J.kumar metro project is a major infrastructure project involving construction of metro rail system.
J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.
The project involves various stages such as planning, design, construction, and implementation.
It may include tasks like excavation, tunneling, track laying, station construction, etc.
The project requires coordination wi...
I applied via Naukri.com and was interviewed in Nov 2023. There were 7 interview rounds.
Compressive strength of cube
All test all tests quality control
Bitumen, Aggregate test, cement test,????
Coding test all questions
All tests quality control in Lab engineering
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Company restructuring or downsizing
Relocation to a new area
Currently working in a construction company in downtown Los Angeles.
Working in downtown Los Angeles
Construction company
Civil engineering job
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 3 Jun 2023
I applied via Company Website and was interviewed in May 2023. There were 3 interview rounds.
Unseen problems in civil engineering projects require critical thinking, problem-solving skills, and collaboration with team members.
Identify the root cause of the problem
Brainstorm potential solutions with team members
Consider the impact of each solution on the project timeline and budget
Implement the most feasible solution and monitor its effectiveness
Document the problem-solving process for future reference
I have 5 years of experience working as a Civil Site Engineer.
Worked on various construction projects including residential, commercial, and industrial buildings.
Managed site operations, supervised construction activities, and ensured compliance with safety regulations.
Collaborated with architects, contractors, and clients to ensure project requirements were met.
Performed site inspections, quality control checks, and r...
posted on 11 Jun 2023
Already talked to you
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
Answering questions related to projects, dynamic analysis, toughest project, pile foundations, and steel connection design.
Projects handled: Mention the types of projects, their scale, and your role in them.
Dynamic analysis methods: Explain different methods like time history analysis, response spectrum analysis, etc.
Modal combination methods: Discuss different methods like CQC, SRSS, ABS, etc., and their differences.
T...
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
posted on 20 Feb 2022
I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.
Reinforcement is provided in column to increase its load-bearing capacity and prevent failure due to compression.
Reinforcement helps to resist bending and shear forces in the column.
It also helps to prevent buckling and reduces the risk of collapse.
The amount and type of reinforcement used depends on the size and height of the column.
For example, a taller and thinner column may require more reinforcement than a shorter
The slump range for boom pressure varies depending on the specific project requirements and concrete mix design.
The slump range for boom pressure is typically determined by the concrete mix design and the desired workability of the concrete.
It can range from low slump (around 25-50 mm) for high-strength concrete with low water-cement ratio to high slump (around 150-200 mm) for self-compacting concrete.
The slump range m...
Accountability is the responsibility to answer for one's actions, while productivity is the measure of efficiency and output in achieving goals.
Accountability refers to being answerable for one's actions, decisions, and performance.
It involves taking ownership of tasks and outcomes, and being transparent and responsible.
Productivity is the measure of how efficiently and effectively work is completed.
It focuses on achie...
Yes, safety is a top priority at L&T and there are strict safety rules in place.
L&T has a comprehensive safety policy that covers all aspects of their operations.
All employees are required to undergo safety training and follow safety protocols.
Regular safety audits are conducted to ensure compliance with safety rules.
Personal protective equipment is provided to employees and its use is mandatory in hazardous areas.
Safe...
We follow a comprehensive quality control plan that includes regular inspections, testing, and documentation.
Develop and implement a quality control plan
Conduct regular inspections and testing
Document all quality control activities
Ensure compliance with industry standards and regulations
Provide training to staff on quality control procedures
based on 6 reviews
Rating in categories
Junior Engineer
901
salaries
| ₹0.4 L/yr - ₹6 L/yr |
Assistant Engineer
786
salaries
| ₹3 L/yr - ₹9 L/yr |
Junior Engineer Civil
461
salaries
| ₹1.8 L/yr - ₹6.3 L/yr |
Senior Engineer
354
salaries
| ₹4 L/yr - ₹11 L/yr |
Assistant Engineer - Civil
240
salaries
| ₹3.3 L/yr - ₹8 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys