Boiler and BOP equipment are crucial components of power plants that generate electricity.
Boiler is responsible for generating steam by burning fuel, which is then used to turn turbines and generate electricity.
BOP (Balance of Plant) equipment includes pumps, fans, and other auxiliary systems that support the operation of the boiler and turbines.
BOP equipment also includes systems for water treatment, ash handling, and...
I applied via Referral and was interviewed in Nov 2017. There were 2 interview rounds.
I applied via Company Website and was interviewed in Dec 2021. There was 1 interview round.
posted on 6 Nov 2024
I applied via LinkedIn and was interviewed before Nov 2023. There were 3 interview rounds.
Apptitude test was quite easy to attend
Hackerrank platform was used for coding round.
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for a position that aligns with my career goals and offers growth opportunities.
I have relocated in the past for job opportunities and have found it to be a positive experience.
I understand that relocation may come with challenges, but I am prepared to adapt and thrive in a new environment.
posted on 23 Sep 2022
I applied via Walk-in
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
Finding number with most frequency in 1M size array of strings.
Use a hash table to store the frequency of each number.
Iterate through the array and update the frequency in the hash table.
Find the number with the highest frequency in the hash table.
To find length of linked list in single iteration, use two pointers and traverse the list until the end.
Use two pointers, one moving one node at a time and the other moving two nodes at a time.
Traverse the list until the end is reached.
The number of iterations taken by the faster pointer to reach the end is the length of the linked list.
I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.
posted on 20 Feb 2015
posted on 10 Sep 2017
I was interviewed before Sep 2016.
based on 1 review
Rating in categories
Deputy Manager
238
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
164
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
146
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
85
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
65
salaries
| ₹0 L/yr - ₹0 L/yr |
BHEL
Thermax Limited
Siemens
Alstom Transportation