Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare
4.0

based on 17.9k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Larsen & Toubro Limited QA/QC Civil Engineer Interview Questions and Answers

Updated 27 Feb 2023

Larsen & Toubro Limited QA/QC Civil Engineer Interview Experiences

4 interviews found

QA/QC Civil Engineer Interview Questions & Answers

user image M.Anwarulla baig

posted on 6 Dec 2022

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell about self and ur present company
  • Q2. What is your present salary and how much your expectations?
  • Q3. What is notice period
Round 3 - Technical 

(4 Questions)

  • Q1. How did u check reinforcement after coming to site
  • Ans. 

    I checked reinforcement by verifying the bar bending schedule and conducting visual inspections.

    • Verified the bar bending schedule to ensure the correct size, shape, and placement of reinforcement bars.

    • Conducted visual inspections to check for any damage, corrosion, or improper installation of reinforcement.

    • Used a cover meter to check the depth of concrete cover over the reinforcement bars.

    • Checked the lap length of rein...

  • Answered by AI
  • Q2. How many cubes u cast per 1 m³
  • Ans. 

    The number of cubes cast per 1 m³ depends on the size of the cube.

    • The size of the cube can vary from 50mm to 150mm.

    • For example, if the cube size is 100mm, then 1000 cubes will be cast per 1 m³.

    • The number of cubes cast per 1 m³ is important for determining the compressive strength of concrete.

  • Answered by AI
  • Q3. What is QA/QC and tell me about our daily job activities
  • Ans. 

    QA/QC is the process of ensuring quality and consistency in construction projects.

    • Reviewing project specifications and ensuring compliance

    • Performing inspections and tests on materials and structures

    • Documenting and reporting any issues or non-compliance

    • Collaborating with project managers and contractors to resolve issues

    • Continuously monitoring and improving quality control processes

  • Answered by AI
  • Q4. How much cement content in your mix design and types of concretes ur using in present site
  • Ans. 

    I am using a mix design with X amount of cement content and various types of concrete on site.

    • The mix design includes X amount of cement content.

    • We are using different types of concrete on site such as reinforced, precast, and prestressed concrete.

    • The type of concrete used depends on the specific project requirements and design.

    • We ensure that the concrete mix meets the required strength and durability standards.

    • Regular...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is good company to do work but personal life was have leave
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What you know about ISO?
  • Ans. 

    ISO is an international organization that develops and publishes standards for various industries.

    • ISO stands for International Organization for Standardization

    • ISO develops and publishes standards for various industries such as quality management, environmental management, and information security management

    • ISO 9001 is a quality management standard that outlines requirements for a quality management system

    • ISO 14001 is a...

  • Answered by AI
  • Q2. Difference between quality manual & project quality plan? question about project quality plan?
  • Q3. Construction Material testing, mix design, case study question of site condition.
Round 3 - HR 

(1 Question)

  • Q1. Reason of job changes & salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & give detail answer & Be ready for cross questions

QA/QC Civil Engineer Interview Questions Asked at Other Companies

Q1. What to do when any building material come at site, and their tes ... read more
Q2. How much cement content in your mix design and types of concretes ... read more
Q3. How to prepare method statments and how flexible are you in worki ... read more
asked in Anoc
Q4. How can perform the work perfectly under pressure by upper Manage ... read more
Q5. Tell about send replacement test of soil?

I applied via Shine and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Civil engineering related
  • Q2. QA/QC civil related Site visit working Documentation
  • Q3. All material checked documents records.
  • Q4. Design and drawing documents.

Interview Preparation Tips

Interview preparation tips for other job seekers - Compni policy very good
L&T compni systematic work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Thoroughly asked questions for 40 min in technical round regarding my dept in depth knowledge,my responsibility in last company, academic career, handled project size and my team size.
Round 3 - HR 

(1 Question)

  • Q1. Regarding document varification and salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - If your exp is 5 years plus and if you have deep knowledge about your work and responsibilities then you get the job.

Larsen & Toubro Limited interview questions for designations

 QA QC Engineer

 (7)

 Senior QA QC Engineer

 (2)

 QA/QC Manager

 (2)

 QA QC Inspector

 (1)

 QA QC Inspector, QA QC Engineer

 (1)

 Assistant Manager - QA & QC

 (2)

 Civil Engineer

 (38)

 Civil Site Engineer

 (32)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Eield test of concrete.
  • Ans. 

    Field test of concrete is conducted to ensure the quality and strength of the concrete used in construction projects.

    • Field test involves sampling of concrete from the construction site.

    • Tests such as slump test, compressive strength test, and temperature test are commonly conducted.

    • Results of field tests help in determining the quality and durability of the concrete.

    • Field test results are compared with the design specif...

  • Answered by AI
  • Q2. Concetency test percentage of cement
  • Ans. 

    The competency test percentage of cement is a measure of the cement's ability to meet specified performance requirements.

    • Competency test percentage of cement is typically determined through laboratory testing.

    • It is important for ensuring the quality and performance of the cement in construction projects.

    • The percentage can vary depending on the type of cement and specific requirements of the project.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work gives a good future.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ratio of m25 concrete
  • Ans. 

    The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)

    • The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for medium strength concrete.

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.

  • Answered by AI
  • Q2. Per cum brick qty.
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibility previous company name
  • Ans. 

    As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.

    • Assisted senior engineers in project planning and design

    • Participated in site visits and inspections

    • Prepared project reports and documentation

    • Collaborated with team members and contractors

    • Ensured compliance with safety regulations and quality standards

  • Answered by AI
  • Q2. What is your responsibility previous company site Role.
  • Ans. 

    Managed site operations, coordinated with contractors, ensured compliance with safety regulations.

    • Managed day-to-day site operations

    • Coordinated with contractors for timely completion of projects

    • Ensured compliance with safety regulations and quality standards

    • Prepared progress reports and communicated with stakeholders

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Name of the client
  • Ans. 

    The name of the client is XYZ Construction Company.

    • XYZ Construction Company is a well-known construction firm in the region.

    • They have completed several projects in the past, including the construction of a new office building in downtown.

    • The client has a reputation for high-quality work and timely project completion.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Asked about previous work
  • Q2. What was the last project

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work and to learn

I applied via Approached by Company

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Lap length for hoop, development length.Grade of concrete and HDPE pipe is code
  • Ans. 

    Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.

    • Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.

    • Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.

    • The grade of concrete determines the ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Kindly give best companies interview question

I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is hydration process during casting of concrete?
  • Ans. 

    Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.

    • Hydration process starts as soon as water is added to cement.

    • The reaction produces heat and causes the mixture to harden and gain strength.

    • The process continues for weeks and even months, resulting in a stronger and more durable concrete.

    • The amount of water used in the mixture affects the hydration process and...

  • Answered by AI
  • Q2. Concrete strength depend ?
  • Ans. 

    Concrete strength depends on various factors.

    • Water-cement ratio

    • Type and quality of cement

    • Aggregate size and shape

    • Curing conditions

    • Mix design

    • Age of concrete

    • Temperature and humidity

    • Presence of admixtures

  • Answered by AI
  • Q3. Why used send in concrete mixer
  • Ans. 

    Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.

    • Water is added to hydrate the cement and activate the chemical reaction that causes it to harden

    • The amount of water added affects the strength and durability of the concrete

    • Too much water can weaken the concrete and cause cracking

    • The water should be added gradually and mixed thoroughly to ensure even distribution

    • Ot...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for AECOM Assistant Engineer - Civil interview:
  • Environmental effect on concrete
Interview preparation tips for other job seekers - Please increase knowledge inhance of fresher and experienced

I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is a Foundation
  • Ans. 

    A foundation is a structural element that supports a building or other structure by transferring its load to the underlying soil or rock.

    • Foundations are typically made of concrete, masonry, or steel.

    • They are designed to distribute the weight of the structure evenly and prevent settlement or movement.

    • Different types of foundations include shallow foundations (such as strip footings and mat foundations) and deep foundati...

  • Answered by AI
  • Q2. Full name of RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete.

    • RCC is a composite material made of cement, sand, aggregates, and steel reinforcement.

    • It is widely used in construction for its strength and durability.

    • The steel reinforcement provides tensile strength to the concrete, while the cement, sand, and aggregates provide compressive strength.

    • RCC is commonly used in the construction of buildings, bridges, dams, and other structures.

    • Ex...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil structure site engineer 5 year experience in RCC work

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited QA/QC Civil Engineer interview?
Larsen & Toubro Limited interview process usually has 2-3 rounds. The most common rounds in the Larsen & Toubro Limited interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Larsen & Toubro Limited QA/QC Civil Engineer interview?

Some of the top questions asked at the Larsen & Toubro Limited QA/QC Civil Engineer interview -

  1. How much cement content in your mix design and types of concretes ur using in ...read more
  2. How many cubes u cast per 1 ...read more
  3. what you know about I...read more

Tell us how to improve this page.

People are getting interviews through

based on 4 Larsen & Toubro Limited interviews
WalkIn
Job Portal
50%
50%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.2k Interviews
Tata Projects Interview Questions
4.3
 • 397 Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
Tata Technologies Interview Questions
3.7
 • 247 Interviews
TCE Interview Questions
3.8
 • 239 Interviews
View all
Larsen & Toubro Limited QA/QC Civil Engineer Salary
based on 49 salaries
₹2.2 L/yr - ₹10.3 L/yr
6% more than the average QA/QC Civil Engineer Salary in India
View more details

Larsen & Toubro Limited QA/QC Civil Engineer Reviews and Ratings

based on 9 reviews

4.7/5

Rating in categories

4.1

Skill development

2.4

Work-Life balance

3.9

Salary & Benefits

3.9

Job Security

3.9

Company culture

3.0

Promotions/Appraisal

3.3

Work Satisfaction

Explore 9 Reviews and Ratings
Assistant Manager
3.8k salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Senior Engineer
3.4k salaries
unlock blur

₹4.5 L/yr - ₹15.1 L/yr

Engineer
1.3k salaries
unlock blur

₹1.6 L/yr - ₹9.1 L/yr

Assistant Construction Manager
1.2k salaries
unlock blur

₹5 L/yr - ₹17.1 L/yr

Manager
1.1k salaries
unlock blur

₹9 L/yr - ₹28 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Group

4.2
Compare

Reliance Industries

4.1
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview