Vestas
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I have extensive expertise in DFIG generators and their applications in various industries.
I have worked on the design and development of DFIG generators for wind turbines.
I have experience in troubleshooting and maintenance of DFIG generators.
I am familiar with the control systems used in DFIG generators.
I have knowledge of the latest advancements in DFIG generator technology.
I have worked on projects involving the in...
Top trending discussions
posted on 28 Apr 2022
Boiler and BOP equipment are crucial components of power plants that generate electricity.
Boiler is responsible for generating steam by burning fuel, which is then used to turn turbines and generate electricity.
BOP (Balance of Plant) equipment includes pumps, fans, and other auxiliary systems that support the operation of the boiler and turbines.
BOP equipment also includes systems for water treatment, ash handling, and...
posted on 5 Sep 2024
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
Some concrete tests include slump test, compressive strength test, and water absorption test.
Slump test measures the consistency and workability of fresh concrete.
Compressive strength test determines the strength of hardened concrete.
Water absorption test assesses the porosity of concrete.
Ultrasonic pulse velocity test measures the quality of concrete by assessing its homogeneity and detecting defects.
Rebound hammer te...
About civil knowledge
I applied via Referral
On field experience ...situational questions
posted on 15 May 2018
I applied via Referral and was interviewed in Nov 2017. There were 2 interview rounds.
posted on 19 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
Development of infrastructure
I applied via Company Website and was interviewed before Nov 2020. There were 4 interview rounds.
Substation protection includes overcurrent, earth fault, differential, distance, and backup protection.
Overcurrent protection is used to detect and isolate faults caused by excessive current flow.
Earth fault protection is used to detect and isolate faults caused by current leakage to earth.
Differential protection is used to detect and isolate faults between two parts of a system.
Distance protection is used to detect an...
posted on 28 Apr 2022
Boiler and BOP equipment are crucial components of power plants that generate electricity.
Boiler is responsible for generating steam by burning fuel, which is then used to turn turbines and generate electricity.
BOP (Balance of Plant) equipment includes pumps, fans, and other auxiliary systems that support the operation of the boiler and turbines.
BOP equipment also includes systems for water treatment, ash handling, and...
based on 1 review
Rating in categories
Engineer
334
salaries
| ₹3 L/yr - ₹11 L/yr |
Senior Engineer
199
salaries
| ₹5 L/yr - ₹14.1 L/yr |
Assistant Lead Engineer
186
salaries
| ₹8.6 L/yr - ₹20 L/yr |
Lead Engineer
181
salaries
| ₹8.2 L/yr - ₹28 L/yr |
Buyer
110
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Suzlon Group
Inox Wind
GE Vernova
Siemens Gamesa Renewable Power Private Limited