I applied via Referral and was interviewed in Dec 2021. There was 1 interview round.
To increase engine torque, you can optimize the air-fuel mixture, increase the engine displacement, or enhance the exhaust system.
Optimize the air-fuel mixture by adjusting the fuel injection timing and air intake
Increase the engine displacement by using a larger bore or longer stroke
Enhance the exhaust system by installing a high-flow catalytic converter or performance headers
Top trending discussions
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 14 Jun 2020
The market potential for machine tools is significant due to increasing industrialization and automation.
Growing demand for machine tools in various industries such as automotive, aerospace, and electronics
Rapid industrialization in emerging economies like China and India
Advancements in technology leading to the development of advanced machine tools
Increasing focus on automation and precision in manufacturing processes
...
I applied via Recruitment Consultant and was interviewed before Oct 2017. There were 3 interview rounds.
The basic hydraulic system consists of various valves and pumps that work together to control fluid flow and pressure.
Valves in a hydraulic system control the direction, flow rate, and pressure of the fluid.
Examples of valves include check valves, relief valves, and control valves.
Pumps in a hydraulic system generate the flow and pressure of the fluid.
Examples of pumps include gear pumps, vane pumps, and piston pumps.
H...
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
based on 1 interview
Interview experience
based on 22 reviews
Rating in categories
Assistant Manager
310
salaries
| ₹6 L/yr - ₹15 L/yr |
Field Officer
260
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
242
salaries
| ₹4 L/yr - ₹10.6 L/yr |
Deputy Manager
178
salaries
| ₹9.4 L/yr - ₹16.5 L/yr |
Territory Manager
172
salaries
| ₹3.6 L/yr - ₹10 L/yr |
John Deere
Thermax Limited
ABB
KONE