The mix proportion of M30 is 1:1:2 (cement:sand:aggregate) by weight.
M30 is a grade of concrete used in construction.
The mix proportion of M30 is determined by weight.
The mix proportion of M30 is 1:1:2 (cement:sand:aggregate) by weight.
This means that for every 1 part cement, 1 part sand and 2 parts aggregate are used.
Yes, I can prepare bar bending schedule.
I have experience in preparing bar bending schedules for various projects.
I am proficient in using software such as AutoCAD and Excel to prepare the schedules.
I ensure that the schedules are accurate and comply with the project specifications.
I also coordinate with the project team to ensure that the schedules are delivered on time.
Yes, I can prepare BBS (Bar Bending Schedule).
I have experience in preparing BBS for various projects.
I am proficient in using software like AutoCAD and Excel for BBS preparation.
I ensure that the BBS is accurate and meets the project requirements.
I also coordinate with the site team to ensure timely delivery of BBS.
Basic rate variation is due to changes in the scope of work, while rate escalation is due to inflation or market changes.
Basic rate variation occurs due to changes in the scope of work, such as additional work or changes in the design.
Rate escalation occurs due to inflation or market changes, such as an increase in the cost of materials or labor.
Basic rate variation is typically negotiated and agreed upon before t...
Yes, I am familiar with Rate Analysis. A rate analysis for blockwork involves calculating the cost of materials, labor, and equipment needed for the project.
Determine the quantity of materials needed for the blockwork
Calculate the cost of materials per unit
Estimate the labor cost based on the time required for the project
Include equipment costs such as scaffolding and tools
Add all costs together to determine the t...
Basic rate variation refers to the change in the standard rate of a particular item or service.
It is a change in the standard rate of a particular item or service
It can be due to various factors such as inflation, market demand, etc.
For example, if the basic rate of a product is $10 and it increases to $12, it is a basic rate variation.
Yes, I am familiar with item rate billing.
Item rate billing is a method of billing where each item or service is charged separately.
It is commonly used in construction and engineering projects.
The rates for each item are pre-determined and agreed upon by both parties.
This type of billing allows for greater transparency and accuracy in billing.
It also allows for easier tracking of expenses and budgeting.
Yes, I am familiar with material testing.
I have experience in conducting various tests on materials such as tensile strength, hardness, impact resistance, and corrosion resistance.
I am proficient in using testing equipment such as universal testing machines, hardness testers, and spectrometers.
I am knowledgeable in various testing standards such as ASTM, ISO, and ASME.
I have worked with a variety of materials incl...
The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.
The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.
The percentage can range from 25% to 100% depending on the design requirements.
Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space con...
MIS reports should consider data accuracy, relevance, timeliness, and presentation.
Accuracy of data
Relevance of data to the report's purpose
Timeliness of data
Clear and concise presentation of data
Consistency in data formatting
Identification of trends and patterns in data
Comparison of current data with historical data
Inclusion of key performance indicators (KPIs)
I appeared for an interview in Feb 2025.
I have extensive experience in project management, overseeing steel construction projects from planning to execution.
Led a team of 15 in a large-scale commercial building project, ensuring timely completion within budget.
Implemented project management software to streamline communication and track progress, resulting in a 20% increase in efficiency.
Conducted regular safety meetings and inspections, reducing workplace i...
Typical floors are standard floors found in most buildings, while non-typical floors are unique or specialized floors.
Typical floors are commonly found in residential and commercial buildings, with standard layouts and designs.
Non-typical floors may include features such as mezzanine levels, atriums, or specialized spaces like auditoriums or laboratories.
Non-typical floors often require custom design and construction t...
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
I have previously used software such as Bluebeam, Procore, and Microsoft Excel for quantity surveying and billing purposes.
Bluebeam
Procore
Microsoft Excel
Reconciliation of bills involves comparing invoices with purchase orders and delivery receipts to ensure accuracy and resolve discrepancies.
Verify that all billed items match the agreed upon prices and quantities
Investigate any discrepancies and resolve them with vendors or suppliers
Ensure that all payments are accurately recorded and accounted for
Maintain detailed records of all billing transactions for auditing purpo...
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
The type of steel used in slabs is typically reinforced steel bars, also known as rebar.
Reinforced steel bars are commonly used in slabs to provide tensile strength and prevent cracking.
Different grades of steel can be used depending on the structural requirements of the slab.
Examples of steel types used in slabs include ASTM A615 Grade 60 and ASTM A706 Grade 60 rebar.
At my last company, I managed diverse civil engineering projects, focusing on sustainable design and efficient project delivery.
Led a team of engineers on a major highway expansion project, improving traffic flow by 30%.
Implemented green building practices in a commercial development, reducing energy consumption by 25%.
Collaborated with local authorities to ensure compliance with environmental regulations, resulting in...
My last salary was competitive and reflected my experience and contributions to the projects I worked on.
I earned $75,000 annually, which was in line with industry standards for my level of experience.
My salary included performance bonuses based on project success, which added an additional 10% to my earnings.
I also received benefits such as health insurance and a retirement plan, which enhanced my overall compensation...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Civil Site Engineers oversee construction projects, ensuring quality, safety, and compliance with regulations.
Project Planning: Develop detailed project plans and schedules, e.g., creating timelines for road construction.
Site Supervision: Monitor daily operations on-site to ensure adherence to design specifications and safety standards.
Quality Control: Conduct inspections and tests on materials, e.g., checking concrete...
Building construction involves a series of systematic steps from planning to completion, ensuring structural integrity and safety.
1. Site Preparation: Clearing the land and setting up temporary facilities.
2. Foundation Work: Excavating and pouring concrete for a stable base.
3. Framing: Constructing the skeleton of the building using wood or steel.
4. Roofing: Installing the roof structure and covering materials.
5. Utili...
Top trending discussions
The duration of Capacit'e Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 65 interview experiences
Difficulty level
Duration
based on 860 reviews
Rating in categories
Senior Engineer
156
salaries
| ₹4.7 L/yr - ₹9.5 L/yr |
Assistant Manager
98
salaries
| ₹8.4 L/yr - ₹13.3 L/yr |
Civil Site Engineer
60
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Junior Engineer
54
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Safety Officer
47
salaries
| ₹3 L/yr - ₹6 L/yr |
L&T Construction
Tata Projects
Simplex Infrastructures
ITD Cementation India