Erection procedure involves planning, preparation, and execution of the erection process for a structure or equipment.
The procedure starts with a detailed plan and schedule for the erection process.
The site is prepared by clearing the area and setting up the necessary equipment and tools.
The foundation is laid and the structure or equipment is assembled piece by piece.
Safety measures are taken throughout the process to...
The crane capacity used to lift U girder depends on the weight of the girder.
The weight of the U girder needs to be determined first
The crane capacity should be greater than the weight of the U girder
Factors such as the length and width of the U girder should also be considered
Example: If the U girder weighs 50 tons, the crane capacity should be at least 60 tons
The contractor rate for erection in measurement varies depending on the project and location.
The rate can be hourly, daily, or project-based.
Factors that affect the rate include the complexity of the project, the location, and the experience of the contractor.
For example, in New York City, the average hourly rate for an erection engineer is $50-$100.
It is important to negotiate the rate and have a clear contract before
I applied via Company Website and was interviewed in Oct 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
Apco Infratech interview questions for popular designations
Get interview-ready with Top Apco Infratech Interview Questions
A data entry operator is responsible for inputting and updating data into computer systems accurately and efficiently.
Inputting and updating data into computer systems
Ensuring accuracy and efficiency in data entry
Verifying and correcting data errors
Maintaining confidentiality and security of data
Organizing and managing data files
Generating reports and summaries from data
Using data entry software and tools
Following data
I applied via Approached by Company and was interviewed before May 2022. There were 4 interview rounds.
I applied via Company Website and was interviewed in Dec 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
Some of the top questions asked at the Apco Infratech interview -
The duration of Apco Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 129 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Mumbai
10-20 Yrs
₹ 9.23-15.5 LPA
Assistant Manager
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Officer
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure