Seismic design as per IRS codes involves following specific guidelines for structural safety during earthquakes.
Seismic design as per IRS codes focuses on ensuring structural safety during earthquakes
IRS codes provide guidelines for designing structures to withstand seismic forces
Factors such as building materials, foundation design, and structural elements are considered in seismic design as per IRS codes
Examples of s...
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
Interlocks are safety mechanisms that prevent equipment from operating under unsafe conditions.
Interlocks are used in various industries to prevent accidents and damage to equipment.
They can be mechanical, electrical, or software-based.
Examples include emergency stop buttons, safety gates, and pressure switches.
Interlocks are designed to be fail-safe, meaning that they will prevent operation even if a component fails.
T...
There are several types of safety measures in electrical engineering.
Electrical safety
Fire safety
Equipment safety
Personal safety
Environmental safety
posted on 3 May 2019
I applied via Referral
posted on 22 Feb 2023
HR life cycle refers to the stages of an employee's journey within an organization, from recruitment to exit.
The HR life cycle includes stages such as recruitment, onboarding, performance management, career development, and exit
Recruitment involves sourcing, screening, and selecting candidates for open positions
Onboarding includes orientation, training, and integration into the company culture
Performance management inv...
posted on 13 Nov 2023
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 3 interview rounds.
I love construction line but one thing please provide some extra pay
Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
Control wiring for ACB and VCB involves connecting control circuits to the breaker for proper operation.
Control wiring connects the breaker control circuits to the control panel.
The wiring should be properly sized and insulated.
The wiring should be color-coded for easy identification.
The wiring should be tested for proper operation before energizing the breaker.
Examples of control circuits include trip coil, close coil
Control wiring is read by understanding the symbols and connections on the diagram.
Identify the power source and the load
Understand the symbols used for switches, relays, and other components
Follow the connections and determine the control logic
Check for any safety interlocks or emergency stops
Verify the wiring matches the diagram
based on 1 interview
Interview experience
Assistant Manager
130
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager Design
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager - Business Development
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Material Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterling & Wilson
J K Fenner
Saudi Binladin Group
McNally Bharat Engineering