IS 1200 specifies the mode of measurement for billing purposes.
IS 1200 is a standard set by the Bureau of Indian Standards for measurement in billing.
It specifies the units of measurement to be used for different types of goods and services.
For example, for electricity billing, the unit of measurement is kilowatt-hour (kWh), while for water billing, it is cubic meter (m³).
Labor rate of built up area is the cost of labor per unit area for construction or maintenance work.
Labor rate is calculated by dividing the total labor cost by the total built up area.
It is usually expressed in terms of cost per square foot or cost per square meter.
Labor rate varies depending on the type of work, location, and skill level of the workers.
For example, the labor rate for painting a room may be different ...
Certification of contractor bills can be controlled by implementing a thorough verification process.
Establish clear guidelines for billing and certification
Verify all billable items against the contract and work completed
Ensure all necessary documentation is provided and accurate
Implement a review process for all bills before certification
Communicate with clients regularly to address any concerns or discrepancies
Rate analysis of extra items is a process of evaluating the cost of additional items or services provided beyond the standard package.
Identify the extra items or services provided
Determine the cost of each item or service
Calculate the total cost of all extra items or services
Compare the cost with industry standards and adjust accordingly
Communicate the cost to the customer clearly and transparently
I appeared for an interview in Feb 2025.
I have extensive experience in project management, overseeing steel construction projects from planning to execution.
Led a team of 15 in a large-scale commercial building project, ensuring timely completion within budget.
Implemented project management software to streamline communication and track progress, resulting in a 20% increase in efficiency.
Conducted regular safety meetings and inspections, reducing workplace i...
Typical floors are standard floors found in most buildings, while non-typical floors are unique or specialized floors.
Typical floors are commonly found in residential and commercial buildings, with standard layouts and designs.
Non-typical floors may include features such as mezzanine levels, atriums, or specialized spaces like auditoriums or laboratories.
Non-typical floors often require custom design and construction t...
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
Capacit'e Infraprojects interview questions for popular designations
Civil Site Engineers oversee construction projects, ensuring quality, safety, and compliance with regulations.
Project Planning: Develop detailed project plans and schedules, e.g., creating timelines for road construction.
Site Supervision: Monitor daily operations on-site to ensure adherence to design specifications and safety standards.
Quality Control: Conduct inspections and tests on materials, e.g., checking concrete...
Building construction involves a series of systematic steps from planning to completion, ensuring structural integrity and safety.
1. Site Preparation: Clearing the land and setting up temporary facilities.
2. Foundation Work: Excavating and pouring concrete for a stable base.
3. Framing: Constructing the skeleton of the building using wood or steel.
4. Roofing: Installing the roof structure and covering materials.
5. Utili...
Get interview-ready with Top Capacit'e Infraprojects Interview Questions
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
I have previously used software such as Bluebeam, Procore, and Microsoft Excel for quantity surveying and billing purposes.
Bluebeam
Procore
Microsoft Excel
Reconciliation of bills involves comparing invoices with purchase orders and delivery receipts to ensure accuracy and resolve discrepancies.
Verify that all billed items match the agreed upon prices and quantities
Investigate any discrepancies and resolve them with vendors or suppliers
Ensure that all payments are accurately recorded and accounted for
Maintain detailed records of all billing transactions for auditing purpo
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
The type of steel used in slabs is typically reinforced steel bars, also known as rebar.
Reinforced steel bars are commonly used in slabs to provide tensile strength and prevent cracking.
Different grades of steel can be used depending on the structural requirements of the slab.
Examples of steel types used in slabs include ASTM A615 Grade 60 and ASTM A706 Grade 60 rebar.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
The duration of Capacit'e Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 62 interviews
Interview experience
based on 792 reviews
Rating in categories
Senior Engineer
117
salaries
| ₹4.7 L/yr - ₹9.4 L/yr |
Assistant Manager
92
salaries
| ₹5.8 L/yr - ₹12 L/yr |
Civil Site Engineer
63
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Junior Engineer
56
salaries
| ₹2 L/yr - ₹4 L/yr |
Civil Engineer
53
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon