I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
Maths Questions,about our course related Questions,5s, safety related questions
Top trending discussions
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
Diploma in electrical engineering
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
I follow various NDT methods such as visual inspection, liquid penetrant testing, magnetic particle testing, ultrasonic testing, and radiographic testing.
Visual inspection involves examining the surface of a component for any visible defects.
Liquid penetrant testing uses a liquid dye to detect surface-breaking defects.
Magnetic particle testing uses magnetic fields to identify surface and near-surface defects.
Ultrasonic...
I applied via AmbitionBox and was interviewed in Feb 2023. There were 2 interview rounds.
To grow production, focus on optimizing processes, increasing efficiency, and investing in technology.
Analyze current production processes and identify areas for improvement
Implement lean manufacturing principles to eliminate waste and increase efficiency
Invest in new technology and equipment to improve production speed and quality
Train and develop employees to improve skills and knowledge
Collaborate with suppliers and...
Quantity control in production can be achieved through various methods.
Setting production targets and monitoring progress regularly
Implementing quality control measures to avoid defects and rework
Using statistical process control techniques to identify and correct variations
Regularly auditing the production process to ensure compliance with standards
Training and empowering employees to identify and report quality issue...
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
Diploma in electrical engineering
To prepare welder qualification as per ASME, follow ASME Section IX guidelines, conduct welder performance qualification tests, and maintain records.
Follow ASME Section IX guidelines for welder qualification
Conduct welder performance qualification tests such as visual examination, bend test, and radiographic testing
Maintain records of welder qualifications and requalification tests
Ensure welders are trained and certifi...
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
I follow various NDT methods such as visual inspection, liquid penetrant testing, magnetic particle testing, ultrasonic testing, and radiographic testing.
Visual inspection involves examining the surface of a component for any visible defects.
Liquid penetrant testing uses a liquid dye to detect surface-breaking defects.
Magnetic particle testing uses magnetic fields to identify surface and near-surface defects.
Ultrasonic...
The documents required for the inspection of material and work include specifications, drawings, test plans, inspection reports, and certificates.
Specifications: Provide detailed information about the required standards and quality of the material and work.
Drawings: Illustrate the design and dimensions of the material and work to be inspected.
Test plans: Outline the procedures and criteria for conducting tests on the m...
Before commissioning a transformer, inspection can be done by following these steps:
Check for any physical damage or signs of overheating on the transformer
Inspect the insulation system for any signs of degradation or contamination
Verify the correct installation of all components and connections
Perform electrical tests to ensure proper functioning and performance
Check the oil level and quality in oil-filled transformer...
I applied via AmbitionBox and was interviewed in Feb 2023. There were 2 interview rounds.
To grow production, focus on optimizing processes, increasing efficiency, and investing in technology.
Analyze current production processes and identify areas for improvement
Implement lean manufacturing principles to eliminate waste and increase efficiency
Invest in new technology and equipment to improve production speed and quality
Train and develop employees to improve skills and knowledge
Collaborate with suppliers and...
Quantity control in production can be achieved through various methods.
Setting production targets and monitoring progress regularly
Implementing quality control measures to avoid defects and rework
Using statistical process control techniques to identify and correct variations
Regularly auditing the production process to ensure compliance with standards
Training and empowering employees to identify and report quality issue...
I applied via Naukri.com and was interviewed in Jun 2022. There were 8 interview rounds.
Your experience of ex-company so other wise test submit.
Group discussion is the very important .
TUV SUD is the good company.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Design Engineer
287
salaries
| ₹2.4 L/yr - ₹12 L/yr |
Service Engineer
215
salaries
| ₹1.8 L/yr - ₹9 L/yr |
Project Engineer
168
salaries
| ₹4.8 L/yr - ₹15 L/yr |
Senior Design Engineer
165
salaries
| ₹5.1 L/yr - ₹15.2 L/yr |
Senior Service Engineer
97
salaries
| ₹4.5 L/yr - ₹14 L/yr |
Ingersoll Rand
Sandvik Asia
Caterpillar Inc
Epiroc