I applied via Referral and was interviewed before Nov 2020. There were 5 interview rounds.
WAH stands for Working at Heights. It refers to the practice of working in elevated areas and the safety standards associated with it.
WAH is an acronym for Working at Heights.
It involves working in elevated areas such as rooftops, scaffolding, or ladders.
The WAH standard includes guidelines and regulations to ensure the safety of workers.
It emphasizes the use of fall protection equipment like harnesses, guardrails, and...
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance of buildings or structures.
Scaffolding is typically made of metal or wood and consists of platforms, braces, and supports.
It is used to provide a safe working platform for workers at heights.
Scaffolding is commonly used in construction, maintenance, and repair of buildings, bridges, and other structures.
Example...
MSDS stands for Material Safety Data Sheet. It is a document that provides information about the potential hazards and safe handling of a chemical substance.
MSDS is a comprehensive document that contains detailed information about a chemical substance, including its physical and chemical properties, potential hazards, and safety precautions.
It is typically provided by the manufacturer or supplier of the chemical and is...
Method of statement is a written document that outlines the steps and procedures to be followed for a specific task or project.
Method of statement is used in industries such as construction, engineering, and manufacturing.
It includes details such as the scope of work, materials required, equipment needed, and safety precautions.
The method of statement is usually prepared by the contractor or project manager and submitt...
The construction field in India follows various rules and regulations to ensure safety and compliance.
The Building and Other Construction Workers Act, 1996
The Construction and Demolition Waste Management Rules, 2016
The National Building Code of India, 2016
The Occupational Safety, Health and Working Conditions Code, 2020
The Environment Protection Act, 1986
The Water (Prevention and Control of Pollution) Act, 1974
The Air
A lifeline is a safety line used to prevent falls and injuries in high-risk work environments.
Lifelines are typically made of rope or cable and are attached to a secure anchor point.
Workers wear a harness that is connected to the lifeline, allowing them to move freely while still being protected from falls.
Lifelines should be inspected regularly and replaced if any damage is found.
OSHA has specific regulations regardin...
TPI stands for Third Party Inspection. It is conducted by an independent party to ensure compliance with standards and regulations.
TPI is a process where an external party assesses the quality and safety of a product or service
It is commonly used in industries such as manufacturing, construction, and oil and gas
TPI helps to verify that the product or service meets the required specifications and standards
The frequency ...
Lifting gears are equipment used to lift heavy loads. They require regular maintenance and checking to ensure safety.
Lifting gears include cranes, hoists, slings, and shackles.
Maintenance should be done regularly to ensure proper functioning and safety.
Checking standards include load testing, visual inspections, and non-destructive testing.
Proper training and certification is required for operators and inspectors.
Any d...
Color coding is a system of assigning colors to objects or areas to indicate their purpose or level of hazard.
Color coding is commonly used in workplaces to improve safety and organization.
Different colors can be used to indicate different types of hazards, such as red for fire hazards or yellow for caution.
Color coding can also be used to designate specific areas for certain activities, such as green for first aid sta...
HIRA and JSEA are risk assessment tools used in occupational health and safety.
HIRA stands for Hazard Identification and Risk Assessment. It is a systematic process of identifying potential hazards and evaluating the associated risks.
JSEA stands for Job Safety and Environmental Analysis. It is a tool used to identify potential hazards and assess the risks associated with a specific job or task.
Both HIRA and JSEA are im...
PTW stands for Permit to Work. It is a formal written system used to control high-risk activities.
PTW is used to ensure that all necessary safety measures are taken before starting a high-risk activity.
It involves a written permit that must be obtained before starting the work.
The permit outlines the hazards associated with the work and the precautions that must be taken to mitigate those hazards.
PTW is commonly used i...
Electrical safety refers to measures taken to prevent electrical hazards and ensure safe use of electrical equipment.
Electrical safety standards are set by organizations such as OSHA and NFPA.
These standards include guidelines for electrical equipment installation, maintenance, and use.
Examples of electrical safety measures include using grounded outlets, wearing protective gear when working with electricity, and prope...
Relevant area synapses of preparation through PPT
Doosan Power Systems interview questions for popular designations
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Worked as a Senior Planning and Cost Control Engineer at a construction company.
Managed project schedules and budgets to ensure timely completion and cost efficiency.
Collaborated with project managers, engineers, and contractors to develop and update project plans.
Analyzed project data to identify potential cost savings and efficiency improvements.
Prepared regular reports on project progress and financial performance.
I...
Get interview-ready with Top Doosan Power Systems Interview Questions
I applied via Walk-in
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Excavator is a heavy construction machine used for digging, Work at height refers to tasks performed above ground level, Hot work involves activities that generate heat or sparks, SWP stands for Safe Work Permit.
Excavator is a heavy construction machine used for digging trenches, foundations, and landscaping.
Work at height includes tasks such as working on scaffolding, roofs, or ladders.
Hot work involves activities lik...
There are different types of fire extinguishers for different types of fires, such as Class A, B, C, D, and K.
Class A fire extinguishers are for ordinary combustibles like wood and paper.
Class B fire extinguishers are for flammable liquids like gasoline and oil.
Class C fire extinguishers are for electrical fires.
Class D fire extinguishers are for flammable metals.
Class K fire extinguishers are for kitchen fires involvi
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
The duration of Doosan Power Systems interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 40 interviews
Interview experience
based on 551 reviews
Rating in categories
Deputy Manager
226
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
165
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
160
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
84
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
65
salaries
| ₹0 L/yr - ₹0 L/yr |
BHEL
Thermax Limited
Siemens
Alstom Transportation