Interview Questionnaire 

8 Questions

  • Q1. What is WBS
  • Ans. 

    WBS stands for Work Breakdown Structure, a hierarchical decomposition of project deliverables into smaller, manageable components.

    • WBS is a tool used in project management to organize and define the scope of a project

    • It breaks down the project into smaller, more manageable components

    • Each component is then assigned a unique identifier and can be further broken down into smaller components

    • WBS helps in estimating project c...

  • Answered by AI
  • Q2. How to do Progress payment
  • Ans. 

    Progress payment is a payment made to a contractor based on the percentage of work completed.

    • Determine the percentage of work completed

    • Agree on the payment schedule with the contractor

    • Verify the work completed before making the payment

    • Ensure the payment is made on time to avoid delays

    • Keep accurate records of progress payments made

  • Answered by AI
  • Q3. How to make Contract for vendors
  • Ans. 

    A contract for vendors should clearly define the scope of work, payment terms, delivery schedule, quality standards, and dispute resolution mechanisms.

    • Define the scope of work and deliverables

    • Specify the payment terms and schedule

    • Set quality standards and acceptance criteria

    • Include provisions for warranties and guarantees

    • Outline the dispute resolution mechanisms

    • Include clauses for termination and breach of contract

    • Ensu...

  • Answered by AI
  • Q4. ERP Responsibilities
  • Q5. Vendors Quotation negotiations
  • Q6. Primavera P6 Knowledge, MS project Excel in advanve
  • Q7. Weekly reports and meeting with client
  • Q8. Meeting with vendors

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Detailed questions in primavera and planning
  • Q2. Substation experience is advantage
  • Ans. 

    Having substation experience is an advantage for a Planning Engineer as it demonstrates knowledge of electrical systems and infrastructure.

    • Substation experience shows understanding of electrical systems

    • Ability to plan and coordinate substation projects

    • Knowledge of safety regulations and procedures in substation environments

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Saudi Electricity Company Planning Engineer interview:
  • Primavera Project Planner
Interview preparation tips for other job seekers - Prepare the planning engineer question
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Basics of I&c in rotating equipment
  • Q2. How schedule in i&c for rotating equipment
  • Ans. 

    Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.

    • Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment

    • Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities

    • Utilize software tools such as CMMS to track maintenance activities and schedule fu...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Surge control in compressor
  • Ans. 

    Surge control in compressor is essential to prevent damage and maintain efficiency.

    • Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.

    • Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.

    • Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.

    • Proper surge...

  • Answered by AI
  • Q2. Synchronisation in generator explaining
  • Ans. 

    Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.

    • Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.

    • Key factors for synchronisation include voltage, frequency, and phase angle matching.

    • Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Detailed questions in primavera and planning
  • Q2. Substation experience is advantage
  • Ans. 

    Having substation experience is an advantage for a Planning Engineer as it demonstrates knowledge of electrical systems and infrastructure.

    • Substation experience shows understanding of electrical systems

    • Ability to plan and coordinate substation projects

    • Knowledge of safety regulations and procedures in substation environments

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Saudi Electricity Company Planning Engineer interview:
  • Primavera Project Planner
Interview preparation tips for other job seekers - Prepare the planning engineer question
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Basics of I&c in rotating equipment
  • Q2. How schedule in i&c for rotating equipment
  • Ans. 

    Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.

    • Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment

    • Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities

    • Utilize software tools such as CMMS to track maintenance activities and schedule fu...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Surge control in compressor
  • Ans. 

    Surge control in compressor is essential to prevent damage and maintain efficiency.

    • Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.

    • Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.

    • Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.

    • Proper surge...

  • Answered by AI
  • Q2. Synchronisation in generator explaining
  • Ans. 

    Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.

    • Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.

    • Key factors for synchronisation include voltage, frequency, and phase angle matching.

    • Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...

  • Answered by AI

Skills evaluated in this interview

Doosan Power Systems Interview FAQs

How to prepare for Doosan Power Systems Planning Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Doosan Power Systems. The most common topics and skills that interviewers at Doosan Power Systems expect are Budgeting, Cash Flow, Execution, Forecasting and MS Project.
What are the top questions asked in Doosan Power Systems Planning Engineer interview?

Some of the top questions asked at the Doosan Power Systems Planning Engineer interview -

  1. how to make Contract for vend...read more
  2. how to do Progress payme...read more
  3. what is ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
Thermax Limited Interview Questions
4.2
 • 243 Interviews
Adani Group Interview Questions
3.9
 • 182 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
GE Vernova Interview Questions
4.2
 • 86 Interviews
Vestas Interview Questions
4.3
 • 82 Interviews
View all
Doosan Power Systems Planning Engineer Salary
based on 22 salaries
₹2.8 L/yr - ₹9.9 L/yr
23% less than the average Planning Engineer Salary in India
View more details

Doosan Power Systems Planning Engineer Reviews and Ratings

based on 5 reviews

4.3/5

Rating in categories

3.4

Skill development

3.3

Work-life balance

3.2

Salary

3.2

Job security

3.5

Company culture

2.8

Promotions

3.9

Work satisfaction

Explore 5 Reviews and Ratings
Deputy Manager
224 salaries
unlock blur

₹5 L/yr - ₹17.5 L/yr

Manager
166 salaries
unlock blur

₹5.8 L/yr - ₹23 L/yr

Senior Engineer
143 salaries
unlock blur

₹4 L/yr - ₹11.7 L/yr

Engineer
85 salaries
unlock blur

₹3 L/yr - ₹8.4 L/yr

Senior Manager
65 salaries
unlock blur

₹10 L/yr - ₹32 L/yr

Explore more salaries
Compare Doosan Power Systems with

BHEL

4.1
Compare

Thermax Limited

4.2
Compare

Siemens

4.1
Compare

Alstom Transportation

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview