I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
Process gear oil replacement is the procedure of draining out old gear oil from a system and refilling it with fresh gear oil.
Drain out old gear oil from the system
Ensure proper disposal of the old gear oil
Refill the system with fresh gear oil
Follow manufacturer's guidelines for the type and amount of gear oil to be used
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
Design and standards for drafting a diagram involve following established guidelines and principles.
Designing a diagram involves understanding the purpose and audience of the diagram.
Standards for drafting a diagram include using appropriate symbols, labels, and dimensions.
Diagrams should be clear, concise, and accurately represent the intended information.
Following industry-specific standards and conventions is import...
I applied via Referral and was interviewed in May 2020. There was 1 interview round.
Activities at site with safety rules
Conducting regular safety inspections
Providing personal protective equipment (PPE) to workers
Ensuring proper training of workers on safety procedures
Maintaining proper signage and warnings
Implementing emergency response plans
Enforcing strict adherence to safety rules and regulations
Regularly reviewing and updating safety policies and procedures
Handling off cranes at site involves proper planning, coordination and safety measures.
Ensure proper communication between crane operator and ground personnel
Inspect crane and rigging equipment before use
Ensure proper weight distribution and load capacity
Use proper hand signals and follow safety protocols
Train personnel on proper crane operation and safety measures
Examples: lifting heavy equipment, materials, or struct
posted on 28 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
posted on 7 Feb 2022
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before Mar 2021. There were 3 interview rounds.
based on 3 interviews
Interview experience
based on 1 review
Rating in categories
Deputy Manager
225
salaries
| ₹5 L/yr - ₹17.5 L/yr |
Manager
166
salaries
| ₹5.8 L/yr - ₹23 L/yr |
Senior Engineer
143
salaries
| ₹4 L/yr - ₹11.7 L/yr |
Engineer
85
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Senior Manager
65
salaries
| ₹10 L/yr - ₹32 L/yr |
BHEL
Thermax Limited
Siemens
Alstom Transportation