I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
posted on 23 Feb 2023
Bulk modulus is a measure of a material's resistance to compression under pressure.
It is a measure of a material's compressibility
It is defined as the ratio of change in pressure to the fractional volume compression
It is used in the study of elasticity and fluid mechanics
Examples of materials with high bulk modulus include diamond and steel
Examples of materials with low bulk modulus include rubber and foam
G constant is required during sand bulking to account for the change in volume due to the presence of air voids.
G constant is used to calculate the volume of sand when it is in a loose state.
The presence of air voids in sand causes it to increase in volume, which is known as bulking.
The amount of bulking depends on the moisture content and the type of sand.
G constant is determined experimentally by comparing the volume...
I applied via LinkedIn and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
I applied via Approached by Company
Project execution approach involves planning, executing, and monitoring phases to ensure successful completion.
Planning phase involves defining project scope, objectives, and deliverables.
Execution phase involves carrying out the plan and coordinating resources.
Monitoring phase involves tracking progress, identifying issues, and making adjustments as needed.
posted on 20 Apr 2024
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
The functionality of a treatment plant involves multiple steps to treat wastewater and make it safe for disposal or reuse.
1. Collection of wastewater from various sources
2. Screening to remove large objects and debris
3. Primary treatment to separate solids from liquids
4. Secondary treatment to remove organic matter and pathogens
5. Tertiary treatment for further purification
6. Disinfection to kill remaining bacteria and...
The basic process of inspection for JJM sites involves site visits, documentation review, and compliance verification.
Site visits to physically inspect the location and facilities
Review of documentation such as permits, licenses, and safety records
Verification of compliance with regulations and standards
Reporting findings and recommending corrective actions if necessary
How to ensure team.efficiency
A case study on conflict management
based on 6 reviews
Rating in categories
HSE Advisor
45
salaries
| ₹7.2 L/yr - ₹20 L/yr |
Construction Management
33
salaries
| ₹12.5 L/yr - ₹41.1 L/yr |
Mechanical Engineer
32
salaries
| ₹6 L/yr - ₹20 L/yr |
Civil Engineer
21
salaries
| ₹5.5 L/yr - ₹17 L/yr |
Electrical Engineer
20
salaries
| ₹7.5 L/yr - ₹22.8 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Simplex Infrastructures
Hindustan Construction Company