i
TÜV SÜD
Filter interviews by
I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There were 4 interview rounds.
I solve problems on site by identifying the root cause and implementing effective solutions.
I analyze the problem thoroughly to understand its underlying causes.
I collaborate with the team to gather relevant information and perspectives.
I prioritize the critical errors based on their impact and urgency.
I develop and implement action plans to address the identified issues.
I monitor the progress of the solutions and make...
Managing site and local vendors in a project involves effective communication, coordination, and relationship building.
Establish clear expectations and requirements with vendors
Regularly communicate project updates and progress to vendors
Coordinate vendor activities to ensure they align with project timelines
Monitor vendor performance and address any issues promptly
Build strong relationships with vendors based on trust...
Managing site progress involves monitoring and tracking the project's timeline and milestones.
Create a detailed project schedule with clear deadlines and milestones
Regularly review and update the schedule to ensure progress is on track
Communicate with the project team to identify any potential delays or issues
Implement strategies to mitigate risks and address any obstacles
Monitor the actual progress against the planned...
I was interviewed before Oct 2022.
TÜV SÜD interview questions for popular designations
Temperature and irradiance affect the performance and efficiency of solar panels.
High temperatures can decrease the efficiency of solar panels.
Increased irradiance levels can lead to higher power output.
Temperature coefficient determines the panel's performance at different temperatures.
Irradiance levels vary based on factors like time of day, weather conditions, and panel orientation.
Temperature and irradiance should
Co-generation plants produce both electricity and heat. They can be linked with solar PV plants to increase energy efficiency.
Co-generation plants use a single fuel source to produce both electricity and heat
Solar PV plants generate electricity from sunlight
Linking co-generation plants with solar PV plants can increase overall energy efficiency
Excess heat from co-generation plants can be used to power solar thermal sys...
Get interview-ready with Top TÜV SÜD Interview Questions
Leaping length is the distance between two consecutive supports of a bridge or a beam.
Leaping length is also known as span length.
It is an important factor in the design of bridges and beams.
The leaping length determines the maximum load that the structure can bear.
For example, a bridge with a leaping length of 50 meters can bear heavier loads than a bridge with a leaping length of 30 meters.
UTM stands for Universal Transverse Mercator, a coordinate system used to locate positions on the Earth's surface.
UTM divides the Earth into 60 zones, each 6 degrees of longitude wide.
It uses a grid system to give a unique location to every point on the Earth's surface.
UTM coordinates are given in meters, making it easy to measure distances and areas.
It is commonly used in mapping, surveying, and navigation application...
The 20 in M20 refers to the compressive strength of concrete in megapascals after 28 days of curing.
M20 is a mix of concrete with a compressive strength of 20 MPa after 28 days of curing.
The compressive strength of concrete is the maximum load it can bear before crushing.
The strength of concrete depends on the ratio of cement, sand, and aggregate used in the mix.
Other grades of concrete include M10, M15, M25, M30, etc....
I applied via Approached by Company and was interviewed before Aug 2021. There was 1 interview round.
An embankment is a raised structure made of soil or other materials used to support a roadway or railway track.
Embankments are commonly used in transportation infrastructure to raise the level of the roadway or railway track above the surrounding terrain.
They are typically made of soil, rock, or other materials that are compacted and shaped to form a stable structure.
Embankments can also be used to control erosion alon...
I applied via Walk-in and was interviewed before Nov 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2021. There were 5 interview rounds.
To ensure time lines, saving, and integrity, it is important to establish clear communication, set realistic goals, and implement effective monitoring and evaluation systems.
Establish clear communication channels and protocols to ensure timely and accurate information exchange
Set realistic goals and timelines based on available resources and constraints
Implement effective monitoring and evaluation systems to track prog...
What people are saying about TÜV SÜD
Interview experience
based on 988 reviews
Rating in categories
Pune,
Delhi/Ncr
+118-28 Yrs
Not Disclosed
Inspection Engineer
238
salaries
| ₹2.2 L/yr - ₹9.3 L/yr |
Assistant Manager
105
salaries
| ₹4.3 L/yr - ₹13.5 L/yr |
Lead Auditor
90
salaries
| ₹5.4 L/yr - ₹16 L/yr |
Field Engineer
86
salaries
| ₹1.9 L/yr - ₹5 L/yr |
Senior Analyst
80
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Bureau Veritas
DNV GL
Intertek
SGS