Q1. How calculate zone Azone 3,700m B zone 1000ma& C zone remaining in center

Ans.

To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.

  • Determine the total area of the site

  • Calculate the area of zone A by subtracting the combined area of zones B and C from the total area

  • Calculate the area of zone B using the given dimension

  • Calculate the area of zone C by subtracting the area of zone B from the total area

  • Ensure the units of measurement are consistent throughout the calculations

View 1 answer

Q2. What do you know about U-girder

Ans.

U-girder is a type of precast concrete girder used in bridge construction.

  • U-girders are shaped like the letter 'U' and are commonly used in bridge projects.

  • They are precast off-site and transported to the construction site for installation.

  • U-girders provide structural support and are often used in combination with other bridge components.

  • They are designed to distribute the load of the bridge deck and traffic to the bridge abutments and piers.

Add your answer

Q3. What is mix ratio M 25

Ans.

Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.

  • M 25 mix ratio is commonly used in construction for structural applications.

  • The mix ratio represents the proportions of different materials used in the concrete mix.

  • For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or gravel).

  • This mix ratio ensures a strong and durable concret...read more

View 1 answer

Q4. How many zone in u grider

Ans.

The number of zones in a u grider varies depending on the specific design and requirements.

  • The number of zones in a u grider can range from 1 to multiple zones.

  • Zones are typically created to divide the grider into sections for better load distribution and structural stability.

  • The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specifications.

  • For example, a shorter u grider with a smaller load...read more

View 1 answer
Discover Biotech Healthcare Group interview dos and don'ts from real experiences

Q5. What is the pour sequence

Ans.

The pour sequence refers to the order in which concrete is poured into formwork during construction.

  • The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.

  • It is important to follow the pour sequence to ensure proper curing and strength of the concrete.

  • For example, in a multi-story building construction, the pour sequence may start from the bottom floors and work upwards to prevent structural issues.

  • The pour sequence...read more

Add your answer

Q6. What BBS in contraction

Ans.

BBS in construction stands for Bar Bending Schedule.

  • BBS is a document that provides details about the reinforcement steel bars used in a construction project.

  • It includes information about the size, shape, quantity, and placement of the bars.

  • BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.

  • Example: BBS for a column may specify the number of vertical bars, their diameter, length, a...read more

View 1 answer

Q7. How can work in hight

Ans.

Working at heights requires proper safety measures and equipment.

  • Use appropriate safety harnesses and fall protection systems.

  • Ensure scaffolding and ladders are secure and stable.

  • Follow safety guidelines and regulations.

  • Provide proper training to workers on working at heights.

  • Regularly inspect and maintain equipment and tools.

  • Implement safety barriers and guardrails.

  • Use aerial lifts or platforms for safe access to elevated areas.

  • Consider weather conditions and wind speeds bef...read more

View 1 answer

Q8. How u bihev ur Engeniar

Ans.

I behave as a civil engineer by being professional, organized, and detail-oriented.

  • I maintain a professional demeanor at all times, treating colleagues and clients with respect.

  • I am organized in my work, keeping track of project timelines, budgets, and resources.

  • I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.

  • I communicate effectively with team members, subcontractors, and stakeholders.

  • I prioritize safety on construction sites, i...read more

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter