TPF Engineering Assistant Engineer - Civil Interview Questions and Answers

Updated 14 Sep 2022

TPF Engineering Assistant Engineer - Civil Interview Experiences

1 interview found

I was interviewed in Mar 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All the basics of civil ingeering

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a good attitude and sound Basics knowledge of engineering

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Foundation installation process is oil and gas industry
  • Ans. Explain it as required as per industry requirement like Valid Permit, Valid lifting plan, Approved method statement, barrication,Sign boards, banks man, competent and certified equipment and operator, rigger, color coded and inspected lifting accessories, check wind speed limits, foggy or dusty weather conditions
  • Answered Anonymously
  • Q2. Excavation process for oil and gas industry
  • Ans. 

    Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.

    • The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.

    • Before excavation begins, proper permits and approvals must be obtained from relevant authorities.

    • Excavation equipment such as excavators, bulldozers, and ba...

  • Answered by AI
  • Q3. Valid Permit, approved method statement, Excavation certificate, check GPR (Ground penetrating radar)report, CAT (Cable avoidance Tool) Scan, Drawing, route marker, Trial pit, hard barricade the area, cert...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared as per your resume and for the post you apply for
If possible then Do some research about company and project that you apply for
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Company management
  • Q2. Machine fitness
  • Q3. Eco friendly management
  • Q4. Road management
  • Q5. Electricals system
Round 2 - Group Discussion 

I love construction line but one thing please provide some extra pay

Interview Preparation Tips

Interview preparation tips for other job seekers - According to my suggestion I love construction line ❤️

I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Bbs, shuttering, leveling, testing, quality.

Interview Preparation Tips

Interview preparation tips for other job seekers - Project monitoring, Project management, client management, project development, staff development skills

Interview Questionnaire 

6 Questions

  • Q1. They were asked about previous work experience in detail.
  • Q2. Previous Project details.
  • Q3. Previous projects shuttering area and type of formwork
  • Ans. 

    The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.

    • Used traditional timber formwork for a residential building project

    • Implemented modular steel formwork for a commercial complex

    • Utilized aluminum formwork for a high-rise construction

    • Employed tunnel formwork for an underground structure

  • Answered by AI
  • Q4. Build-up area
  • Q5. About subcontractors billing.
  • Q6. Formwork,steel and masonry work daily productive

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about your work.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Hard work,.road line..pipe line.. others
  • Q2. Hard work.. road line..pipe line..others
  • Q3. Hard work..road line
Round 2 - Assignment 

Hard work and pipeline roadlines work...

Round 3 - Civil foreman 

(4 Questions)

  • Q1. Hard work..road line pipe line
  • Ans. 

    All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage

  • Answered Anonymously
  • Q2. Hard work..road line pipe line work
  • Q3. Hard work..road line pipe line work ...
  • Q4. Hard work pipe line work
Round 4 - Assignment 

Hard work and pipeline roadlines work..

Round 5 - Technical 

(15 Questions)

  • Q1. Hard work and pipeline roadlines
  • Q2. Hard work and pipeline ..roadlines
  • Q3. Hard work and pipeline roadlines work.
  • Q4. Hard work and pipeline roadlines work..
  • Q5. JCB work road line pipe..
  • Q6. Hard work and pipeline ..roadlines work..
  • Q7. Hard work.. pipe line work..
  • Q8. Hard work and pipeline roadlines ok
  • Q9. Civil foreman complete documents and..
  • Q10. Hard work and JCB work road line pipe line..
  • Q11. Road line pipe line.
  • Q12. Hard work pipe line pipe line
  • Q13. Hard work pipe line..
  • Q14. Hard work road line..
  • Q15. JCB work road line..
Round 6 - Coding Test 

Hard work and pipeline roadlines work..

Round 7 - Coding Test 

Hard work and pipeline roadlines

Interview Preparation Tips

Topics to prepare for Archirodon Civil Foreman interview:
  • Civil foreman
  • Graduate
Interview preparation tips for other job seekers - Civil foreman complete documents and please let me

TPF Engineering Interview FAQs

How many rounds are there in TPF Engineering Assistant Engineer - Civil interview?
TPF Engineering interview process usually has 2 rounds. The most common rounds in the TPF Engineering interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

Eversendai Interview Questions
3.8
 • 28 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
Archirodon Interview Questions
3.9
 • 16 Interviews
View all

TPF Engineering Assistant Engineer - Civil Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

4.4

Skill development

5.0

Work-life balance

4.4

Salary

2.8

Job security

3.3

Company culture

4.4

Promotions

4.4

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
126 salaries
unlock blur

₹1.8 L/yr - ₹9.2 L/yr

Manager
19 salaries
unlock blur

₹4.6 L/yr - ₹9 L/yr

Assistant Manager Design
16 salaries
unlock blur

₹2.3 L/yr - ₹8 L/yr

Assistant Manager - Business Development
7 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Material Engineer
7 salaries
unlock blur

₹6.6 L/yr - ₹14.4 L/yr

Explore more salaries
Compare TPF Engineering with

Sterling & Wilson

4.1
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare

McNally Bharat Engineering

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview