Siemens Gamesa Renewable Power Private Limited Service Engineer Interview Questions and Answers

Updated 23 Feb 2024

Siemens Gamesa Renewable Power Private Limited Service Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is Plant load factor
  • Ans. 

    Plant load factor is a measure of the actual output of a power plant compared to its maximum possible output.

    • Plant load factor is calculated by dividing the actual energy generated by the plant over a specific period by the maximum possible energy that could have been generated during the same period.

    • It is expressed as a percentage and indicates how efficiently a power plant is being utilized.

    • A high plant load factor i...

  • Answered by AI
  • Q2. What is machine availablity and how to calculate it
  • Ans. 

    Machine availability is the percentage of time a machine is able to be used for its intended purpose.

    • Machine availability is calculated by dividing the total operating time by the total time in a given period, then multiplying by 100.

    • For example, if a machine operates for 800 hours in a month and there are 1000 total possible operating hours, the availability would be 80%.

    • Factors like downtime, maintenance, and repairs

  • Answered by AI

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Oct 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about DFIG
  • Ans. 

    DFIG stands for Doubly Fed Induction Generator, a type of generator used in wind turbines.

    • DFIG is a type of generator commonly used in wind turbines

    • It has two sets of windings - one connected to the grid and the other connected to a converter

    • The converter allows control of the generator's output power and speed

    • DFIG is known for its ability to provide variable speed operation and improved efficiency

    • It is a popular choic...

  • Answered by AI
  • Q2. How wind power is generated
  • Ans. 

    Wind power is generated by harnessing the kinetic energy of wind to turn turbines, which then convert the energy into electricity.

    • Wind turbines capture the kinetic energy of the wind and convert it into mechanical energy.

    • The mechanical energy is then used to turn a generator, which produces electricity.

    • Wind power is a renewable energy source that is clean and sustainable.

    • Wind farms are large areas with multiple wind tu...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Line diagram of WTG
  • Ans. 

    A line diagram of a wind turbine generator (WTG) shows the flow of energy from wind to electricity.

    • The diagram typically includes the rotor blades, gearbox, generator, and power electronics

    • The blades capture wind energy and turn the rotor, which drives the gearbox

    • The gearbox increases the rotational speed and sends it to the generator

    • The generator converts the rotational energy into electrical energy

    • The power electroni...

  • Answered by AI
  • Q2. Working of DFIG converters
  • Ans. 

    DFIG converters are used in wind turbines to convert variable frequency AC power to DC power and back to AC power.

    • DFIG stands for Doubly Fed Induction Generator

    • The converter consists of two back-to-back voltage source converters

    • One converter controls the rotor current and the other controls the grid current

    • The rotor current is controlled to maintain a constant torque on the turbine

    • The grid current is controlled to main...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Why join jakson and why left old company.
  • Q2. What you have Cummins training id
  • Q3. How to increaseed business
  • Ans. 

    Increasing business can be achieved through various strategies.

    • Identify target audience and tailor marketing efforts accordingly

    • Offer promotions and discounts to attract new customers

    • Improve customer service to retain existing customers

    • Expand product or service offerings to attract a wider audience

    • Collaborate with other businesses to reach new markets

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have Cummins HHP I'd. Your joining 80%. And you prepared dg related questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. My experience with wind turnbine
  • Ans. 

    I have extensive experience working with wind turbines, including maintenance, troubleshooting, and repairs.

    • Performed regular maintenance checks on wind turbines to ensure optimal performance

    • Troubleshooted and repaired mechanical and electrical issues as needed

    • Worked with a team to install new wind turbines and ensure they were functioning correctly

    • Utilized specialized tools and equipment to perform tasks safely and ef

  • Answered by AI
  • Q2. Roles and responsibilities at site incharge level
  • Ans. 

    Site incharge oversees operations, manages resources, ensures safety, and coordinates with stakeholders.

    • Managing day-to-day operations at the site

    • Supervising and coordinating with on-site staff and contractors

    • Ensuring compliance with safety regulations and protocols

    • Managing resources effectively to meet project deadlines

    • Communicating with clients, vendors, and other stakeholders

    • Troubleshooting technical issues and prov...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Line diagram of WTG
  • Ans. 

    A line diagram of a wind turbine generator (WTG) shows the flow of energy from wind to electricity.

    • The diagram typically includes the rotor blades, gearbox, generator, and power electronics

    • The blades capture wind energy and turn the rotor, which drives the gearbox

    • The gearbox increases the rotational speed and sends it to the generator

    • The generator converts the rotational energy into electrical energy

    • The power electroni...

  • Answered by AI
  • Q2. Working of DFIG converters
  • Ans. 

    DFIG converters are used in wind turbines to convert variable frequency AC power to DC power and back to AC power.

    • DFIG stands for Doubly Fed Induction Generator

    • The converter consists of two back-to-back voltage source converters

    • One converter controls the rotor current and the other controls the grid current

    • The rotor current is controlled to maintain a constant torque on the turbine

    • The grid current is controlled to main...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Why join jakson and why left old company.
  • Q2. What you have Cummins training id
  • Q3. How to increaseed business
  • Ans. 

    Increasing business can be achieved through various strategies.

    • Identify target audience and tailor marketing efforts accordingly

    • Offer promotions and discounts to attract new customers

    • Improve customer service to retain existing customers

    • Expand product or service offerings to attract a wider audience

    • Collaborate with other businesses to reach new markets

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have Cummins HHP I'd. Your joining 80%. And you prepared dg related questions
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Focus on communication skill.

Round 2 - Technical 

(1 Question)

  • Q1. Focus on roll and work wise technical skill.

Interview Preparation Tips

Interview preparation tips for other job seekers - Pls develop your communication skill.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Electrical basic and advance knowledge
  • Q2. HT LT line, transformer,generator
  • Q3. Igbt,thyrister,rectifier,inverter,diode

Interview Preparation Tips

Interview preparation tips for other job seekers - theory knowledge & experience of field
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Oct 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about DFIG
  • Ans. 

    DFIG stands for Doubly Fed Induction Generator, a type of generator used in wind turbines.

    • DFIG is a type of generator commonly used in wind turbines

    • It has two sets of windings - one connected to the grid and the other connected to a converter

    • The converter allows control of the generator's output power and speed

    • DFIG is known for its ability to provide variable speed operation and improved efficiency

    • It is a popular choic...

  • Answered by AI
  • Q2. How wind power is generated
  • Ans. 

    Wind power is generated by harnessing the kinetic energy of wind to turn turbines, which then convert the energy into electricity.

    • Wind turbines capture the kinetic energy of the wind and convert it into mechanical energy.

    • The mechanical energy is then used to turn a generator, which produces electricity.

    • Wind power is a renewable energy source that is clean and sustainable.

    • Wind farms are large areas with multiple wind tu...

  • Answered by AI

Siemens Gamesa Renewable Power Private Limited Interview FAQs

How many rounds are there in Siemens Gamesa Renewable Power Private Limited Service Engineer interview?
Siemens Gamesa Renewable Power Private Limited interview process usually has 1 rounds. The most common rounds in the Siemens Gamesa Renewable Power Private Limited interview process are Technical.
How to prepare for Siemens Gamesa Renewable Power Private Limited Service Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Siemens Gamesa Renewable Power Private Limited. The most common topics and skills that interviewers at Siemens Gamesa Renewable Power Private Limited expect are Recruitment, Siemens, Training, Management and User Support.
What are the top questions asked in Siemens Gamesa Renewable Power Private Limited Service Engineer interview?

Some of the top questions asked at the Siemens Gamesa Renewable Power Private Limited Service Engineer interview -

  1. What is machine availablity and how to calculate...read more
  2. What is Plant load fac...read more

Tell us how to improve this page.

Siemens Gamesa Renewable Power Private Limited Service Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
66% more than the average Service Engineer Salary in India
View more details

Siemens Gamesa Renewable Power Private Limited Service Engineer Reviews and Ratings

based on 27 reviews

4.6/5

Rating in categories

4.2

Skill development

4.3

Work-life balance

4.4

Salary

4.0

Job security

4.1

Company culture

3.6

Promotions

4.1

Work satisfaction

Explore 27 Reviews and Ratings
Assistant Manager
217 salaries
unlock blur

₹6.6 L/yr - ₹18.5 L/yr

Senior Engineer
206 salaries
unlock blur

₹5 L/yr - ₹14 L/yr

Engineer
183 salaries
unlock blur

₹2.8 L/yr - ₹12 L/yr

Associate Manager
179 salaries
unlock blur

₹9 L/yr - ₹23.1 L/yr

Senior Executive
154 salaries
unlock blur

₹5 L/yr - ₹19.1 L/yr

Explore more salaries
Compare Siemens Gamesa Renewable Power Private Limited with

Suzlon Group

4.0
Compare

Vestas

4.3
Compare

Inox Wind

3.7
Compare

GE Vernova

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview