I applied via Job Fair and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. All technical questions QS &Billing
  • Q2. BBS and Form Work, Billing procedure

Interview Preparation Tips

Interview preparation tips for other job seekers - All questions are asked from QS and Billing related.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before May 2022. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Mode of measurement as per is 1200
  • Ans. 

    IS 1200 specifies the mode of measurement for billing purposes.

    • IS 1200 is a standard set by the Bureau of Indian Standards for measurement in billing.

    • It specifies the units of measurement to be used for different types of goods and services.

    • For example, for electricity billing, the unit of measurement is kilowatt-hour (kWh), while for water billing, it is cubic meter (m³).

  • Answered by AI
  • Q2. Labor rate of built up area
  • Ans. 

    Labor rate of built up area is the cost of labor per unit area for construction or maintenance work.

    • Labor rate is calculated by dividing the total labor cost by the total built up area.

    • It is usually expressed in terms of cost per square foot or cost per square meter.

    • Labor rate varies depending on the type of work, location, and skill level of the workers.

    • For example, the labor rate for painting a room may be different ...

  • Answered by AI
  • Q3. Software like BS
  • Q4. How to control the certification of contractors bills with client claimed
  • Ans. 

    Certification of contractor bills can be controlled by implementing a thorough verification process.

    • Establish clear guidelines for billing and certification

    • Verify all billable items against the contract and work completed

    • Ensure all necessary documentation is provided and accurate

    • Implement a review process for all bills before certification

    • Communicate with clients regularly to address any concerns or discrepancies

  • Answered by AI
  • Q5. Rate analysis of extra items etc
  • Ans. 

    Rate analysis of extra items is a process of evaluating the cost of additional items or services provided beyond the standard package.

    • Identify the extra items or services provided

    • Determine the cost of each item or service

    • Calculate the total cost of all extra items or services

    • Compare the cost with industry standards and adjust accordingly

    • Communicate the cost to the customer clearly and transparently

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep confident on same what you have worked in past according make your CV and prepared as pe market based questions.

Billing Manager Interview Questions Asked at Other Companies

asked in SGS
Q1. How to calculate the length of reinforment steel in bar bending s ... read more
Q2. How to control the certification of contractors bills with client ... read more
Q3. What is variations & extra items.
Q4. Rate analysis of extra items etc
Q5. Mode of measurement as per is 1200

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..
Contribute & help others!
anonymous
You can choose to be anonymous

Capacit'e Infraprojects Interview FAQs

How many rounds are there in Capacit'e Infraprojects Billing Manager interview?
Capacit'e Infraprojects interview process usually has 2 rounds. The most common rounds in the Capacit'e Infraprojects interview process are Resume Shortlist and Technical.
What are the top questions asked in Capacit'e Infraprojects Billing Manager interview?

Some of the top questions asked at the Capacit'e Infraprojects Billing Manager interview -

  1. How to control the certification of contractors bills with client clai...read more
  2. Rate analysis of extra items ...read more
  3. Mode of measurement as per is 1...read more

Recently Viewed

INTERVIEWS

Navneet Education

No Interviews

INTERVIEWS

Kwality Pharmaceuticals

No Interviews

SALARIES

Aptech

INTERVIEWS

CenturyPly

No Interviews

INTERVIEWS

Greenlam Industries

No Interviews

INTERVIEWS

Knowcraft Analytics

No Interviews

INTERVIEWS

Greenlam Industries

No Interviews

INTERVIEWS

Knowcraft Analytics

No Interviews

INTERVIEWS

Greenlam Industries

No Interviews

INTERVIEWS

Navneet Education

No Interviews

Tell us how to improve this page.

Capacit'e Infraprojects Billing Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Capacit'e Infraprojects Billing Manager Salary
based on 9 salaries
₹10.5 L/yr - ₹15.8 L/yr
43% more than the average Billing Manager Salary in India
View more details

Capacit'e Infraprojects Billing Manager Reviews and Ratings

based on 2 reviews

3.1/5

Rating in categories

3.5

Skill development

2.5

Work-life balance

3.1

Salary

3.1

Job security

3.1

Company culture

2.5

Promotions

2.5

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
116 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
97 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
63 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
57 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
53 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Capacit'e Infraprojects with

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.3
Compare

Simplex Infrastructures

3.3
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview