Site Engineer Interview Questions & Answers

user image Anonymous

posted on 25 Feb 2022

I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Reinforcement work and excavation work
  • Q2. Excavation level and coordinate work

Interview Preparation Tips

Topics to prepare for Doosan Power Systems Site Engineer interview:
  • Positive thinking
  • Working time mind no mistake
Interview preparation tips for other job seekers - As for drawing work and level finishing work

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)
Round 1 - Technical 

(1 Question)

  • Q1. Boiler and BOP equipment and its functioning
  • Ans. 

    Boiler and BOP equipment are crucial components of power plants that generate electricity.

    • Boiler is responsible for generating steam by burning fuel, which is then used to turn turbines and generate electricity.

    • BOP (Balance of Plant) equipment includes pumps, fans, and other auxiliary systems that support the operation of the boiler and turbines.

    • BOP equipment also includes systems for water treatment, ash handling, and...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Basic background detail and ex work documents

Interview Preparation Tips

Interview preparation tips for other job seekers - Shall have knowledge of power plant

Senior Project Engineer Interview Questions asked at other Companies

Q1. Types of road:- 1 Flexible pavements .... .. . 2 Rigid pavements Flexible pavement:- embankment thickness 3m,large size soil particles 75mm lumps and cloud. Liquid limit <50% ,plastic limit<25%, swelling and shrnkag<50%, cbr as per... read more
View answer (2)

I applied via Naukri.com

Interview Questionnaire 

4 Questions

  • Q1. Say about yourself
  • Q2. Explain Billing process
  • Ans. 

    Billing process involves generating invoices and collecting payments for goods or services provided.

    • Creating invoices based on the goods or services provided

    • Sending invoices to customers

    • Tracking payments received and outstanding balances

    • Following up with customers on overdue payments

    • Recording payments in accounting software

    • Generating financial reports on billing activity

  • Answered by AI
  • Q3. Explain suppliers bill certification process
  • Ans. 

    Suppliers bill certification process involves verifying and approving invoices from suppliers.

    • The supplier sends an invoice for goods or services provided

    • The invoice is checked for accuracy and completeness

    • The invoice is matched with the purchase order and delivery receipt

    • The invoice is approved for payment if all information is correct

    • The payment is made to the supplier

  • Answered by AI
  • Q4. Explain BBU, MDCC.
  • Ans. 

    BBU stands for Baseband Unit and MDCC stands for Multi-Domain Command and Control.

    • BBU is a key component in a cellular network that processes and transmits data between the user's device and the core network.

    • MDCC is a system used by the military to coordinate and control operations across multiple domains, such as land, sea, air, and space.

    • BBU and MDCC are two different concepts used in different fields, but both are i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer freely & to the point answer.

Skills evaluated in this interview

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (64)

Interview Questionnaire 

8 Questions

  • Q1. What is WBS
  • Ans. 

    WBS stands for Work Breakdown Structure, a hierarchical decomposition of project deliverables into smaller, manageable components.

    • WBS is a tool used in project management to organize and define the scope of a project

    • It breaks down the project into smaller, more manageable components

    • Each component is then assigned a unique identifier and can be further broken down into smaller components

    • WBS helps in estimating project c...

  • Answered by AI
  • Q2. How to do Progress payment
  • Ans. 

    Progress payment is a payment made to a contractor based on the percentage of work completed.

    • Determine the percentage of work completed

    • Agree on the payment schedule with the contractor

    • Verify the work completed before making the payment

    • Ensure the payment is made on time to avoid delays

    • Keep accurate records of progress payments made

  • Answered by AI
  • Q3. How to make Contract for vendors
  • Ans. 

    A contract for vendors should clearly define the scope of work, payment terms, delivery schedule, quality standards, and dispute resolution mechanisms.

    • Define the scope of work and deliverables

    • Specify the payment terms and schedule

    • Set quality standards and acceptance criteria

    • Include provisions for warranties and guarantees

    • Outline the dispute resolution mechanisms

    • Include clauses for termination and breach of contract

    • Ensu...

  • Answered by AI
  • Q4. ERP Responsibilities
  • Q5. Vendors Quotation negotiations
  • Q6. Primavera P6 Knowledge, MS project Excel in advanve
  • Q7. Weekly reports and meeting with client
  • Q8. Meeting with vendors

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Doosan Power Systems interview questions for popular designations

 Site Engineer

 (3)

 Deputy Manager

 (2)

 Senior Manager

 (2)

 Senior Project Engineer

 (2)

 B Tech Mechanical Engineer

 (1)

 EHS Officer

 (1)

 Electrical Project Incharge

 (1)

 Electrical Technician

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Site exucution related
Round 3 - Technical 

(1 Question)

  • Q1. Drawing and project related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive its not a very huge hr & technical round

Site Supervisor Interview Questions asked at other Companies

Q1. What are handover process to civil or facillities
View answer (4)

Get interview-ready with Top Doosan Power Systems Interview Questions

I applied via Company Website and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical and CV based

Interview Preparation Tips

Interview preparation tips for other job seekers - Easy to approach and technical questions

Senior Designer Interview Questions asked at other Companies

Q1. How will you design a xyz machine with your machine vision expertise
View answer (1)

EHS Officer Interview Questions & Answers

user image Anonymous

posted on 13 Nov 2021

I applied via Referral and was interviewed before Nov 2020. There were 5 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. What is WAH and it's standard
  • Ans. 

    WAH stands for Working at Heights. It refers to the practice of working in elevated areas and the safety standards associated with it.

    • WAH is an acronym for Working at Heights.

    • It involves working in elevated areas such as rooftops, scaffolding, or ladders.

    • The WAH standard includes guidelines and regulations to ensure the safety of workers.

    • It emphasizes the use of fall protection equipment like harnesses, guardrails, and...

  • Answered by AI
  • Q2. What is scaffolding and where it has used
  • Ans. 

    Scaffolding is a temporary structure used to support workers and materials during construction or maintenance of buildings or structures.

    • Scaffolding is typically made of metal or wood and consists of platforms, braces, and supports.

    • It is used to provide a safe working platform for workers at heights.

    • Scaffolding is commonly used in construction, maintenance, and repair of buildings, bridges, and other structures.

    • Example...

  • Answered by AI
  • Q3. What is MSDS and it's sections
  • Ans. 

    MSDS stands for Material Safety Data Sheet. It is a document that provides information about the potential hazards and safe handling of a chemical substance.

    • MSDS is a comprehensive document that contains detailed information about a chemical substance, including its physical and chemical properties, potential hazards, and safety precautions.

    • It is typically provided by the manufacturer or supplier of the chemical and is...

  • Answered by AI
  • Q4. What is method of statement, who submit
  • Ans. 

    Method of statement is a written document that outlines the steps and procedures to be followed for a specific task or project.

    • Method of statement is used in industries such as construction, engineering, and manufacturing.

    • It includes details such as the scope of work, materials required, equipment needed, and safety precautions.

    • The method of statement is usually prepared by the contractor or project manager and submitt...

  • Answered by AI
  • Q5. Which rules are being use in Construction field in India
  • Ans. 

    The construction field in India follows various rules and regulations to ensure safety and compliance.

    • The Building and Other Construction Workers Act, 1996

    • The Construction and Demolition Waste Management Rules, 2016

    • The National Building Code of India, 2016

    • The Occupational Safety, Health and Working Conditions Code, 2020

    • The Environment Protection Act, 1986

    • The Water (Prevention and Control of Pollution) Act, 1974

    • The Air

  • Answered by AI
  • Q6. What is lifeline and it's using standard
  • Ans. 

    A lifeline is a safety line used to prevent falls and injuries in high-risk work environments.

    • Lifelines are typically made of rope or cable and are attached to a secure anchor point.

    • Workers wear a harness that is connected to the lifeline, allowing them to move freely while still being protected from falls.

    • Lifelines should be inspected regularly and replaced if any damage is found.

    • OSHA has specific regulations regardin...

  • Answered by AI
  • Q7. What is TPI and it's frequency
  • Ans. 

    TPI stands for Third Party Inspection. It is conducted by an independent party to ensure compliance with standards and regulations.

    • TPI is a process where an external party assesses the quality and safety of a product or service

    • It is commonly used in industries such as manufacturing, construction, and oil and gas

    • TPI helps to verify that the product or service meets the required specifications and standards

    • The frequency ...

  • Answered by AI
  • Q8. What are lifting gears and it's using, maintenance and checking standard
  • Ans. 

    Lifting gears are equipment used to lift heavy loads. They require regular maintenance and checking to ensure safety.

    • Lifting gears include cranes, hoists, slings, and shackles.

    • Maintenance should be done regularly to ensure proper functioning and safety.

    • Checking standards include load testing, visual inspections, and non-destructive testing.

    • Proper training and certification is required for operators and inspectors.

    • Any d...

  • Answered by AI
  • Q9. What is color coding
  • Ans. 

    Color coding is a system of assigning colors to objects or areas to indicate their purpose or level of hazard.

    • Color coding is commonly used in workplaces to improve safety and organization.

    • Different colors can be used to indicate different types of hazards, such as red for fire hazards or yellow for caution.

    • Color coding can also be used to designate specific areas for certain activities, such as green for first aid sta...

  • Answered by AI
  • Q10. What is HIRA and JSEA
  • Ans. 

    HIRA and JSEA are risk assessment tools used in occupational health and safety.

    • HIRA stands for Hazard Identification and Risk Assessment. It is a systematic process of identifying potential hazards and evaluating the associated risks.

    • JSEA stands for Job Safety and Environmental Analysis. It is a tool used to identify potential hazards and assess the risks associated with a specific job or task.

    • Both HIRA and JSEA are im...

  • Answered by AI
  • Q11. What is PTW and its uses
  • Ans. 

    PTW stands for Permit to Work. It is a formal written system used to control high-risk activities.

    • PTW is used to ensure that all necessary safety measures are taken before starting a high-risk activity.

    • It involves a written permit that must be obtained before starting the work.

    • The permit outlines the hazards associated with the work and the precautions that must be taken to mitigate those hazards.

    • PTW is commonly used i...

  • Answered by AI
  • Q12. What is electrical safety and it's standard
  • Ans. 

    Electrical safety refers to measures taken to prevent electrical hazards and ensure safe use of electrical equipment.

    • Electrical safety standards are set by organizations such as OSHA and NFPA.

    • These standards include guidelines for electrical equipment installation, maintenance, and use.

    • Examples of electrical safety measures include using grounded outlets, wearing protective gear when working with electricity, and prope...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and answer only what has asked for

Skills evaluated in this interview

Top Doosan Power Systems EHS Officer Interview Questions and Answers

Q1. What are lifting gears and it's using, maintenance and checking standard
View answer (1)

EHS Officer Interview Questions asked at other Companies

Q1. What's the KPI and how we prepare a strategy to achieve. What's the ISO certification and how do we implement and adhered in organization. What are the legal compliance in terms of EHS. How do we manage EHS functions and how typically we tr... read more
View answer (1)

I applied via Naukri.com and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Domain Experience in Particular Field
  • Ans. 

    I have extensive domain experience in the field of finance.

    • I have worked in the finance industry for over 10 years.

    • I have experience in financial analysis, budgeting, and forecasting.

    • I have managed teams responsible for financial reporting and compliance.

    • I have worked with various financial software and tools such as QuickBooks and Excel.

    • I have also kept up-to-date with industry trends and regulations through attending

  • Answered by AI
  • Q2. Question will be asked for relevant field, test the basics to High end systems in that field, test your confidence
Round 3 - HR 

(1 Question)

  • Q1. Sallary Negotiation By HR

Interview Preparation Tips

Topics to prepare for Doosan Power Systems Senior Manager interview:
  • Process
  • Instrumentation
  • Power Plant
Interview preparation tips for other job seekers - Very Useful for Fresher, they take up very large projects

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

Electrical Technician Interview Questions & Answers

user image Laisitti Duryodhan

posted on 2 Nov 2020

Interview Questionnaire 

1 Question

  • Q1. How to moter testing
  • Ans. 

    Motor testing involves various methods to check the performance and health of an electric motor.

    • Check the motor windings for continuity and resistance

    • Measure the voltage and current to determine power consumption

    • Inspect the bearings and lubrication for wear and tear

    • Perform a load test to evaluate the motor's ability to handle its rated load

    • Use specialized equipment like megohmmeters and oscilloscopes for more detailed

  • Answered by AI

Electrical Technician Interview Questions asked at other Companies

Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breake... read more
View answer (4)

I applied via Naukri.com and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Concrete, BBS and Shuttering.

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company to grow your skills..

Executive Engineer Interview Questions asked at other Companies

Q1. Question 1: What is memory leak? Question 2: What is static variable in C? with program Question 3: What are local variable and global variables? and their default values and program Question 4: What is method overriding? with program
View answer (1)

Doosan Power Systems Interview FAQs

How many rounds are there in Doosan Power Systems interview?
Doosan Power Systems interview process usually has 2-3 rounds. The most common rounds in the Doosan Power Systems interview process are Technical, Resume Shortlist and HR.
How to prepare for Doosan Power Systems interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Doosan Power Systems. The most common topics and skills that interviewers at Doosan Power Systems expect are Electrical Engineering, Electricals, Detail Engineering, Project Management and ASME Codes.
What are the top questions asked in Doosan Power Systems interview?

Some of the top questions asked at the Doosan Power Systems interview -

  1. What are lifting gears and it's using, maintenance and checking stand...read more
  2. Which rules are being use in Construction field in Ind...read more
  3. What is electrical safety and it's stand...read more

Tell us how to improve this page.

Doosan Power Systems Interview Process

based on 34 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 426 Interviews
Thermax Limited Interview Questions
4.2
 • 236 Interviews
Adani Group Interview Questions
3.9
 • 176 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
BHEL Interview Questions
4.1
 • 105 Interviews
GE Vernova Interview Questions
4.2
 • 87 Interviews
View all

Doosan Power Systems Reviews and Ratings

based on 523 reviews

4.2/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

3.9

Salary

3.4

Job security

3.9

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 523 Reviews and Ratings
Deputy Manager
225 salaries
unlock blur

₹5.2 L/yr - ₹17.5 L/yr

Manager
170 salaries
unlock blur

₹5.8 L/yr - ₹23 L/yr

Senior Engineer
158 salaries
unlock blur

₹4 L/yr - ₹12 L/yr

Engineer
86 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Senior Manager
65 salaries
unlock blur

₹10 L/yr - ₹32 L/yr

Explore more salaries
Compare Doosan Power Systems with

BHEL

4.1
Compare

Thermax Limited

4.2
Compare

Siemens

4.1
Compare

Alstom Transportation

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview