I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
Client bills are submitted by verifying the services provided and charges incurred, generating an invoice, and sending it to the client.
Verify services provided and charges incurred
Generate invoice
Send invoice to client
Variations & extra items refer to additional charges or changes made to a standard billing item.
Variations can include changes in pricing due to location, time of day, or other factors.
Extra items can include additional services or products added to a standard billing item.
These charges are typically added on top of the standard billing item and can increase the overall cost.
Examples include a hotel charging extra for ...
Top trending discussions
posted on 30 Jun 2024
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
posted on 20 Nov 2022
I applied via Job Fair and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 23 Nov 2022
Problems you've faced during construction
posted on 28 Jun 2022
I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 1 Sep 2017
I was interviewed in Mar 2017.
Working hours of an equipment can be calculated by subtracting the start time from the end time.
Obtain the start time and end time of the equipment's operation.
Convert the start and end times to a common time format, such as hours and minutes.
Subtract the start time from the end time to calculate the duration of operation.
Consider any breaks or downtime during the operation and subtract them from the total duration.
The...
Depreciation is the decrease in the value of an asset over time due to wear and tear, obsolescence, or other factors.
Depreciation is a method used in accounting to allocate the cost of an asset over its useful life.
It represents the reduction in the value of an asset on the balance sheet.
Depreciation can be calculated using various methods such as straight-line, declining balance, or units of production.
Example: A comp...
The per hour cost of operating a batching plant depends on various factors such as the size of the plant, the type of materials being processed, and the labor and maintenance costs.
The size of the batching plant affects the operating cost. Larger plants generally have higher operating costs due to increased energy consumption and maintenance requirements.
The type of materials being processed also impacts the cost. Diff...
posted on 29 May 2023
I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.
posted on 18 May 2023
I applied via Company Website and was interviewed before May 2022. There was 1 interview round.
IS 1200 specifies the mode of measurement for billing purposes.
IS 1200 is a standard set by the Bureau of Indian Standards for measurement in billing.
It specifies the units of measurement to be used for different types of goods and services.
For example, for electricity billing, the unit of measurement is kilowatt-hour (kWh), while for water billing, it is cubic meter (m³).
Labor rate of built up area is the cost of labor per unit area for construction or maintenance work.
Labor rate is calculated by dividing the total labor cost by the total built up area.
It is usually expressed in terms of cost per square foot or cost per square meter.
Labor rate varies depending on the type of work, location, and skill level of the workers.
For example, the labor rate for painting a room may be different ...
Certification of contractor bills can be controlled by implementing a thorough verification process.
Establish clear guidelines for billing and certification
Verify all billable items against the contract and work completed
Ensure all necessary documentation is provided and accurate
Implement a review process for all bills before certification
Communicate with clients regularly to address any concerns or discrepancies
Rate analysis of extra items is a process of evaluating the cost of additional items or services provided beyond the standard package.
Identify the extra items or services provided
Determine the cost of each item or service
Calculate the total cost of all extra items or services
Compare the cost with industry standards and adjust accordingly
Communicate the cost to the customer clearly and transparently
posted on 3 Mar 2024
Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.
Calculate the surface area of the structure that needs formwork
Determine the type of formwork material to be used
Consider the complexity of the structure and any special requirements
Account for wastage and extra material for safety
Use standard formulas or software for accurate calculations
posted on 21 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Civil Site Engineer
227
salaries
| ₹2.2 L/yr - ₹8.6 L/yr |
Site Engineer
216
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Quantity Surveyor
56
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |
Senior Planning Engineer
53
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Manager
47
salaries
| ₹9.7 L/yr - ₹19.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA