Erection Engineer Interview Questions and Answers

Updated 22 Mar 2024

Popular Companies

Q1. Crane capacity you use to lift U girder & what is the weight of U Girder?

Ans.

The crane capacity used to lift U girder depends on the weight of the girder.

  • The weight of the U girder needs to be determined first

  • The crane capacity should be greater than the weight of the U girder

  • Factors such as the length and width of the U girder should also be considered

  • Example: If the U girder weighs 50 tons, the crane capacity should be at least 60 tons

Q2. Contractor rate who are doing erection in measurement?

Ans.

The contractor rate for erection in measurement varies depending on the project and location.

  • The rate can be hourly, daily, or project-based.

  • Factors that affect the rate include the complexity of the project, the location, and the experience of the contractor.

  • For example, in New York City, the average hourly rate for an erection engineer is $50-$100.

  • It is important to negotiate the rate and have a clear contract before starting the project.

Q3. Tell about erection procedure?

Ans.

Erection procedure involves planning, preparation, and execution of the erection process for a structure or equipment.

  • The procedure starts with a detailed plan and schedule for the erection process.

  • The site is prepared by clearing the area and setting up the necessary equipment and tools.

  • The foundation is laid and the structure or equipment is assembled piece by piece.

  • Safety measures are taken throughout the process to ensure the well-being of workers and the integrity of the...read more

Q4. How to calculate qwantity off steel

Ans.

Quantity of steel can be calculated by multiplying the volume of the structure by the density of steel.

  • Calculate the volume of the structure (length x width x height)

  • Determine the density of steel (usually around 7850 kg/m^3)

  • Multiply the volume by the density to get the quantity of steel needed

  • For example, if the volume of a structure is 100 m^3, the quantity of steel needed would be 100 m^3 x 7850 kg/m^3 = 785,000 kg

Erection Engineer Jobs

Erection Engineer 4-7 years
Kirby Building Systems
4.0
Hyderabad / Secunderabad
Erection Engineer-Centrifugal 1-4 years
Walchandnagar Industries
3.5
Baramati
Erection Engineer ( PEB ) 3-5 years
Blueladder EPC Solution Pvt. Ltd.
4.1
Nagpur
Are these interview questions helpful?
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.8
 • 141 Interviews
3.7
 • 112 Interviews
3.9
 • 5 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Recently Viewed
REVIEWS
Siyacon Technologies
No Reviews
LIST OF COMPANIES
Frenus Tech
Overview
JOBS
Siyacon Technologies
No Jobs
REVIEWS
Sevya Multimedia
No Reviews
REVIEWS
Frenus Tech
No Reviews
SALARIES
Frenus Tech
No Salaries
COMPANY BENEFITS
Sevya Multimedia
No Benefits
SALARIES
Sevya Multimedia
No Salaries
LIST OF COMPANIES
Sevya Multimedia
Overview
COMPANY BENEFITS
Frenus Tech
No Benefits
Erection Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter