Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
Top trending discussions
I was interviewed in Oct 2017.
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
I have 2 years of experience in the wind field.
I have worked on wind turbine design and optimization projects.
I have conducted wind resource assessments for potential wind farm sites.
I have experience in analyzing wind data and performing wind flow modeling.
I have knowledge of wind energy conversion systems and their components.
I have worked with software tools like WindPRO and WAsP for wind energy analysis.
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
About past experience
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 13 Apr 2022
I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.
Journal knowledge of plastic raw material and their defect
posted on 13 Oct 2022
IC engine stands for Internal Combustion Engine which converts fuel into mechanical energy.
IC engine is used in automobiles, generators, and other machinery.
It works by burning fuel inside a combustion chamber to create high-pressure gases that move a piston.
There are two types of IC engines: spark-ignition (petrol) and compression-ignition (diesel).
IC engines require a wire harness to connect various electrical compon...
A petrol engine is an internal combustion engine that uses petrol as fuel to power the vehicle.
Petrol engines are commonly used in cars, motorcycles, and small aircraft.
They work by igniting a mixture of petrol and air in a combustion chamber, which creates a small explosion that pushes a piston.
This motion is transferred to the crankshaft, which turns the wheels of the vehicle.
Petrol engines are known for their high p...
An automobile is a motor vehicle designed for transportation on roads.
It typically has four wheels and is powered by an internal combustion engine or electric motor.
Automobiles come in various types such as sedans, SUVs, trucks, and vans.
They are used for personal transportation, commercial transportation, and racing.
Examples of popular automobile brands include Toyota, Ford, BMW, and Tesla.
posted on 5 Dec 2021
I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.
Quality is a crucial aspect of any product or service in the present times.
Quality is a key factor in customer satisfaction and loyalty.
Quality control measures ensure that products meet the required standards.
Quality assurance processes help in identifying and addressing potential issues before they become major problems.
Quality management systems like Six Sigma and Lean help in improving overall quality and efficienc...
posted on 9 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
Seven QC tools are a set of basic quality control tools used to identify and solve quality problems.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Stratification
Cause-and-effect diagrams
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Quality Engineer
317
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
99
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer Trainee (Get)
90
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Samvardhana Motherson Group
TVS Sundram Fasteners
Ramkrishna Forgings