Filter interviews by
posted on 15 Feb 2023
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Sep 2022. There were 4 interview rounds.
Jindal Power interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 2 interview rounds.
Get interview-ready with Top Jindal Power Interview Questions
I applied via Walk-in and was interviewed in May 2021. There were 4 interview rounds.
Ring granulator crusher is a machine used to crush coal, minerals, and other materials.
Ring granulator crushers are used in coal handling plants to crush coal and other materials.
They consist of a rotor with crushing elements inside a steel cage.
The drive unit of these crushers includes a gearbox, motor, and coupling.
The gearbox is used to reduce the speed of the motor and increase the torque.
The motor provides the pow...
I was interviewed before Mar 2021.
Jaw crusher plant is used for crushing rocks and stones into smaller sizes for construction purposes.
Jaw crusher plant is a type of crushing equipment used in mines and quarries.
It consists of a fixed and a movable jaw that compresses the rock or stone between them.
The crushed material is then discharged through a chute at the bottom of the machine.
Jaw crusher plants are commonly used in the construction industry for p...
A cone crusher plant is used for crushing rocks and ores into smaller sizes.
Cone crusher plant uses a cone-shaped crushing surface to break down materials
It is commonly used in mining and construction industries
The size of the crushed material can be adjusted by changing the gap between the mantle and concave
It is important to regularly maintain and inspect the plant to ensure optimal performance
The sequence of turbine erection involves several steps.
Site preparation and foundation work
Installation of the base plate and anchor bolts
Erection of the tower and nacelle
Installation of the rotor blades and hub
Electrical and control system installation
Commissioning and testing
TG alignment is done by measuring and adjusting the position of the turbine generator components.
Measure the position of the turbine and generator components using laser alignment tools
Adjust the position of the components by shimming or moving the baseplate
Repeat the measurement and adjustment process until the alignment is within specified tolerances
Perform a final check to ensure the alignment is correct
Top trending discussions
Some of the top questions asked at the Jindal Power interview -
The duration of Jindal Power interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 56 interviews
Interview experience
based on 324 reviews
Rating in categories
Botswana
5-10 Yrs
₹ 15-30 LPA
Assistant Manager
170
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
83
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Power
Adani Power
NTPC
Reliance Power