I applied via LinkedIn and was interviewed before Sep 2022. There were 4 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.
Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment
Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities
Utilize software tools such as CMMS to track maintenance activities and schedule fu...
Surge control in compressor is essential to prevent damage and maintain efficiency.
Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.
Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.
Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.
Proper surge...
Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.
Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.
Key factors for synchronisation include voltage, frequency, and phase angle matching.
Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...
Assistant Manager
204
salaries
| ₹6.6 L/yr - ₹18.4 L/yr |
Senior Engineer
201
salaries
| ₹4.7 L/yr - ₹13.7 L/yr |
Engineer
187
salaries
| ₹2.8 L/yr - ₹12 L/yr |
Associate Manager
186
salaries
| ₹9 L/yr - ₹23.1 L/yr |
Senior Executive
157
salaries
| ₹5 L/yr - ₹19.7 L/yr |
Suzlon Group
Vestas
Inox Wind
GE Vernova