Filter interviews by
I applied via Walk-in and was interviewed in Mar 2021. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
Safety refers to the measures taken to prevent accidents, injuries, and other harmful incidents.
Safety involves identifying and assessing potential hazards and taking steps to eliminate or control them.
It also involves providing training and education to employees to ensure they understand how to work safely.
Regular inspections and audits are necessary to ensure safety standards are being met.
Examples of safety measure...
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
Apco Infratech interview questions for popular designations
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Get interview-ready with Top Apco Infratech Interview Questions
I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Nov 2020. There were 5 interview rounds.
Top trending discussions
Some of the top questions asked at the Apco Infratech interview -
The duration of Apco Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 129 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Mumbai
10-20 Yrs
₹ 9.23-15.5 LPA
Assistant Manager
138
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Officer
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure