The sequence of turbine erection involves several steps.
Site preparation and foundation work
Installation of the base plate and anchor bolts
Erection of the tower and nacelle
Installation of the rotor blades and hub
Electrical and control system installation
Commissioning and testing
TG alignment is done by measuring and adjusting the position of the turbine generator components.
Measure the position of the turbine and generator components using laser alignment tools
Adjust the position of the components by shimming or moving the baseplate
Repeat the measurement and adjustment process until the alignment is within specified tolerances
Perform a final check to ensure the alignment is correct
Top trending discussions
based on 1 review
Rating in categories
Assistant Manager
172
salaries
| ₹4.2 L/yr - ₹13 L/yr |
Deputy Manager
87
salaries
| ₹6.4 L/yr - ₹20.8 L/yr |
Manager
83
salaries
| ₹9 L/yr - ₹25.4 L/yr |
Assistant Engineer
61
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
Junior Engineer
30
salaries
| ₹1.8 L/yr - ₹6.1 L/yr |
Tata Power
Adani Power
NTPC
Reliance Power