Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by MKC Infrastructure Ltd. Team. If you also belong to the team, you can get access from here

MKC Infrastructure Ltd. Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

MKC Infrastructure Ltd. Interview Questions and Answers

Updated 8 Mar 2025

MKC Infrastructure Ltd. Interview Experiences

Popular Designations

33 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What are responsibilities of construction manager
  • Ans. 

    Construction manager is responsible for overseeing the construction process from start to finish.

    • Planning and scheduling construction activities

    • Managing project budget and resources

    • Ensuring compliance with safety regulations and building codes

    • Hiring and supervising subcontractors and construction workers

    • Communicating with clients, architects, and engineers

    • Resolving any issues or conflicts that arise during construction

    • ...

  • Answered by AI
  • Q2. What is osha compliance
  • Ans. 

    OSHA compliance refers to adhering to the safety standards set by the Occupational Safety and Health Administration.

    • OSHA compliance ensures a safe and healthy workplace for employees

    • It involves following regulations related to hazardous materials, equipment safety, and training programs

    • Examples of OSHA compliance include providing personal protective equipment, conducting regular safety inspections, and maintaining acc...

  • Answered by AI
  • Q3. What is construction budget
  • Ans. 

    Construction budget is the estimated cost of a construction project.

    • It includes all expenses related to the project such as labor, materials, equipment, permits, and fees.

    • The budget is usually created before the project starts and is used to track expenses throughout the project.

    • It helps to ensure that the project is completed within the allocated funds.

    • The budget can be adjusted if necessary due to unforeseen circumst...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Study well dont fake on resume .Add only as per your experience

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Engineer Interview Questions & Answers

user image GAURAV KUMAR

posted on 7 Mar 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - HR 

(1 Question)

  • Q1. What is the reason for change?
  • Ans. 

    Change is driven by necessity, innovation, and adaptation to evolving circumstances or challenges.

    • Necessity: Change often arises from the need to solve problems, such as improving safety in engineering designs.

    • Innovation: New technologies can prompt change, like the shift from traditional to renewable energy sources.

    • Adaptation: Organizations may change to meet new regulations or market demands, such as adopting sustain

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Past Work Experience Details?
  • Ans. 

    I have diverse engineering experience in project management, design, and implementation across various industries.

    • Led a team of engineers in developing a new product line, resulting in a 20% increase in market share.

    • Implemented a quality control system that reduced defects by 30% in manufacturing processes.

    • Collaborated with cross-functional teams to streamline operations, improving efficiency by 15%.

    • Conducted research ...

  • Answered by AI
  • Q2. Technical Questions

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (7)
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - One-on-one 

(1 Question)

  • Q1. HR Round, Technical Round
Round 2 - One-on-one 

(1 Question)

  • Q1. MD Round, Salary Decision

Senior Executive Interview Questions asked at other Companies

Q1. If oneday the men power is very less due to some problem and lode is more that day as a senior Exucative, how will u handle your team ?
View answer (56)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Details of JOB and working analysis
  • Q2. Experience details
Round 2 - One-on-one 

(2 Questions)

  • Q1. Working details
  • Q2. Skill and Experience

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

MKC Infrastructure Ltd. interview questions for popular designations

 Executive

 (3)

 Planning Engineer

 (2)

 Engineer

 (2)

 QS Engineer

 (2)

 Senior Executive

 (2)

 Management Trainee

 (1)

 Senior Engineer

 (1)

 Assistant Manager

 (1)

Process Developer Interview Questions & Answers

user image Ruksar Rukku

posted on 21 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Mkn hyugt tgtfedecjnygrf resecfgh
  • Q2. Jjkiu7tgtftr ffgbhhu jnhtdeswswaswqa

Process Developer Interview Questions asked at other Companies

Q1. What is RTR? What is depreciation?types of depreciation and also journal entries
View answer (31)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About Salary and accomodation
Round 2 - Technical 

(1 Question)

  • Q1. About Job details and Qualifications and Experience

Senior Executive Interview Questions asked at other Companies

Q1. If oneday the men power is very less due to some problem and lode is more that day as a senior Exucative, how will u handle your team ?
View answer (56)

Jobs at MKC Infrastructure Ltd.

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. Why do you want to work for this company.

Senior HR Executive Interview Questions asked at other Companies

Q1. 3. Do you have knowledge about labour laws, PF proceedings and contract laws?
View answer (2)

Billing Engineer Interview Questions & Answers

user image Jignesh Chauhan(QS-HO)

posted on 7 Mar 2025

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell us about yourself?

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024.

Round 1 - HR 

(1 Question)

  • Q1. Why do you want to join MKC?
  • Ans. 

    I am drawn to MKC for its innovative approach, commitment to excellence, and opportunities for professional growth in a dynamic environment.

    • MKC's reputation for innovation aligns with my passion for creative problem-solving, as seen in my project on sustainable business practices.

    • The company's commitment to employee development through training programs resonates with my desire to continuously improve my skills.

    • I admir...

  • Answered by AI

Management Trainee Interview Questions asked at other Companies

Q1. What do you mean by balance sheet reconciliation could you explain briefly?
View answer (45)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About Role in planning
  • Q2. About role in billing

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Executive Interview Questions & Answers

user image Anonymous

posted on 6 Mar 2025

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HOD 

(2 Questions)

  • Q1. Where are you currently employed?
  • Ans. 

    I am currently employed as a Senior Operations Manager at a leading logistics company, overseeing supply chain efficiency.

    • Leading a team of 50+ employees to optimize delivery routes, resulting in a 20% reduction in transportation costs.

    • Implementing new software solutions that improved inventory tracking accuracy by 30%.

    • Collaborating with cross-functional teams to enhance customer satisfaction scores by 15% over the pas

  • Answered by AI
  • Q2. Why did you leave your previous company?
  • Ans. 

    I left my previous company to pursue new challenges and opportunities for growth in my career.

    • I sought a role that aligned more closely with my long-term career goals.

    • The company culture shifted, and I felt it was time for a change.

    • I wanted to explore new industries and broaden my skill set.

    • I was presented with an opportunity that offered greater responsibility and leadership potential.

  • Answered by AI

Executive Interview Questions asked at other Companies

Q1. How will you start RS method Development for known drug product?
View answer (16)

MKC Infrastructure Ltd. Interview FAQs

How many rounds are there in MKC Infrastructure Ltd. interview?
MKC Infrastructure Ltd. interview process usually has 1-2 rounds. The most common rounds in the MKC Infrastructure Ltd. interview process are HR, Technical and Resume Shortlist.
How to prepare for MKC Infrastructure Ltd. interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at MKC Infrastructure Ltd.. The most common topics and skills that interviewers at MKC Infrastructure Ltd. expect are Accounting, Corporate Affairs, Government Relations, Land Acquisition and Liaison.
What are the top questions asked in MKC Infrastructure Ltd. interview?

Some of the top questions asked at the MKC Infrastructure Ltd. interview -

  1. What is FDD what is the density of soil Loose and Compact...read more
  2. What is the IS code of BBS & Measuremen...read more
  3. How would you design a box culvert step by ste...read more
How long is the MKC Infrastructure Ltd. interview process?

The duration of MKC Infrastructure Ltd. interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

MKC Infrastructure Ltd. Interview Process

based on 53 interviews

Interview experience

3.8
  
Good
View more

MKC Infrastructure Ltd. Reviews and Ratings

based on 343 reviews

3.6/5

Rating in categories

3.5

Skill development

3.4

Work-life balance

3.3

Salary

3.5

Job security

3.3

Company culture

3.3

Promotions

3.4

Work satisfaction

Explore 343 Reviews and Ratings
Executive - Senior Executive - Purchase

Gandhinagar

3-6 Yrs

Not Disclosed

Administration Executive

Gandhinagar

2-4 Yrs

Not Disclosed

Explore more jobs
Executive Accountant
32 salaries
unlock blur

₹2.3 L/yr - ₹4.2 L/yr

Junior Engineer
30 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Senior Engineer
29 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Assistant Manager
27 salaries
unlock blur

₹4.2 L/yr - ₹9.6 L/yr

Mechanical Engineer
25 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare MKC Infrastructure Ltd. with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

AtkinsRealis

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview