Filter interviews by
FFL - Finished Floor Level, TOC - Top of Concrete, Auto Level - A surveying instrument used for measuring horizontal and vertical levels.
FFL is the final level of a floor after all construction work is completed.
TOC is the highest point of a concrete surface.
Auto Level is a surveying instrument that uses a telescope and a spirit level to measure horizontal and vertical levels.
FFL and TOC are important in construction t...
Top trending discussions
posted on 2 Oct 2024
posted on 14 Feb 2024
posted on 20 Jun 2024
Hydraulic refers to the study of fluids in motion and the engineering applications of fluid mechanics.
Hydraulic engineering involves the design and construction of structures that control the flow and pressure of liquids, such as dams, canals, and pipelines.
Hydraulic systems use fluid pressure to generate, control, and transmit power, commonly found in machinery like hydraulic lifts and brakes.
Hydraulic principles are ...
posted on 8 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Carpet area of a building can be calculated by measuring the inner dimensions of the building excluding the walls.
Measure the length and width of each room in the building
Exclude the thickness of walls from the measurements
Calculate the area of each room by multiplying length and width
Sum up the areas of all rooms to get the total carpet area of the building
posted on 23 Jan 2022
I applied via Approached by company and was interviewed in Dec 2021. There was 1 interview round.
Answering questions related to concrete mix, IS codes, cement setting time, clear cover, transition curve, supervisor elevation, pavement design, and beam cover.
Mix ratio of concrete is the proportion of cement, sand, and aggregate used in the mixture.
IS codes are Indian Standards codes that provide guidelines for construction materials and practices.
Setting time of cement is the time taken by cement to harden and gain...
posted on 18 Sep 2023
MDD of GSB stands for Maximum Dry Density of Granular Sub Base, which is a key parameter in civil engineering for road construction.
MDD is the maximum density that can be achieved for a particular granular material under specific compaction conditions.
It is typically measured in the laboratory using a standard compaction test such as Proctor compaction test.
The MDD value helps in determining the optimum moisture conten...
The carriage way width of a four-lane road is typically around 7 meters.
Carriage way width is the total width of the road available for vehicles to travel in one direction.
For a four-lane road, the carriage way width is usually divided equally among the lanes.
In this case, each lane would have a width of approximately 1.75 meters.
The total width of the road including all lanes and any additional features like shoulders
posted on 25 Jan 2025
I was interviewed before Jan 2024.
posted on 13 Jan 2024
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
posted on 6 Jun 2020
I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Senior Engineer
148
salaries
| ₹4.5 L/yr - ₹9.5 L/yr |
Assistant Manager
97
salaries
| ₹5.8 L/yr - ₹12 L/yr |
Civil Site Engineer
63
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Junior Engineer
53
salaries
| ₹2 L/yr - ₹4 L/yr |
Senior Civil Engineer
48
salaries
| ₹3.8 L/yr - ₹8.5 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Simplex Infrastructures
Nagarjuna Construction Company