I was interviewed in Mar 2017.
Working hours of an equipment can be calculated by subtracting the start time from the end time.
Obtain the start time and end time of the equipment's operation.
Convert the start and end times to a common time format, such as hours and minutes.
Subtract the start time from the end time to calculate the duration of operation.
Consider any breaks or downtime during the operation and subtract them from the total duration.
The...
Depreciation is the decrease in the value of an asset over time due to wear and tear, obsolescence, or other factors.
Depreciation is a method used in accounting to allocate the cost of an asset over its useful life.
It represents the reduction in the value of an asset on the balance sheet.
Depreciation can be calculated using various methods such as straight-line, declining balance, or units of production.
Example: A comp...
The per hour cost of operating a batching plant depends on various factors such as the size of the plant, the type of materials being processed, and the labor and maintenance costs.
The size of the batching plant affects the operating cost. Larger plants generally have higher operating costs due to increased energy consumption and maintenance requirements.
The type of materials being processed also impacts the cost. Diff...
Top trending discussions
posted on 21 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
posted on 3 Mar 2024
Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.
Calculate the surface area of the structure that needs formwork
Determine the type of formwork material to be used
Consider the complexity of the structure and any special requirements
Account for wastage and extra material for safety
Use standard formulas or software for accurate calculations
posted on 28 Nov 2023
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
I have completed 5 years of billing and execution work in the civil engineering field.
I have 5 years of experience in handling billing and execution work in civil engineering projects.
During these years, I have successfully managed the billing process and ensured accurate and timely invoicing.
I have also coordinated with project teams and contractors to track progress and ensure proper execution of work.
In addition, I ...
My expectation of CTC is based on my experience, skills, and market standards.
Consider my experience and skills in the field
Research market standards for Billing Engineer Civil
Take into account the company's budget and compensation structure
Negotiate based on the value I can bring to the organization
Be open to discussing other benefits and perks
posted on 22 Nov 2023
I applied via Campus Placement and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 23 Nov 2022
Problems you've faced during construction
posted on 28 Jun 2022
I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 11 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
Client bills are submitted by verifying the services provided and charges incurred, generating an invoice, and sending it to the client.
Verify services provided and charges incurred
Generate invoice
Send invoice to client
Variations & extra items refer to additional charges or changes made to a standard billing item.
Variations can include changes in pricing due to location, time of day, or other factors.
Extra items can include additional services or products added to a standard billing item.
These charges are typically added on top of the standard billing item and can increase the overall cost.
Examples include a hotel charging extra for ...
posted on 22 Jun 2024
posted on 17 Mar 2024
I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
Earth cutting as per CPWD norms involves following specific guidelines for excavation work.
CPWD norms specify the depth and width of excavation for different types of soil
The guidelines also include safety measures to be followed during earth cutting
Proper disposal of excavated material is also a key aspect of CPWD norms
Deductions in measurements include shrinkage, wastage, breakage, and spillage.
Shrinkage: Reduction in size or weight of materials during handling or storage.
Wastage: Loss of materials during the construction process.
Breakage: Damage to materials during transportation or handling.
Spillage: Accidental loss of materials due to spills or leaks.
based on 1 review
Rating in categories
Project Engineer
133
salaries
| ₹3.6 L/yr - ₹9.9 L/yr |
Assistant Manager
74
salaries
| ₹5.5 L/yr - ₹13.4 L/yr |
Civil Engineer
69
salaries
| ₹2.7 L/yr - ₹6.1 L/yr |
Mechanical Engineer
37
salaries
| ₹2.6 L/yr - ₹7.2 L/yr |
Deputy Manager
35
salaries
| ₹7.3 L/yr - ₹16 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA