I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
The pour sequence refers to the order in which concrete is poured into formwork during construction.
The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.
It is important to follow the pour sequence to ensure proper curing and strength of the concrete.
For example, in a multi-story building construction, the pour sequence may start from the bottom floors and w...
U-girder is a type of precast concrete girder used in bridge construction.
U-girders are shaped like the letter 'U' and are commonly used in bridge projects.
They are precast off-site and transported to the construction site for installation.
U-girders provide structural support and are often used in combination with other bridge components.
They are designed to distribute the load of the bridge deck and traffic to the bri
I applied via Walk-in
Execution sequences and HSE parameters at site
Develop a comprehensive HSE plan for the project
Ensure all workers are trained on HSE procedures and protocols
Conduct regular safety audits and inspections
Implement a permit-to-work system for high-risk activities
Provide appropriate personal protective equipment (PPE) for workers
Ensure all equipment and machinery are regularly maintained and inspected
Establish emergency res...
Bearing capacity of soil is the maximum load that can be applied on the soil without causing any shear failure.
It is an important factor in designing foundations for structures.
It depends on the type of soil, its density, and moisture content.
It is determined by conducting soil tests such as Standard Penetration Test (SPT) and Cone Penetration Test (CPT).
J. Kumar Infraprojects interview questions for popular designations
Get interview-ready with Top J. Kumar Infraprojects Interview Questions
Superelevation is the banking of a road or railway track on a curve to counteract the centrifugal force.
It is the inward slope of a road or railway track on a curve.
It helps to counteract the centrifugal force that tends to pull a vehicle or train off the track.
The amount of superelevation required depends on the speed of the vehicle or train and the radius of the curve.
Superelevation is usually expressed as a percenta...
A radius curve is a section of a road or railway track that curves gradually in a circular shape.
Radius curves are used to allow vehicles or trains to change direction smoothly.
The radius of a curve is determined by the degree of the curve and the speed limit of the road or track.
Radius curves can be found on highways, railways, and even roller coasters.
A larger radius curve allows for higher speeds, while a smaller ra...
Live wedges are used for real-time monitoring and adjustments, while master wedges are used for overall control and coordination.
Live wedges are typically used in live performances to make real-time adjustments to the sound levels of different instruments or vocals.
Master wedges, on the other hand, are used to control the overall sound levels and coordination of multiple live wedges.
Live wedges are often placed on stag...
There are different grades of cement based on their strength and composition.
Cement is classified into different grades based on its compressive strength.
The most common grades of cement are 33, 43, and 53.
The number represents the compressive strength of cement in megapascals (MPa).
Higher grade cement is generally used for construction projects that require higher strength.
For example, grade 33 cement is suitable for ...
ISMC stands for Indian Standard Medium Weight Channel, ISMB stands for Indian Standard Medium Weight Beam, and ISA stands for Indian Standard Angle.
ISMC - Indian Standard Medium Weight Channel
ISMB - Indian Standard Medium Weight Beam
ISA - Indian Standard Angle
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
Top trending discussions
The duration of J. Kumar Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 104 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Junior Engineer
181
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
157
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
152
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
138
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
114
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Hindustan Construction Company
Simplex Infrastructures
IRB Infrastructure