Upload Button Icon Add office photos

Filter interviews by

Capacit'e Infraprojects Interview Questions, Process, and Tips

Updated 9 Sep 2024

Top Capacit'e Infraprojects Interview Questions and Answers

View all 42 questions

Capacit'e Infraprojects Interview Experiences

Popular Designations

52 interviews found

Interview Questionnaire 

4 Questions

  • Q1. Column & beam lapping zone, beam extra bar why provide
  • Q2. Concrete grade slump
  • Q3. Column chacking steel bbs
  • Q4. Full form ffl toc auto level etc
  • Ans. 

    FFL - Finished Floor Level, TOC - Top of Concrete, Auto Level - A surveying instrument used for measuring horizontal and vertical levels.

    • FFL is the final level of a floor after all construction work is completed.

    • TOC is the highest point of a concrete surface.

    • Auto Level is a surveying instrument that uses a telescope and a spirit level to measure horizontal and vertical levels.

    • FFL and TOC are important in construction t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Introduct

Assistant Engineer - Civil Interview Questions asked at other Companies

Q1. If the cubes are failed then what will you do ?
View answer (7)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Salary related disscad
  • Q2. Any disscad to employees salary package
Round 3 - One-on-one 

(1 Question)

  • Q1. Work related questions and your company work progress questions

Civil Site Supervisor Interview Questions asked at other Companies

Q1. Which survey in earths 🌍 measurement Survay carefully?
View answer (1)

I applied via Company Website and was interviewed before Aug 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. What type of lubricant and lubrication system used in egines?
  • Ans. 

    Engines typically use engine oil as a lubricant, which is circulated through the engine by a pressurized lubrication system.

    • Engines typically use engine oil as a lubricant to reduce friction between moving parts

    • The lubrication system in engines includes components such as oil pumps, oil filters, and oil passages

    • There are different types of lubrication systems such as splash lubrication, pressure lubrication, and dry su...

  • Answered by AI
  • Q2. Detailed information about pumps and pressure?
  • Ans. 

    Pumps are mechanical devices used to move fluids by applying pressure. Pressure is the force applied over a specific area.

    • Pumps are used to increase the pressure of a fluid to move it from one place to another.

    • Pressure is the force applied perpendicular to the surface of an object per unit area.

    • Different types of pumps include centrifugal pumps, positive displacement pumps, and diaphragm pumps.

    • Pressure can be measured ...

  • Answered by AI
  • Q3. Thermal analysis of engines?
  • Ans. 

    Thermal analysis of engines involves studying heat transfer, combustion efficiency, and cooling systems to optimize performance.

    • Thermal analysis helps in understanding how heat is generated and transferred within the engine.

    • It also involves evaluating combustion efficiency to ensure maximum power output.

    • Cooling systems are analyzed to prevent overheating and maintain optimal operating temperatures.

    • Examples include usin...

  • Answered by AI
  • Q4. What is plant & Machinery?
  • Ans. 

    Plant & Machinery refers to the equipment and machinery used in industrial settings for production and manufacturing processes.

    • Plant refers to the large machinery and equipment used in industrial processes

    • Machinery includes tools, devices, and equipment used for specific tasks

    • Examples include conveyor belts, forklifts, cranes, and manufacturing equipment

  • Answered by AI
  • Q5. Material properties used in making hight strength engine and structure?
  • Ans. 

    High strength engines and structures require materials with specific properties such as high tensile strength, toughness, and corrosion resistance.

    • High tensile strength to withstand high loads and stresses

    • Toughness to resist fracture and deformation

    • Corrosion resistance to protect against environmental factors

    • Lightweight materials to reduce overall weight of the engine or structure

    • Heat resistance to withstand high tempe...

  • Answered by AI
  • Q6. What is turbocharger, intercooler, cooling system, lubrication system etc.?
  • Ans. 

    Turbocharger, intercooler, cooling system, and lubrication system are components used in machinery to enhance performance and efficiency.

    • Turbocharger is a device that increases the efficiency and power output of an engine by forcing extra air into the combustion chamber.

    • Intercooler is used to cool the compressed air from the turbocharger before it enters the engine, increasing its density and performance.

    • Cooling system...

  • Answered by AI
  • Q7. Question about your experience related field.
Round 3 - HR 

(4 Questions)

  • Q1. What is your strength your respective fields?
  • Q2. How you'll handle stress and pressure at working site?
  • Q3. Where you see yourself in 5years downline?
  • Q4. Salary expectations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with formal and be frequent and extrovert. They deal in construction and they like it.

Top Capacit'e Infraprojects Plant Machinery Engineer Interview Questions and Answers

Q1. What type of lubricant and lubrication system used in egines?
View answer (2)

Plant Machinery Engineer Interview Questions asked at other Companies

Q1. What type of lubricant and lubrication system used in egines?
View answer (2)

I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the percentage of coupler and Rebar lapping
  • Ans. 

    The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.

    • The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.

    • The percentage can range from 25% to 100% depending on the design requirements.

    • Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space constrai...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. HR asked for salary and negotiate

Interview Preparation Tips

Interview preparation tips for other job seekers - It was nice interview.interviwer was very decent and energetic.

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)

Capacit'e Infraprojects interview questions for popular designations

 Assistant Manager

 (2)

 bbs engineer

 (2)

 Billing Engineer

 (2)

 Billing Manager

 (2)

 Engineer

 (2)

 Senior Billing Engineer

 (2)

 Senior Engineer

 (2)

 Administration Officer

 (1)

Interview experience
-
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2018. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Salary Expectation?
  • Q2. How early you can join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare job specific answers

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Get interview-ready with Top Capacit'e Infraprojects Interview Questions

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Can you work 12 hrs?
  • Q2. Will you attend Sunday for work ??

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go to the company . Except for self-growth, everything is worse. Salary, management, and Seniors are illiterate .just have administrative experience and no technical knowledge.

Project Executive Engineer Interview Questions asked at other Companies

Q1. 2. What all are the points need to consider while preparing the site safety plan?
View answer (1)

Jobs at Capacit'e Infraprojects

View all

Engineer-Plant And Machinery Interview Questions & Answers

user image Anonymous

posted on 1 Oct 2022

I applied via Walk-in and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical knowledge about Equipment handled, troubleshooting and maintenance
  • Q2. Personal details, accommodation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Must be strong technical knowledge, if like to more hike and joining organization without any references

I applied via Newspaper Ad and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Ask question related running projects.firm wok, BBS,
  • Q2. Difficulty in execution work. Grade and streanth of concrete.
  • Ans. 

    Difficulty in execution work can arise due to various factors including grade and strength of concrete.

    • The grade and strength of concrete must be carefully selected based on the requirements of the project.

    • Inadequate curing of concrete can lead to lower strength and durability.

    • The use of improper mix proportions can also result in weaker concrete.

    • The quality of raw materials used in concrete production can affect its s...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Capacit'e Infraprojects Sr.Engineer-Projects interview:
  • Mivan shuttering
Interview preparation tips for other job seekers - Capacite is good company for work.
Friendly staff, learn new mathod of work

Sr.Engineer-Projects Interview Questions asked at other Companies

Q1. What is the procedure to define one way and two way slab.How you will fix the reinforcement for two way slab
View answer (1)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. General about what is written in CV
  • Q2. Management level questions
  • Q3. Costing budgetting

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer what u write in CV

Assistant Vice President Interview Questions asked at other Companies

Q1. What measurements previous employer taken after infamous Cobra Post operation?
View answer (1)
Interview experience
3
Average
Difficulty level
-
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Can prepare bar bending schedule ?
  • Ans. 

    Yes, I can prepare bar bending schedule.

    • I have experience in preparing bar bending schedules for various projects.

    • I am proficient in using software such as AutoCAD and Excel to prepare the schedules.

    • I ensure that the schedules are accurate and comply with the project specifications.

    • I also coordinate with the project team to ensure that the schedules are delivered on time.

  • Answered by AI
  • Q2. What is the mix proportion of M30 ?
  • Ans. 

    The mix proportion of M30 is 1:1:2 (cement:sand:aggregate) by weight.

    • M30 is a grade of concrete used in construction.

    • The mix proportion of M30 is determined by weight.

    • The mix proportion of M30 is 1:1:2 (cement:sand:aggregate) by weight.

    • This means that for every 1 part cement, 1 part sand and 2 parts aggregate are used.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company, but need to do salary on time. work culture is good

Top Capacit'e Infraprojects Senior Billing Engineer Interview Questions and Answers

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
View answer (2)

Senior Billing Engineer Interview Questions asked at other Companies

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
View answer (2)

Capacit'e Infraprojects Interview FAQs

How many rounds are there in Capacit'e Infraprojects interview?
Capacit'e Infraprojects interview process usually has 2-3 rounds. The most common rounds in the Capacit'e Infraprojects interview process are Resume Shortlist, Technical and HR.
How to prepare for Capacit'e Infraprojects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Capacit'e Infraprojects. The most common topics and skills that interviewers at Capacit'e Infraprojects expect are Execution, Electricals, Software Development, Accounting and Planning.
What are the top questions asked in Capacit'e Infraprojects interview?

Some of the top questions asked at the Capacit'e Infraprojects interview -

  1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockw...read more
  2. What type of lubricant and lubrication system used in egin...read more
  3. What do you mean by basic rate variati...read more
How long is the Capacit'e Infraprojects interview process?

The duration of Capacit'e Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Capacit'e Infraprojects Interview Process

based on 8 interviews in last 1 year

Interview experience

3.5
  
Good
View more

Interview Questions from Similar Companies

Larsen & Toubro Limited Interview Questions
4.0
 • 1.4k Interviews
L&T Construction Interview Questions
4.0
 • 692 Interviews
Simplex Infrastructures Interview Questions
3.3
 • 65 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
IRB Infrastructure Interview Questions
4.0
 • 17 Interviews
View all

Capacit'e Infraprojects Reviews and Ratings

based on 751 reviews

3.6/5

Rating in categories

3.4

Skill development

3.3

Work-life balance

3.2

Salary

3.3

Job security

3.3

Company culture

3.0

Promotions

3.3

Work satisfaction

Explore 751 Reviews and Ratings
ERP Specialist

Mumbai

3-5 Yrs

â‚ą 3-6 LPA

Construction Manager

Navi Mumbai

12-20 Yrs

â‚ą 20-25 LPA

Assistant Audit Manager - Billing & Planning, Contracts

Navi Mumbai,

Mumbai

7-10 Yrs

â‚ą 6-7 LPA

Explore more jobs
Senior Engineer
143 salaries
unlock blur

â‚ą4.5 L/yr - â‚ą10 L/yr

Assistant Manager
97 salaries
unlock blur

â‚ą5.8 L/yr - â‚ą12 L/yr

Civil Site Engineer
66 salaries
unlock blur

â‚ą3 L/yr - â‚ą6.5 L/yr

Junior Engineer
52 salaries
unlock blur

â‚ą2 L/yr - â‚ą4 L/yr

Civil Engineer
51 salaries
unlock blur

â‚ą2.5 L/yr - â‚ą6.5 L/yr

Explore more salaries
Compare Capacit'e Infraprojects with

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.4
Compare

Simplex Infrastructures

3.3
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview