Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.
The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.
Before excavation begins, proper permits and approvals must be obtained from relevant authorities.
Excavation equipment such as excavators, bulldozers, and ba...
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
posted on 14 Sep 2022
I was interviewed in Mar 2022.
I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.
Hard work and pipeline roadlines work...
All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines
I applied via Referral and was interviewed before Sep 2021. There were 2 interview rounds.
based on 10 reviews
Rating in categories
Junior Engineer
43
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Senior Engineer
32
salaries
| ₹3 L/yr - ₹8.6 L/yr |
Junior Engineer Civil
31
salaries
| ₹1.8 L/yr - ₹3.3 L/yr |
Civil Site Engineer
28
salaries
| ₹1.1 L/yr - ₹5.4 L/yr |
Planning Engineer
27
salaries
| ₹2.8 L/yr - ₹6.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group