L&T Construction Civil Site Supervisor Interview Questions, Process, and Tips

Updated 9 Feb 2025

Top L&T Construction Civil Site Supervisor Interview Questions and Answers

View all 7 questions

L&T Construction Civil Site Supervisor Interview Experiences

5 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Working with different methods
  • Q2. Civil construction work
Round 2 - Group Discussion 

About the work at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil construction work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. What is concrete
  • Ans. 

    Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction for its strength and durability.

    • Concrete is made by mixing cement, water, and aggregates like sand and gravel.

    • It hardens over time through a chemical process called hydration.

    • Concrete is used in construction for building foundations, roads, bridges, and more.

    • There are different types of concrete, such as re

  • Answered by AI
  • Q2. What is the column
  • Ans. 

    A column is a vertical structural element that supports the weight of the structure above it.

    • Columns are typically made of concrete, steel, or wood.

    • They are used to transfer loads from the structure above to the foundation below.

    • Columns come in various shapes and sizes, such as square, rectangular, or circular.

    • Columns can be found in buildings, bridges, and other structures.

    • Columns are essential for providing stability

  • Answered by AI
  • Q3. What is the foundation
  • Ans. 

    The foundation is the lowest part of a building, typically below ground level, that supports and anchors the structure.

    • The foundation distributes the weight of the building and prevents settling or movement.

    • There are different types of foundations, such as shallow foundations (e.g. strip, raft) and deep foundations (e.g. piles, caissons).

    • The type of foundation used depends on factors like soil conditions, building size

  • Answered by AI
  • Q4. What is the floor
  • Ans. 

    The floor is the bottom surface of a room or building on which people walk.

    • The floor provides a stable surface for walking, sitting, and placing furniture.

    • Different materials can be used for flooring such as wood, tile, carpet, or concrete.

    • Flooring can be designed for specific purposes like durability in high-traffic areas or aesthetics in living spaces.

  • Answered by AI
  • Q5. What is the minimum
  • Ans. 

    The minimum qualifications for a Civil Site Supervisor typically include a relevant degree or certification, experience in construction or civil engineering, and knowledge of building codes and regulations.

    • Minimum qualification typically includes a degree in civil engineering or related field

    • Experience in construction or civil engineering is usually required

    • Knowledge of building codes and regulations is essential

    • Certif...

  • Answered by AI
  • Q6. What is the steel
  • Ans. 

    Steel is a versatile and commonly used construction material known for its strength and durability.

    • Steel is an alloy of iron and carbon, with other elements such as manganese, chromium, or nickel added for specific properties.

    • It is commonly used in construction for beams, columns, and reinforcement in concrete structures.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildin...

  • Answered by AI
  • Q7. Proper question

Interview Preparation Tips

Interview preparation tips for other job seekers - CareerBuilder
careerbuilder.com › blog
"My best advice for job seekers is...": A roundup of advice

Civil Site Supervisor Interview Questions Asked at Other Companies

Q1. Which survey in earths 🌍 measurement Survay carefully?
Q2. Which reasons is sudden failer situation of structure?
Q3. What's Moduler Ratio of design mix concrete?
Q4. Why we provide deep beam in building structure?
Q5. What is responsibility civil site supervisor?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(5 Questions)

  • Q1. Documents chake
  • Q2. Documents chake and send to Interview Table
  • Q3. Current Salary CTC and Except Salary CTC
  • Q4. Where your Native Place
  • Q5. Apply Job Position
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. 1. defferent between plasticizer and super plasticizer .? 2.MT capacity ? 3. Thickness of plaster.
  • Ans. 

    Plasticizer and superplasticizer are both additives used in construction, but they have different properties and applications.

    • Plasticizer is used to improve the workability and flow of concrete by reducing water content.

    • Superplasticizer is a more powerful version of plasticizer, capable of significantly increasing the workability of concrete without increasing water content.

    • Plasticizer is typically used in applications...

  • Answered by AI

L&T Construction interview questions for designations

 Civil Supervisor

 (4)

 Site Supervisor

 (8)

 Civil Site Engineer

 (33)

 Site Engineer/Site Supervisor

 (1)

 Electrical Site Supervisor

 (1)

 Senior Civil Site Engineer

 (1)

 Civil Site & Billing Engineer

 (1)

 Civil Engineer and Site Supervisor

 (2)

Round 1 - One-on-one 

(1 Question)

  • Q1. Steel shutering rcc foundation work

Interview Preparation Tips

Interview preparation tips for other job seekers - Which date and time interview in area field exicative

Get interview-ready with Top L&T Construction Interview Questions

Interview questions from similar companies

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Civil Site Supervisor interview?
L&T Construction interview process usually has 1-2 rounds. The most common rounds in the L&T Construction interview process are Technical, One-on-one Round and Resume Shortlist.
What are the top questions asked in L&T Construction Civil Site Supervisor interview?

Some of the top questions asked at the L&T Construction Civil Site Supervisor interview -

  1. 1. defferent between plasticizer and super plasticizer .? 2.MT capacity ? 3. Th...read more
  2. What is the foundat...read more
  3. What is concr...read more

Tell us how to improve this page.

L&T Construction Civil Site Supervisor Interview Process

based on 8 interviews

Interview experience

4.5
  
Good
View more
L&T Construction Civil Site Supervisor Salary
based on 43 salaries
₹2.1 L/yr - ₹5.5 L/yr
6% more than the average Civil Site Supervisor Salary in India
View more details

L&T Construction Civil Site Supervisor Reviews and Ratings

based on 14 reviews

4.5/5

Rating in categories

4.6

Skill development

4.3

Work-life balance

4.3

Salary

4.5

Job security

4.3

Company culture

4.3

Promotions

4.3

Work satisfaction

Explore 14 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview