Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 31 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. It was all About structural question
  • Q2. What do know about ugirder
  • Q3. What is the pour sequence
  • Ans. 

    The pour sequence refers to the order in which concrete is poured into formwork during construction.

    • The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.

    • It is important to follow the pour sequence to ensure proper curing and strength of the concrete.

    • For example, in a multi-story building construction, the pour sequence may start from the bottom floors and w...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. It was all about structural question
Round 4 - One-on-one 

(1 Question)

  • Q1. What do you know about U-girder
  • Ans. 

    U-girder is a type of precast concrete girder used in bridge construction.

    • U-girders are shaped like the letter 'U' and are commonly used in bridge projects.

    • They are precast off-site and transported to the construction site for installation.

    • U-girders provide structural support and are often used in combination with other bridge components.

    • They are designed to distribute the load of the bridge deck and traffic to the bri

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I is a big opportunity to do job in jkumar company. Management treat us like familyer. There is no mentally Harasment

Top J. Kumar Infraprojects Civil Foreman Interview Questions and Answers

Q1. How calculate zone Azone 3,700m B zone 1000ma& C zone remaining in center
View answer (2)

Civil Foreman Interview Questions asked at other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
View answer (1)

I applied via Walk-in

Round 1 - HR 

(1 Question)

  • Q1. What are your salary expectations?
Round 2 - Technical 

(1 Question)

  • Q1. Bar bending machine , bar cutting machine , gantry crane , pannel no.nc. contactor controls wairing and problem solve , cable gland work.and other electric work.
Round 3 - One-on-one 

(1 Question)

  • Q1. Construction work cable Gland

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge and experience
Ajshe jqajj. Qjahah ajaj jqwjag

Senior Electrical Technician Interview Questions asked at other Companies

Q1. Which fire extinguisher use in electrical fire
View answer (14)

Chief Manager Interview Questions & Answers

user image Anonymous

posted on 14 Feb 2022

Round 1 - HR 

(2 Questions)

  • Q1. Share details of your previous job.
  • Q2. Tell me about yourself.
Round 2 - One-on-one 

(2 Questions)

  • Q1. Asked about Metro experience
  • Q2. Execution sequences and how to ensure HSE parameters at site
  • Ans. 

    Execution sequences and HSE parameters at site

    • Develop a comprehensive HSE plan for the project

    • Ensure all workers are trained on HSE procedures and protocols

    • Conduct regular safety audits and inspections

    • Implement a permit-to-work system for high-risk activities

    • Provide appropriate personal protective equipment (PPE) for workers

    • Ensure all equipment and machinery are regularly maintained and inspected

    • Establish emergency res...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - What you have written in your CV. You must know HSE parameters.

Chief Manager Interview Questions asked at other Companies

Q1. What was the strategy to increase business share in particular role ! How will you increase market share in ICICI bank .
View answer (1)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 
Round 3 - Technical 

(1 Question)

  • Q1. What is bearing capacity of soil
  • Ans. 

    Bearing capacity of soil is the maximum load that can be applied on the soil without causing any shear failure.

    • It is an important factor in designing foundations for structures.

    • It depends on the type of soil, its density, and moisture content.

    • It is determined by conducting soil tests such as Standard Penetration Test (SPT) and Cone Penetration Test (CPT).

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Cool and also simple solution reply of HR at interview time

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

J. Kumar Infraprojects interview questions for popular designations

 Civil Engineer

 (4)

 Civil Foreman

 (3)

 Senior Engineer

 (2)

 Safety Officer

 (2)

 Safety Supervisor

 (2)

 Asst Store

 (2)

 Quality Engineer

 (2)

 QA QC Engineer

 (2)

Rigger 1 Interview Questions & Answers

user image Anonymous

posted on 2 Dec 2021

Interview Questionnaire 

4 Questions

  • Q1. Tu Kiya kam kar rha hai mai rigger helper hu segment sifting loding karta hu
  • Q2. Ha sir mai jabab diya hai
  • Q3. Rigger helper hu
  • Q4. Achcha se kam karna chahte

Interview Preparation Tips

Interview preparation tips for other job seekers - PP

Rigger 1 Interview Questions asked at other Companies

Q1. Which vessel have experience in offshore ?
View answer (2)

Get interview-ready with Top J. Kumar Infraprojects Interview Questions

Surveyor Interview Questions & Answers

user image Anonymous

posted on 25 Feb 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is superelevation ?
  • Ans. 

    Superelevation is the banking of a road or railway track on a curve to counteract the centrifugal force.

    • It is the inward slope of a road or railway track on a curve.

    • It helps to counteract the centrifugal force that tends to pull a vehicle or train off the track.

    • The amount of superelevation required depends on the speed of the vehicle or train and the radius of the curve.

    • Superelevation is usually expressed as a percenta...

  • Answered by AI
  • Q2. What is radius curve ?
  • Ans. 

    A radius curve is a section of a road or railway track that curves gradually in a circular shape.

    • Radius curves are used to allow vehicles or trains to change direction smoothly.

    • The radius of a curve is determined by the degree of the curve and the speed limit of the road or track.

    • Radius curves can be found on highways, railways, and even roller coasters.

    • A larger radius curve allows for higher speeds, while a smaller ra...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - I am search new job.
This day Very important for me .

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (4)

Jobs at J. Kumar Infraprojects

View all

Interview Questionnaire 

3 Questions

  • Q1. What is the differences between Live Wedges & Master Wedges....?
  • Ans. 

    Live wedges are used for real-time monitoring and adjustments, while master wedges are used for overall control and coordination.

    • Live wedges are typically used in live performances to make real-time adjustments to the sound levels of different instruments or vocals.

    • Master wedges, on the other hand, are used to control the overall sound levels and coordination of multiple live wedges.

    • Live wedges are often placed on stag...

  • Answered by AI
  • Q2. How many grades in cement...?
  • Ans. 

    There are different grades of cement based on their strength and composition.

    • Cement is classified into different grades based on its compressive strength.

    • The most common grades of cement are 33, 43, and 53.

    • The number represents the compressive strength of cement in megapascals (MPa).

    • Higher grade cement is generally used for construction projects that require higher strength.

    • For example, grade 33 cement is suitable for ...

  • Answered by AI
  • Q3. What is the full from of ISMC, ISMB, ISA....?
  • Ans. 

    ISMC stands for Indian Standard Medium Weight Channel, ISMB stands for Indian Standard Medium Weight Beam, and ISA stands for Indian Standard Angle.

    • ISMC - Indian Standard Medium Weight Channel

    • ISMB - Indian Standard Medium Weight Beam

    • ISA - Indian Standard Angle

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong but overconfidence is bad for interview..

Assistant Store Keeper Interview Questions asked at other Companies

Q1. What is the differences between Live Wedges & Master Wedges....?
View answer (2)

Surveyor Interview Questions & Answers

user image Anonymous

posted on 3 Feb 2022

I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Survey related Questions and site work information.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare questions for interview as per your work experience.

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (4)
Round 1 - Technical 
Round 2 - HR 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Where do you see yourself in 5 years?
  • Q6. Why are you looking for a change?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic question related your previous work

Interview Preparation Tips

Interview preparation tips for other job seekers - Preparation should on as per your previous work

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

J. Kumar Infraprojects Interview FAQs

How many rounds are there in J. Kumar Infraprojects interview?
J. Kumar Infraprojects interview process usually has 2-3 rounds. The most common rounds in the J. Kumar Infraprojects interview process are Technical, Resume Shortlist and HR.
How to prepare for J. Kumar Infraprojects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at J. Kumar Infraprojects. The most common topics and skills that interviewers at J. Kumar Infraprojects expect are Project Management, General Insurance, Quantity Surveying, Receptionist Activities and Talent Acquisition.
What are the top questions asked in J. Kumar Infraprojects interview?

Some of the top questions asked at the J. Kumar Infraprojects interview -

  1. What is the differences between Live Wedges & Master Wedges.....read more
  2. What is the full from of ISMC, ISMB, ISA.....read more
  3. Grade of dlc ,gsb and dBm which provided of pavemen...read more
How long is the J. Kumar Infraprojects interview process?

The duration of J. Kumar Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

J. Kumar Infraprojects Interview Process

based on 104 interviews

Interview experience

4.2
  
Good
View more

J. Kumar Infraprojects Reviews and Ratings

based on 1.1k reviews

4.0/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

3.6

Salary

3.9

Job security

3.7

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 1.1k Reviews and Ratings
Procurement Engineer / Officer

Mumbai

4-6 Yrs

Not Disclosed

Engineer Procurement (HO - Mumbai)

Mumbai

2-3 Yrs

Not Disclosed

Engineer - Procurement (For Delhi)

New Delhi

5-7 Yrs

Not Disclosed

Explore more jobs
Junior Engineer
181 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
157 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
152 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
138 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
114 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare J. Kumar Infraprojects with

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview