I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.
Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.
Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of struct...
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I am currently working at a construction site in downtown city.
Construction site in downtown city
Working on a high-rise building project
Coordinating with architects, contractors, and workers
Ensuring adherence to safety regulations and project timelines
posted on 19 Jul 2022
I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant
The SI unit of inductance is Henry (H).
Inductance is the property of an electrical circuit that opposes a change in current.
It is measured in Henry (H) and is named after American scientist Joseph Henry.
Inductance is used in various electrical components such as transformers, inductors, and motors.
The symbol for inductance is L and it is measured in units of Henry per meter squared (H/m^2).
Highmast and street lights , Towers , Control panel trouble shoot
Round was quite easy, for mechanical they had turbo machinery and heat transfer questions and basic SOM,TOM,MD,MF
Lifts work on the principle of pulleys and counterweights while ACs work on the principle of refrigeration.
Lifts use a motor to move a counterweight that balances the weight of the lift car and its occupants.
ACs use a compressor to compress and expand refrigerant gas to absorb and release heat.
Types of ACs include window ACs, split ACs, central ACs, and portable ACs.
Window ACs are mounted on windows and cool a single r...
Aptitude test like mathematics question ,reasoning & our department like mechanical engineer
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 19 Mar 2022
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Bricks are wet during brick work to prevent them from absorbing water from the mortar too quickly.
Wet bricks prevent the mortar from drying out too quickly, which can weaken the bond between the bricks and the mortar.
Wet bricks also help to prevent efflorescence, a white powdery substance that can form on the surface of bricks due to the migration of salts.
Bricks should be dampened, not soaked, before use.
The amount of...
The thickness of cement mortar in brickwork varies depending on the type of brick and the purpose of the wall.
For load-bearing walls, the thickness of the mortar should be 10mm for horizontal joints and 8mm for vertical joints.
For non-load-bearing walls, the thickness of the mortar can be reduced to 6mm for horizontal joints and 4mm for vertical joints.
The type of brick used can also affect the thickness of the mortar....
Chemical names of water proofing
Acrylic polymers
Bituminous coatings
Silicones
Polyurethane
Epoxy resins
Ceramic or porcelain tiles are commonly used in toilets due to their durability and water resistance.
Ceramic or porcelain tiles are commonly used in toilets
These tiles are durable and water-resistant
Other options include natural stone tiles and vinyl tiles
I expect a competitive salary based on my qualifications and experience.
Research the average salary range for Site Engineers in your area
Consider your level of experience and expertise
Factor in any additional certifications or specialized skills you possess
Be prepared to negotiate and discuss benefits package
Example: Based on my research, the average salary range for Site Engineers in this area is $60,000 to $80,000. C...
I worked as a Site Engineer at XYZ Construction Company.
Managed and supervised construction projects on-site.
Ensured compliance with building codes and regulations.
Collaborated with architects, contractors, and subcontractors.
Monitored project progress and resolved any issues that arose.
Prepared and maintained project documentation, including reports and drawings.
based on 4 reviews
Rating in categories
Sales Manager
26
salaries
| ₹5 L/yr - ₹13 L/yr |
Assistant Manager
24
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Senior Engineer
23
salaries
| ₹4.5 L/yr - ₹8.5 L/yr |
Sales Executive
18
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Junior Engineer
16
salaries
| ₹1.5 L/yr - ₹4 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group