team to address any concerns or issues.

    • We offer warranties and guarantees to ensure customer satisfaction.

    • We go above and beyond to exceed customer expectations.

  • Answered by AI
Round 3 - Group Discussion 

Yes group sidcusison then work start.

Interview Preparation Tips

Interview preparation tips for other job seekers - Job 1st quke, perfect complete and job satisfaction.

I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - HR 

(7 Questions)

  • Q1. Why should we hire you?
  • Ans. 

    Bcz i like team work, honestly with management program

  • Answered Anonymously
  • Q2. Tell me about yourself.
  • Ans. 

    I'm civil foreman gulf experience or Indian experience I must say layout to finishing work complete any civil project

  • Answered Anonymously
  • Q3. What are your salary expectations?
  • Ans. 

    2000 thousand Indian rupee per day 8 haurs

  • Answered Anonymously
  • Q4. Share details of your previous job.
  • Q5. Where do you see yourself in 5 years?
  • Q6. For safety first with team work under program management
  • Q7. For tunnel or finishing work program

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice trip Air Port project

Galfar Interview FAQs

How many rounds are there in Galfar Hvac Foreman interview?
Galfar interview process usually has 2 rounds. The most common rounds in the Galfar interview process are Resume Shortlist and Technical.
What are the top questions asked in Galfar Hvac Foreman interview?

Some of the top questions asked at the Galfar Hvac Foreman interview -

  1. what the Full Form ...read more
  2. How to handle 8/9 peo...read more
  3. How to work split...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Galfar interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 696 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
Worley Interview Questions
4.1
 • 107 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
View all

Galfar Hvac Foreman Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

3.0

Work-Life balance

3.0

Salary & Benefits

3.0

Job Security

3.0

Company culture

3.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
HSE Advisor
45 salaries
unlock blur

₹7.2 L/yr - ₹20 L/yr

Mechanical Engineer
39 salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Construction Management
33 salaries
unlock blur

₹12.5 L/yr - ₹41.1 L/yr

Civil Engineer
21 salaries
unlock blur

₹5.5 L/yr - ₹22.2 L/yr

Electrical Engineer
20 salaries
unlock blur

₹7.5 L/yr - ₹22.8 L/yr

Explore more salaries
Compare Galfar with

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.4
Compare

Simplex Infrastructures

3.3
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview