Drafting of connection details for pile caps, underground tunnels, and rail structures.
Ensure accurate dimensions and clear labeling in the drawings
Include reinforcement details for pile caps and tunnel structures
Specify materials and construction methods for rail connections
Consider safety factors and load-bearing capacities in the design
Collaborate with structural engineers and architects for seamless integration
I applied via Walk-in
Personal Behaviour and sound knowledge of your work.
Risk assessment at work involves identifying hazards, evaluating the likelihood and severity of harm, and implementing controls to reduce risk.
Identify hazards in the workplace
Evaluate the likelihood and severity of harm
Implement controls to reduce risk
Review and update risk assessments regularly
Involve employees in the risk assessment process
Document the risk assessment process and findings
J. Kumar Infraprojects interview questions for popular designations
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Maintenance and resources of machinery are crucial for smooth operations and cost-effectiveness.
Regular maintenance schedules should be established and followed strictly.
Proper training of personnel responsible for machinery maintenance is essential.
Adequate resources such as spare parts, tools, and equipment should be available.
Efficient inventory management system should be in place to avoid stockouts.
Monitoring and ...
Get interview-ready with Top J. Kumar Infraprojects Interview Questions
I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
The pour sequence refers to the order in which concrete is poured into formwork during construction.
The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.
It is important to follow the pour sequence to ensure proper curing and strength of the concrete.
For example, in a multi-story building construction, the pour sequence may start from the bottom floors and w...
U-girder is a type of precast concrete girder used in bridge construction.
U-girders are shaped like the letter 'U' and are commonly used in bridge projects.
They are precast off-site and transported to the construction site for installation.
U-girders provide structural support and are often used in combination with other bridge components.
They are designed to distribute the load of the bridge deck and traffic to the bri
I applied via Walk-in
Execution sequences and HSE parameters at site
Develop a comprehensive HSE plan for the project
Ensure all workers are trained on HSE procedures and protocols
Conduct regular safety audits and inspections
Implement a permit-to-work system for high-risk activities
Provide appropriate personal protective equipment (PPE) for workers
Ensure all equipment and machinery are regularly maintained and inspected
Establish emergency res...
Bearing capacity of soil is the maximum load that can be applied on the soil without causing any shear failure.
It is an important factor in designing foundations for structures.
It depends on the type of soil, its density, and moisture content.
It is determined by conducting soil tests such as Standard Penetration Test (SPT) and Cone Penetration Test (CPT).
Top trending discussions
Interview experience
based on 1.1k reviews
Rating in categories
Civil Engineer
168
salaries
| ₹2 L/yr - ₹9 L/yr |
Junior Engineer
167
salaries
| ₹2 L/yr - ₹5 L/yr |
Civil Site Engineer
156
salaries
| ₹2 L/yr - ₹6.6 L/yr |
Senior Engineer
132
salaries
| ₹4.5 L/yr - ₹11.2 L/yr |
Engineer
118
salaries
| ₹2.5 L/yr - ₹9.8 L/yr |
Larsen & Toubro Limited
Hindustan Construction Company
Simplex Infrastructures
IRB Infrastructure