Upload Button Icon Add office photos

Filter interviews by

Kumar Properties Senior Civil Engineer Interview Questions and Answers

Updated 23 Sep 2023

Kumar Properties Senior Civil Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Mar 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Whole process of residential building from start to bottom.
  • Ans. 

    The process of residential building involves planning, design, construction, and finishing.

    • 1. Planning phase includes site selection, zoning regulations, and obtaining permits.

    • 2. Design phase involves creating architectural and structural plans.

    • 3. Construction phase includes site preparation, foundation laying, framing, and finishing work.

    • 4. Finishing phase includes interior design, landscaping, and final inspections.

    • 5...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. RCC slab casting process from start to end .
  • Ans. 

    RCC slab casting process involves preparation, formwork, reinforcement, pouring concrete, curing, and finishing.

    • Prepare the site by leveling and compacting the ground.

    • Construct formwork to define the shape and dimensions of the slab.

    • Place reinforcement bars according to design specifications.

    • Pour concrete mixture into the formwork and ensure proper compaction.

    • Allow the concrete to cure for the specified time period.

    • Fin...

  • Answered by AI
  • Q2. What is task ?
  • Ans. 

    A task is a specific job or assignment that needs to be completed within a certain timeframe.

    • Tasks can range from designing a new bridge to conducting site inspections.

    • Tasks often have specific objectives, deadlines, and resources allocated to them.

    • Breaking down tasks into smaller sub-tasks can help in better planning and execution.

    • Examples: preparing construction drawings, analyzing soil samples, coordinating with sta

  • Answered by AI
Round 4 - Behavioral 

(1 Question)

  • Q1. Why you are leaving previous company
Round 5 - HR 

(1 Question)

  • Q1. What is your Salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence level

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper channel. Naukri. Hr mail.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to QA/QC and IS standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong base required to crack return test
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Tell me about yourself?
  • Q2. Past experience and academic
  • Q3. Software related-AutoCAD and Revit
  • Q4. What is Copy Monitor?
  • Ans. 

    Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.

    • It allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.

    • It can also be used to monitor changes to parame...

  • Answered by AI
  • Q5. How do you link Revit models?
  • Ans. 

    Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.

    • Open the host model and go to the 'Insert' tab.

    • Click on 'Link Revit' and select the model to be linked.

    • Choose the appropriate settings for the link, such as positioning and visibility.

    • Repeat the process for any additional models to be linked.

    • Save the host model to ensure the links are maintained.

  • Answered by AI
Round 3 - Assignment 

They gave an architectural model to create a structural model

Round 4 - HR 

(3 Questions)

  • Q1. Why are you changing the company?
  • Q2. What is your expectation?
  • Q3. Will you work for the same salary which you are getting for previous company?

Interview Preparation Tips

Topics to prepare for Sobha Senior Engineer interview:
  • software knowledge
  • REVIT Structure
  • AutoCAD
Interview preparation tips for other job seekers - it is like a government job.. if you like gossips and all you have to consider this company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Finishing activities
  • Q2. Types of paints, tiles.
  • Ans. 

    Types of paints and tiles commonly used in construction projects.

    • Types of paints: acrylic, latex, oil-based, enamel, spray paint

    • Types of tiles: ceramic, porcelain, glass, natural stone, mosaic

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions will be asked based on your past experience.

I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. There are some 5-6 technical questions with safety & quality related 3-4 question

Interview Preparation Tips

Interview preparation tips for other job seekers - First was on site interview conducted by GM & PM
Second HR round with skill test of 25 marks - analytical questions
Third Vice VP Hr -regarding personal information
Fourth was VP - regarding personal infomational like family background & past experience about general work system

Kumar Properties Interview FAQs

How many rounds are there in Kumar Properties Senior Civil Engineer interview?
Kumar Properties interview process usually has 5 rounds. The most common rounds in the Kumar Properties interview process are Technical, Resume Shortlist and Behavioral.
What are the top questions asked in Kumar Properties Senior Civil Engineer interview?

Some of the top questions asked at the Kumar Properties Senior Civil Engineer interview -

  1. Whole process of residential building from start to bott...read more
  2. RCC slab casting process from start to en...read more
  3. What is tas...read more

Tell us how to improve this page.

Kumar Properties Senior Civil Engineer Interview Process

based on 3 interviews

Interview experience

3.7
  
Good
View more

Fast track your campus placements

View all
Kumar Properties Senior Civil Engineer Salary
based on 15 salaries
₹4 L/yr - ₹6.7 L/yr
26% less than the average Senior Civil Engineer Salary in India
View more details

Kumar Properties Senior Civil Engineer Reviews and Ratings

based on 4 reviews

3.5/5

Rating in categories

2.6

Skill development

3.8

Work-life balance

3.6

Salary

3.1

Job security

3.1

Company culture

2.6

Promotions

3.1

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
23 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
23 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Manager
23 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Executive
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Civil Engineer
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Kumar Properties with

DLF

3.9
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview