The process of residential building involves planning, design, construction, and finishing.
1. Planning phase includes site selection, zoning regulations, and obtaining permits.
2. Design phase involves creating architectural and structural plans.
3. Construction phase includes site preparation, foundation laying, framing, and finishing work.
4. Finishing phase includes interior design, landscaping, and final inspections.
5...
RCC slab casting process involves preparation, formwork, reinforcement, pouring concrete, curing, and finishing.
Prepare the site by leveling and compacting the ground.
Construct formwork to define the shape and dimensions of the slab.
Place reinforcement bars according to design specifications.
Pour concrete mixture into the formwork and ensure proper compaction.
Allow the concrete to cure for the specified time period.
Fin...
A task is a specific job or assignment that needs to be completed within a certain timeframe.
Tasks can range from designing a new bridge to conducting site inspections.
Tasks often have specific objectives, deadlines, and resources allocated to them.
Breaking down tasks into smaller sub-tasks can help in better planning and execution.
Examples: preparing construction drawings, analyzing soil samples, coordinating with sta
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
Kumar Properties interview questions for popular designations
I applied via Naukri.com and was interviewed in Jun 2023. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
Predicessors are FS, SS, FF, SF. Critical path is the longest path in the network diagram.
Four types of predicessors are FS (Finish-to-Start), SS (Start-to-Start), FF (Finish-to-Finish), and SF (Start-to-Finish)
Critical path is the longest path in the network diagram and determines the project duration
Activities on the critical path have zero float or slack time
Example: If activity A must finish before activity B can s
I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.
Top trending discussions
based on 123 reviews
Rating in categories
Sales Manager
26
salaries
| ₹5 L/yr - ₹13 L/yr |
Assistant Manager
24
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Senior Engineer
23
salaries
| ₹4.5 L/yr - ₹8 L/yr |
Sales Executive
18
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Junior Engineer
17
salaries
| ₹1.5 L/yr - ₹4 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group