Kumar Properties Planning Engineer Interview Questions and Answers

Updated 12 Apr 2023

Kumar Properties Planning Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Types of predicessors, critical path
  • Ans. 

    Predicessors are FS, SS, FF, SF. Critical path is the longest path in the network diagram.

    • Four types of predicessors are FS (Finish-to-Start), SS (Start-to-Start), FF (Finish-to-Finish), and SF (Start-to-Finish)

    • Critical path is the longest path in the network diagram and determines the project duration

    • Activities on the critical path have zero float or slack time

    • Example: If activity A must finish before activity B can s

  • Answered by AI
  • Q2. Schedule making, baseline, resource allocation
  • Q3. Project making for start to end

Interview Preparation Tips

Topics to prepare for Kumar Properties Planning Engineer interview:
  • MSP
  • AutoCAD
  • Excel
  • BUILDRUN
Interview preparation tips for other job seekers - Make your MSP perfect. Keep learning

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Previous experience
  • Q2. About previous project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. What Is mivan Accessories
  • Q2. Steel of footing
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All related your experience
Round 3 - HR 

(1 Question)

  • Q1. Hr type question

Kumar Properties Interview FAQs

How many rounds are there in Kumar Properties Planning Engineer interview?
Kumar Properties interview process usually has 2 rounds. The most common rounds in the Kumar Properties interview process are Resume Shortlist and Technical.
What are the top questions asked in Kumar Properties Planning Engineer interview?

Some of the top questions asked at the Kumar Properties Planning Engineer interview -

  1. Types of predicessors, critical p...read more
  2. Schedule making, baseline, resource allocat...read more
  3. Project making for start to ...read more

Tell us how to improve this page.

Kumar Properties Planning Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 356 Interviews
CBRE Interview Questions
4.2
 • 265 Interviews
NoBroker Interview Questions
3.2
 • 235 Interviews
Sobha Interview Questions
3.8
 • 130 Interviews
Lodha Group Interview Questions
4.0
 • 126 Interviews
DLF Interview Questions
3.9
 • 76 Interviews
View all

Fast track your campus placements

View all
Kumar Properties Planning Engineer Salary
based on 14 salaries
₹2.9 L/yr - ₹8 L/yr
8% less than the average Planning Engineer Salary in India
View more details

Kumar Properties Planning Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

3.5

Salary

4.5

Job security

3.5

Company culture

3.5

Promotions

3.5

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
23 salaries
unlock blur

₹4.5 L/yr - ₹10 L/yr

Senior Engineer
23 salaries
unlock blur

₹5.8 L/yr - ₹9 L/yr

Sales Manager
23 salaries
unlock blur

₹5 L/yr - ₹13 L/yr

Sales Executive
16 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Junior Engineer
15 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Explore more salaries
Compare Kumar Properties with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Lodha Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview