i
TPF Engineering
Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed before Apr 2020. There were 3 interview rounds.
I have strong stress handling ability.
I prioritize tasks and manage my time effectively to avoid feeling overwhelmed.
I practice mindfulness and deep breathing techniques to stay calm in stressful situations.
I seek support from colleagues or a mentor when needed.
I maintain a healthy work-life balance to prevent burnout.
Example: During a high-pressure project, I delegated tasks to team members and communicated clearly to...
There are various types of construction contracts in India, each with its own unique features and benefits.
Lump Sum Contract: Fixed price for the entire project
Cost Plus Contract: Actual cost plus a fee for the contractor
Unit Price Contract: Payment based on the quantity of work completed
Design-Build Contract: Contractor responsible for both design and construction
Turnkey Contract: Contractor responsible for entire pro...
Clients in infrastructure sector vary based on the type of infrastructure.
Transportation: government agencies, private companies, logistics firms
Energy: power generation companies, utilities, renewable energy firms
Water: municipalities, water treatment companies, irrigation districts
Telecommunications: telecom companies, internet service providers
Construction: developers, contractors, architects
Public sector: governmen...
Tendering process involves inviting bids from potential suppliers for a project or service.
Identify the need for a project or service
Prepare a tender document outlining the requirements and evaluation criteria
Invite bids from potential suppliers through advertising or direct invitation
Evaluate the bids based on the criteria outlined in the tender document
Award the contract to the successful bidder
Negotiate terms and co...
EOI is an expression of interest while LOI is a letter of intent.
EOI is a preliminary document expressing interest in a project or opportunity.
LOI is a more formal document outlining the terms and conditions of a proposed agreement.
EOI is non-binding while LOI is usually binding.
EOI is used to gauge interest while LOI is used to negotiate and finalize a deal.
Examples of EOI include job applications and project proposal...
Top trending discussions
posted on 22 Feb 2023
HR life cycle refers to the stages of an employee's journey within an organization, from recruitment to exit.
The HR life cycle includes stages such as recruitment, onboarding, performance management, career development, and exit
Recruitment involves sourcing, screening, and selecting candidates for open positions
Onboarding includes orientation, training, and integration into the company culture
Performance management inv...
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Campus Placement and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Job Fair and was interviewed before Sep 2017. There was 0 interview round.
posted on 11 May 2018
I applied via Approached by Company and was interviewed in Jan 2018. There were 3 interview rounds.
posted on 24 Feb 2017
I was interviewed in Dec 2016.
QA focuses on preventing defects in the software development process, while QC focuses on identifying defects in the final product.
QA stands for Quality Assurance and QC stands for Quality Control.
QA is a proactive process that focuses on preventing defects by establishing processes and standards, while QC is a reactive process that focuses on identifying defects in the final product.
QA involves activities like require...
To judge the product physically, perform visual inspections, measurements, and functional tests.
Conduct visual inspections to check for any defects or abnormalities in the product's appearance.
Perform measurements to ensure the product meets the required specifications and tolerances.
Conduct functional tests to verify that the product performs its intended functions correctly.
Compare the physical attributes of the prod...
Concrete mix design is a process of determining the proportions of various ingredients to achieve desired properties of concrete.
Concrete mix design involves selecting suitable materials and determining their proportions.
The mix design considers factors such as strength, workability, durability, and economy.
IS standards, such as IS 10262, provide guidelines for concrete mix design in India.
The design process includes c...
Concrete cubes break more at the middle due to the distribution of stress and the presence of weak points.
The middle of the cube experiences the highest stress during compression testing.
The distribution of stress is not uniform throughout the cube.
The presence of weak points, such as air voids or aggregate discontinuities, can cause the cube to break at the middle.
The middle of the cube is where the maximum compressiv...
I was interviewed before Jul 2016.
Excavation is the process of removing earth or other materials from a site to create a hole or cavity.
Excavation is commonly done for construction purposes, such as building foundations or underground utilities.
It involves the use of heavy machinery, such as excavators or backhoes, to dig and remove the soil or rock.
Excavation may also be done for archaeological purposes to uncover artifacts or historical remains.
Safet...
Critical lifting refers to the process of lifting heavy objects or loads that require special attention and precautions to ensure safety.
Critical lifting involves assessing the weight and dimensions of the load to determine the appropriate lifting equipment and techniques.
It requires proper planning and coordination to minimize the risk of accidents and injuries.
Factors such as the stability of the load, the condition ...
JHA stands for Job Hazard Analysis. It is a systematic process used to identify and evaluate potential hazards in the workplace.
JHA is used to assess the risks associated with specific job tasks or activities.
It involves breaking down the job into steps, identifying potential hazards, and determining control measures to mitigate those hazards.
JHA helps in preventing accidents, injuries, and illnesses by proactively add...
Assistant Manager
130
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager Design
16
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Executive
7
salaries
| ₹0 L/yr - ₹0 L/yr |
General Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterling & Wilson
J K Fenner
Saudi Binladin Group
McNally Bharat Engineering