To prepare welder qualification as per ASME, follow ASME Section IX guidelines, conduct welder performance qualification tests, and maintain records.
Follow ASME Section IX guidelines for welder qualification
Conduct welder performance qualification tests such as visual examination, bend test, and radiographic testing
Maintain records of welder qualifications and requalification tests
Ensure welders are trained and certifi...
The documents required for the inspection of material and work include specifications, drawings, test plans, inspection reports, and certificates.
Specifications: Provide detailed information about the required standards and quality of the material and work.
Drawings: Illustrate the design and dimensions of the material and work to be inspected.
Test plans: Outline the procedures and criteria for conducting tests on the m...
Before commissioning a transformer, inspection can be done by following these steps:
Check for any physical damage or signs of overheating on the transformer
Inspect the insulation system for any signs of degradation or contamination
Verify the correct installation of all components and connections
Perform electrical tests to ensure proper functioning and performance
Check the oil level and quality in oil-filled transformer...
I applied via Naukri.com and was interviewed in Jun 2022. There were 8 interview rounds.
Your experience of ex-company so other wise test submit.
Group discussion is the very important .
TUV SUD is the good company.
I applied via Approached by Company and was interviewed before Aug 2021. There was 1 interview round.
An embankment is a raised structure made of soil or other materials used to support a roadway or railway track.
Embankments are commonly used in transportation infrastructure to raise the level of the roadway or railway track above the surrounding terrain.
They are typically made of soil, rock, or other materials that are compacted and shaped to form a stable structure.
Embankments can also be used to control erosion alon...
TÜV SÜD interview questions for designations
I applied via Naukri.com and was interviewed before Jan 2021. There was 1 interview round.
What people are saying about TÜV SÜD
posted on 15 Sep 2024
I applied via Campus Placement and was interviewed in Aug 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
Maths Questions,about our course related Questions,5s, safety related questions
I was interviewed in Aug 2023.
Time constant of an RC circuit is the time taken for the voltage across the capacitor to reach approximately 63.2% of its final value.
Time constant (τ) is calculated as the product of resistance (R) and capacitance (C) in the circuit, τ = R * C.
It represents the rate at which the capacitor charges or discharges in response to a step change in voltage.
A smaller time constant indicates a faster response of the circuit, w...
Comparators are electronic circuits that compare two voltages and output a digital signal based on the comparison. Band pass filter circuit allows only a certain range of frequencies to pass through.
Comparators are used in applications such as voltage level detection, waveform shaping, and pulse width modulation.
They have two input terminals for the voltages to be compared and one output terminal for the digital signal...
Interview experience
based on 78 reviews
Rating in categories
Inspection Engineer
206
salaries
| ₹2.2 L/yr - ₹9.3 L/yr |
Assistant Manager
95
salaries
| ₹4.3 L/yr - ₹13.5 L/yr |
Lead Auditor
90
salaries
| ₹5.4 L/yr - ₹16 L/yr |
Field Engineer
86
salaries
| ₹1.9 L/yr - ₹5 L/yr |
Senior Analyst
70
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Bureau Veritas
DNV GL
SGS
UL Solutions