Upload Button Icon Add office photos

Capacit'e Infraprojects

Compare button icon Compare button icon Compare

Filter interviews by

Capacit'e Infraprojects Civil Site Supervisor Interview Questions and Answers

Updated 10 Jan 2024

Capacit'e Infraprojects Civil Site Supervisor Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Salary related disscad
  • Q2. Any disscad to employees salary package
Round 3 - One-on-one 

(1 Question)

  • Q1. Work related questions and your company work progress questions

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Auto level, Sg top, Gsb top, Dlc, etc, my experience 03 year 07 months.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. 1. defferent between plasticizer and super plasticizer .? 2.MT capacity ? 3. Thickness of plaster.
  • Ans. 

    Plasticizer and superplasticizer are both additives used in construction, but they have different properties and applications.

    • Plasticizer is used to improve the workability and flow of concrete by reducing water content.

    • Superplasticizer is a more powerful version of plasticizer, capable of significantly increasing the workability of concrete without increasing water content.

    • Plasticizer is typically used in applications...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Working with different methods
  • Q2. Civil construction work
Round 2 - Group Discussion 

About the work at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil construction work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(5 Questions)

  • Q1. Documents chake
  • Q2. Documents chake and send to Interview Table
  • Q3. Current Salary CTC and Except Salary CTC
  • Q4. Where your Native Place
  • Q5. Apply Job Position
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. What is concrete
  • Ans. 

    Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction for its strength and durability.

    • Concrete is made by mixing cement, water, and aggregates like sand and gravel.

    • It hardens over time through a chemical process called hydration.

    • Concrete is used in construction for building foundations, roads, bridges, and more.

    • There are different types of concrete, such as re

  • Answered by AI
  • Q2. What is the column
  • Ans. 

    A column is a vertical structural element that supports the weight of the structure above it.

    • Columns are typically made of concrete, steel, or wood.

    • They are used to transfer loads from the structure above to the foundation below.

    • Columns come in various shapes and sizes, such as square, rectangular, or circular.

    • Columns can be found in buildings, bridges, and other structures.

    • Columns are essential for providing stability

  • Answered by AI
  • Q3. What is the foundation
  • Ans. 

    The foundation is the lowest part of a building, typically below ground level, that supports and anchors the structure.

    • The foundation distributes the weight of the building and prevents settling or movement.

    • There are different types of foundations, such as shallow foundations (e.g. strip, raft) and deep foundations (e.g. piles, caissons).

    • The type of foundation used depends on factors like soil conditions, building size

  • Answered by AI
  • Q4. What is the floor
  • Ans. 

    The floor is the bottom surface of a room or building on which people walk.

    • The floor provides a stable surface for walking, sitting, and placing furniture.

    • Different materials can be used for flooring such as wood, tile, carpet, or concrete.

    • Flooring can be designed for specific purposes like durability in high-traffic areas or aesthetics in living spaces.

  • Answered by AI
  • Q5. What is the minimum
  • Ans. 

    The minimum qualifications for a Civil Site Supervisor typically include a relevant degree or certification, experience in construction or civil engineering, and knowledge of building codes and regulations.

    • Minimum qualification typically includes a degree in civil engineering or related field

    • Experience in construction or civil engineering is usually required

    • Knowledge of building codes and regulations is essential

    • Certif...

  • Answered by AI
  • Q6. What is the steel
  • Ans. 

    Steel is a versatile and commonly used construction material known for its strength and durability.

    • Steel is an alloy of iron and carbon, with other elements such as manganese, chromium, or nickel added for specific properties.

    • It is commonly used in construction for beams, columns, and reinforcement in concrete structures.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildin...

  • Answered by AI
  • Q7. Proper question

Interview Preparation Tips

Interview preparation tips for other job seekers - CareerBuilder
careerbuilder.com › blog
"My best advice for job seekers is...": A roundup of advice
Round 1 - One-on-one 

(1 Question)

  • Q1. Steel shutering rcc foundation work

Interview Preparation Tips

Interview preparation tips for other job seekers - Which date and time interview in area field exicative

Interview Questionnaire 

1 Question

  • Q1. Site related

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

Capacit'e Infraprojects Interview FAQs

How many rounds are there in Capacit'e Infraprojects Civil Site Supervisor interview?
Capacit'e Infraprojects interview process usually has 3 rounds. The most common rounds in the Capacit'e Infraprojects interview process are One-on-one Round, Resume Shortlist and HR.

Tell us how to improve this page.

Capacit'e Infraprojects Civil Site Supervisor Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Capacit'e Infraprojects Civil Site Supervisor Salary
based on 5 salaries
₹3.3 L/yr - ₹4.8 L/yr
25% more than the average Civil Site Supervisor Salary in India
View more details

Capacit'e Infraprojects Civil Site Supervisor Reviews and Ratings

based on 7 reviews

4.4/5

Rating in categories

2.5

Skill development

4.2

Work-life balance

3.4

Salary

3.8

Job security

3.0

Company culture

3.1

Promotions

3.0

Work satisfaction

Explore 7 Reviews and Ratings
Senior Engineer
143 salaries
unlock blur

₹4.5 L/yr - ₹9.4 L/yr

Assistant Manager
92 salaries
unlock blur

₹5.8 L/yr - ₹12 L/yr

Civil Site Engineer
63 salaries
unlock blur

₹3 L/yr - ₹6.5 L/yr

Junior Engineer
56 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Civil Engineer
53 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Capacit'e Infraprojects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview