I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
posted on 16 Mar 2022
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
Quantity survey involves estimating and managing costs of construction projects, while billing is the process of invoicing clients for work done.
Quantity survey involves cost estimation, cost control, and contract administration.
Billing involves invoicing clients for work done, including labor, materials, and other expenses.
Quantity surveyors work closely with architects, engineers, and contractors to ensure projects a...
posted on 16 Mar 2022
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
Quantity survey involves estimating and managing costs of construction projects while billing is the process of invoicing clients for work done.
Quantity survey involves cost estimation, cost control, and cost management of construction projects.
Billing is the process of invoicing clients for work done on a project.
Quantity surveyors work closely with architects, engineers, and contractors to ensure that projects are co...
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
Before casting a tower foundation, several things need to be checked to ensure its stability and durability.
Check the soil condition and bearing capacity
Ensure proper reinforcement and formwork
Verify the dimensions and alignment of the foundation
Check for any obstructions or utilities in the excavation area
Ensure proper curing of the concrete
Verify compliance with local building codes and regulations
Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.
Measure the length and depth of the foundation
Measure the width at both ends and find the average width
Multiply the average width by the length and depth to get the volume
Calculate the quantity by multiplying the volume with the unit weight of concrete
I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Feb 2022. There was 1 interview round.
based on 1 interview
Interview experience
Assistant Manager
130
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager Design
16
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Executive
7
salaries
| ₹0 L/yr - ₹0 L/yr |
General Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterling & Wilson
J K Fenner
Saudi Binladin Group
McNally Bharat Engineering