I applied via Walk-in and was interviewed before Aug 2022. There were 3 interview rounds.
Extensive site experience in executing engineering projects
Managed construction activities on site
Coordinated with contractors and subcontractors
Ensured compliance with safety regulations
Resolved on-site technical issues
Performed quality control inspections
I applied via Walk-in and was interviewed before Jun 2020. There were 3 interview rounds.
Yes, I am familiar with Mivan formwork.
Mivan formwork is a type of aluminum formwork system used in construction.
It is known for its efficiency, speed, and quality in concrete construction.
The system involves assembling pre-engineered aluminum panels to form the concrete structure.
Mivan formwork is commonly used for high-rise buildings, residential complexes, and commercial projects.
It offers advantages such as reduced...
Yes, there are several other formwork systems apart from Mivan.
Traditional timber formwork
Steel formwork
Aluminum formwork
Climbing formwork
Tunnel formwork
Jump formwork
I have experience in software development using Java and Python.
Proficient in Java and Python programming languages
Experience in developing web applications using Spring framework
Familiarity with database management systems like MySQL and MongoDB
Knowledge of software development methodologies like Agile and Scrum
Yes, I have experience managing multiple buildings alone.
I have managed multiple buildings in my previous job
I am familiar with the maintenance and safety protocols
I have a system in place to prioritize tasks and manage time effectively
Top trending discussions
posted on 14 Mar 2022
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
General intelligence
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 20 Nov 2020
I applied via Campus Placement and was interviewed before Nov 2019. There were 5 interview rounds.
Escalation is the increase in cost or price of goods or services over time due to various factors.
Escalation is significant in construction projects where the cost of materials and labor can increase over time.
It is important to factor in escalation when creating project budgets and timelines.
The formula for escalation is: Escalated Cost = Base Cost x (1 + Escalation Rate)^Number of Years
For example, if the base cost o...
Penalty is a punishment for breach of contract while liquidity damages compensate for financial loss due to breach.
Penalty is a fixed amount agreed upon in the contract as a punishment for breach of contract.
Liquidity damages compensate for the actual financial loss suffered due to breach of contract.
Penalty is usually higher than the actual loss suffered while liquidity damages are calculated based on the actual loss.
...
Basic Price variation refers to the change in the cost of materials or labor used in a project.
Basic Price variation is a common clause in construction contracts.
It allows for adjustments to the contract price based on changes in the cost of materials or labor.
The variation can be positive or negative, depending on whether the cost has increased or decreased.
The variation is usually calculated using an agreed-upon form...
Yes, basic price variation is beneficial for a contract.
Basic price variation allows for adjustments to be made to the contract price based on changes in market conditions or material costs.
This helps to ensure that the contractor is not unfairly burdened with unexpected costs and can maintain profitability.
It also provides a level of transparency and accountability in the contract, as both parties are aware of the pot...
There are various types of contracts in construction projects. Each has its own advantages and drawbacks.
Types of contracts include lump sum, cost-plus, time and material, and unit price contracts.
Lump sum contracts provide a fixed price for the entire project, but can lead to disputes over changes.
Cost-plus contracts reimburse the contractor for all costs plus a fee, but can lead to inflated costs.
Time and material co...
posted on 28 Aug 2021
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
posted on 11 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
Mathematics, English, Reasoning
An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.
Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.
Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...
Clean India
Corruption
posted on 14 Jul 2021
posted on 22 Feb 2023
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
Populations forcasting in detail
Tipcall question mostly available to in ner
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Junior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
31
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group