Filter interviews by
I applied via Company Website
Top trending discussions
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I have extensive expertise in DFIG generators and their applications in various industries.
I have worked on the design and development of DFIG generators for wind turbines.
I have experience in troubleshooting and maintenance of DFIG generators.
I am familiar with the control systems used in DFIG generators.
I have knowledge of the latest advancements in DFIG generator technology.
I have worked on projects involving the in...
posted on 16 May 2024
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
Technical interview with concerned HOD
About power plants activities
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
The IR resistance of a motor refers to the insulation resistance, which measures the resistance of the insulation material surrounding the motor windings.
IR resistance is measured in ohms and indicates the ability of the insulation to prevent current leakage.
A higher IR resistance value indicates better insulation quality and less risk of electrical faults.
Regular testing of IR resistance is important to ensure the mot...
I appeared for an interview before Mar 2024, where I was asked the following questions.
I appeared for an interview in Oct 2017.
Questions related to torque, gearbox, torque limiter and coupling failure, yawing system bearing, and accumulator.
Torque is a measure of rotational force.
Gearbox works by transmitting power from the engine to the wheels.
Torque limiter failure can be caused by overloading or overheating.
Coupling failure can be caused by misalignment or excessive torque.
Yawing system bearing is a type of roller bearing used to support th...
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
based on 3 interviews
Interview experience
based on 1 review
Rating in categories
Deputy Manager
222
salaries
| ₹5 L/yr - ₹17.5 L/yr |
Senior Engineer
162
salaries
| ₹4 L/yr - ₹12 L/yr |
Manager
161
salaries
| ₹5.8 L/yr - ₹24.1 L/yr |
Engineer
85
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Senior Manager
63
salaries
| ₹10 L/yr - ₹32 L/yr |
Vestas
Dhoot Transmission
Hitachi Energy
Siemens Energy