I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Core is the central part of a structure or object that provides strength and stability.
Core is commonly used in construction and engineering.
It is the central part of a building or structure that provides support and stability.
In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.
Examples of core materials include concrete, steel, and wood.
A strong core is important for maintain
Production refers to the process of creating goods or services using resources and labor.
Production involves transforming raw materials into finished products or providing services to customers.
It includes activities such as manufacturing, assembly, packaging, and distribution.
Examples of production include car manufacturing, food processing, and software development.
Efficient production is essential for businesses to
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 20 Jul 2017
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 20 Dec 2020
posted on 29 Jan 2021
posted on 12 Sep 2021
posted on 28 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is determined by Vicat apparatus
It is the time taken for the cement to lose its plasticity and become hard
The standard initial setting time for ordinary Portland cement is 30 minutes
Factors affecting initial setting time include temperature, water-cement ratio, and type of cement
The elongation % of steel fy 500 is approximately 12%.
Elongation % is the measure of ductility of a material.
It is the percentage increase in length of a material before it fractures under tension.
For steel fy 500, the elongation % is approximately 12%.
This means that the steel can stretch up to 12% of its original length before it breaks.
The amount of cement required for 1 cubic meter varies depending on the concrete mix design.
The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.
The mix design specifies the ratio of cement to other materials like sand and aggregates.
For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.
It is important to accurately calculate ...
Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3
Density of steel is higher than that of concrete and sand
Density of concrete varies depending on the mix design
Density of sand can vary depending on the source and moisture content
based on 2 interviews
Interview experience
based on 13 reviews
Rating in categories
Junior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
31
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group