I appeared for an interview in Jan 2025.
Failure in coupling in Ganesa WTG can occur due to misalignment, wear and tear, or lack of lubrication.
Misalignment of the coupling can lead to failure, causing vibration and noise.
Wear and tear of the coupling components can result in reduced efficiency and eventual failure.
Lack of proper lubrication can cause increased friction and overheating, leading to coupling failure.
The quality issue with 0 max coupling refers to a problem with the maximum coupling value in a system.
Investigate the root cause of the quality issue with 0 max coupling
Check for any software or hardware malfunctions causing the problem
Ensure proper calibration and maintenance of the system
Implement corrective actions to resolve the quality issue
My current CTC is $60,000 per year.
My current CTC is $60,000 per year
I am currently earning $5,000 per month
My total compensation package is $60,000 annually
My expected CTC is negotiable based on the job responsibilities and market standards.
My expected CTC is based on my experience, skills, and the job requirements.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my qualifications and contributions.
I am flexible and willing to consider a range of compensation options.
I am seeking a fair and r...
I appeared for an interview in Oct 2024.
DFIG stands for Doubly Fed Induction Generator, a type of generator used in wind turbines.
DFIG is a type of generator commonly used in wind turbines
It has two sets of windings - one connected to the grid and the other connected to a converter
The converter allows control of the generator's output power and speed
DFIG is known for its ability to provide variable speed operation and improved efficiency
It is a popular choic...
Wind power is generated by harnessing the kinetic energy of wind to turn turbines, which then convert the energy into electricity.
Wind turbines capture the kinetic energy of the wind and convert it into mechanical energy.
The mechanical energy is then used to turn a generator, which produces electricity.
Wind power is a renewable energy source that is clean and sustainable.
Wind farms are large areas with multiple wind tu...
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
I have extensive experience working with wind turbines, including maintenance, troubleshooting, and repairs.
Performed regular maintenance checks on wind turbines to ensure optimal performance
Troubleshooted and repaired mechanical and electrical issues as needed
Worked with a team to install new wind turbines and ensure they were functioning correctly
Utilized specialized tools and equipment to perform tasks safely and ef
Site incharge oversees operations, manages resources, ensures safety, and coordinates with stakeholders.
Managing day-to-day operations at the site
Supervising and coordinating with on-site staff and contractors
Ensuring compliance with safety regulations and protocols
Managing resources effectively to meet project deadlines
Communicating with clients, vendors, and other stakeholders
Troubleshooting technical issues and prov...
Focus on communication skill.
Vestas interview questions for designations
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Increasing business can be achieved through various strategies.
Identify target audience and tailor marketing efforts accordingly
Offer promotions and discounts to attract new customers
Improve customer service to retain existing customers
Expand product or service offerings to attract a wider audience
Collaborate with other businesses to reach new markets
posted on 23 Feb 2024
Plant load factor is a measure of the actual output of a power plant compared to its maximum possible output.
Plant load factor is calculated by dividing the actual energy generated by the plant over a specific period by the maximum possible energy that could have been generated during the same period.
It is expressed as a percentage and indicates how efficiently a power plant is being utilized.
A high plant load factor i...
Machine availability is the percentage of time a machine is able to be used for its intended purpose.
Machine availability is calculated by dividing the total operating time by the total time in a given period, then multiplying by 100.
For example, if a machine operates for 800 hours in a month and there are 1000 total possible operating hours, the availability would be 80%.
Factors like downtime, maintenance, and repairs
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
A line diagram of a wind turbine generator (WTG) shows the flow of energy from wind to electricity.
The diagram typically includes the rotor blades, gearbox, generator, and power electronics
The blades capture wind energy and turn the rotor, which drives the gearbox
The gearbox increases the rotational speed and sends it to the generator
The generator converts the rotational energy into electrical energy
The power electroni...
DFIG converters are used in wind turbines to convert variable frequency AC power to DC power and back to AC power.
DFIG stands for Doubly Fed Induction Generator
The converter consists of two back-to-back voltage source converters
One converter controls the rotor current and the other controls the grid current
The rotor current is controlled to maintain a constant torque on the turbine
The grid current is controlled to main...
IGBT stands for Insulated Gate Bipolar Transistor, a semiconductor device used for switching applications in power electronics.
IGBT is a type of transistor that combines the high efficiency of a bipolar junction transistor (BJT) with the high input impedance of a MOSFET.
It is commonly used in applications such as motor drives, inverters, and power supplies.
IGBTs are used for high power applications due to their ability...
I applied via Campus Placement and was interviewed in Dec 2016. There were 3 interview rounds.
My project involves developing a new software tool that aligns with your company's focus on innovative technology solutions.
My project utilizes similar technology and methodologies that your company specializes in.
The end goal of my project aligns with the mission and values of your company.
I have experience working with similar clients or industries that your company serves.
My project could potentially enhance or comp...
I want to achieve continuous growth and development in my engineering career.
Continuous learning and upskilling in new technologies and tools
Contributing to innovative projects and solutions
Building a strong professional network
Advancing to higher positions within the engineering field
My friend suggested that my weakness is being too detail-oriented.
Sometimes I get caught up in minor details and lose sight of the bigger picture
I may spend too much time perfecting a task instead of completing it efficiently
I tend to overanalyze situations which can lead to indecision
I believe practical experience is more valuable than theoretical knowledge gained through higher studies.
I prefer hands-on learning and gaining real-world experience in the field.
I believe in continuous learning through on-the-job training and professional development.
I have already acquired the necessary skills and knowledge through my current work experience.
I want to focus on building my career and gaining practical...
based on 6 interviews
Interview experience
based on 41 reviews
Rating in categories
Engineer
268
salaries
| ₹3 L/yr - ₹12 L/yr |
Senior Engineer
189
salaries
| ₹5 L/yr - ₹14.1 L/yr |
Lead Engineer
184
salaries
| ₹8.2 L/yr - ₹28.6 L/yr |
Assistant Lead Engineer
177
salaries
| ₹8.9 L/yr - ₹20 L/yr |
Buyer
108
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Adani Power
Adani Group
NTPC
Tata Power