Runwal Group Junior Engineer Civil Interview Questions, Process, and Tips

Updated 12 Sep 2020

Runwal Group Junior Engineer Civil Interview Experiences

1 interview found

I applied via Referral and was interviewed before Sep 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Types building materials, testing of materials,IS codes of rcc concrete earthquake
  • Ans. 

    Building materials, testing, and codes for RCC concrete earthquake resistance.

    • Building materials include concrete, steel, wood, and masonry.

    • Testing of materials involves compressive strength, tensile strength, and durability tests.

    • IS codes for RCC concrete earthquake resistance include IS 456:2000, IS 13920:2016, and IS 1893:2016.

    • RCC (Reinforced Cement Concrete) is a composite material made of cement, sand, aggregates,...

  • Answered by AI
  • Q2. Initial and final setting time of cement, testing of cement, main steel ,distribution steel.
  • Ans. 

    The question is about cement testing and steel distribution in civil engineering.

    • Initial and final setting time of cement are important parameters to determine the workability of cement.

    • Testing of cement involves various methods such as compressive strength test, fineness test, and soundness test.

    • Main steel refers to the steel bars used in the primary reinforcement of concrete structures.

    • Distribution steel refers to th...

  • Answered by AI
  • Q3. Process of marble flooring and waterproofing in details
  • Ans. 

    Marble flooring involves preparation of subfloor, laying of marble tiles and grouting. Waterproofing involves surface preparation, application of waterproofing membrane and finishing.

    • For marble flooring, subfloor should be leveled and cleaned before laying tiles.

    • Marble tiles are laid using adhesive and spacers to ensure even spacing.

    • Grouting is done after tiles are set to fill gaps between tiles.

    • For waterproofing, surf...

  • Answered by AI
  • Q4. Grade of cement, PCC ,concrete mix
  • Ans. 

    Grade of cement, PCC, and concrete mix are important factors in construction.

    • Grade of cement refers to the strength of the cement used in construction.

    • PCC stands for Plain Cement Concrete, which is a mixture of cement, sand, and water.

    • Concrete mix refers to the ratio of cement, sand, and aggregate used in making concrete.

    • The grade of cement used in construction depends on the type of structure and the load it will bear...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just stick to your basics.. Whatever you write in your resume just be careful and have the in depth knowledge of the skills mentioned in your resume.. Only answer the questions that has been asked, don't ever try to add additional thing to your answer or else you will end up getting nervous.. Answer the question with confidence even if you dont know the correct answer.. Always stick to your answers as interviewer might try to test you..

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Which projects you had handled
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Interview based previous work and organization details
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions asked regarding the work done before
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What types of foundation work have you worked and its process
  • Q2. Type of grades used in concrete for different structure
  • Ans. 

    Different grades of concrete are used for different structures based on their strength requirements.

    • Different grades of concrete like M5, M10, M15, M20, M25, etc. are used for different structures.

    • For example, M5 grade concrete is used for PCC (Plain Cement Concrete) work, while M20 grade concrete is used for RCC (Reinforced Cement Concrete) work.

    • Higher grades like M30, M35, M40, etc. are used for structures requiring

  • Answered by AI
  • Q3. What is D-wall and what is the purpose of it?
  • Ans. 

    D-wall stands for Diaphragm wall, a reinforced concrete wall constructed in the ground to support excavation and prevent water ingress.

    • D-wall is commonly used in deep excavation projects to provide lateral support and prevent soil movement.

    • It is constructed by excavating a trench, installing reinforcement bars, and pouring concrete into the trench.

    • D-walls are often used in construction of underground structures like ba...

  • Answered by AI
  • Q4. What is done in foundation with high water level what process is carried out?
  • Ans. 

    In high water level areas, foundation work involves dewatering techniques to lower the water table and ensure stability.

    • Dewatering techniques such as wellpoint systems, deep wells, sumps, and pumping are used to lower the water table.

    • Waterproofing measures like using impermeable membranes or grouting can be applied to prevent water infiltration.

    • Proper drainage systems are installed to divert water away from the foundat...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Internal plaster thickness and ratio?
  • Ans. 

    Internal plaster thickness and ratio are important factors in construction projects.

    • The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.

    • The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).

    • The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.

  • Answered by AI
  • Q2. Process of slab checking?
  • Ans. 

    Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.

    • Check for proper reinforcement placement and spacing

    • Verify concrete mix design and curing process

    • Inspect for any cracks or defects

    • Ensure slab thickness meets design specifications

    • Perform load testing if necessary

  • Answered by AI
  • Q3. External Plaster thickness and ratio?
  • Ans. 

    External plaster thickness and ratio are determined based on the type of surface and desired finish.

    • External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.

    • The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.

    • For better adhesion, a bonding agent may be added to the plaster mix.

    • Proper curing is essential to ensure the stren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will try my best technical knowledge provide for your company...
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Execution process
  • Q2. Building rules and laws

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at University Vishveshvaraya College of Engineering (UVCE) and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is density of steel
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is a measure of how much mass is contained in a given volume of steel.

    • It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel alloy.

    • For example, the density of carbon steel is typically around 7.85...

  • Answered by AI
  • Q2. Why men is dominant in site work than women?
  • Ans. 

    Men are dominant in site work due to various societal and cultural factors.

    • Historically, construction and site work have been male-dominated industries.

    • Stereotypes and biases have led to fewer women pursuing careers in civil engineering and related fields.

    • Physical demands and safety concerns associated with site work may discourage some women from entering the field.

    • Lack of representation and mentorship for women in si...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Introduction youre self
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Asked about family background and overall experiences previously. Current CTC reason to leaveing the last branded firm Lodha group.
  • Ans. 

    How many children and studying in class?

  • Answered Anonymously
  • Q2. About the working day.
  • Q3. Asked about family members.
  • Q4. Living location and how many dependent.
  • Ans. 

    I currently live in New York City with my spouse and two children.

    • Living in New York City with spouse and two children

    • Total of four dependents including spouse and two children

  • Answered by AI
  • Q5. Finally the positive response received from the team.
  • Ans. 

    Yes , after successful interview round, received offer letter from the company and same day replied.

  • Answered Anonymously
  • Q6. After completing the interview process ,same day received the offer letter.
  • Ans. 

    Yes , after successful interview round, received offer.

  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good supporting senior and company culture.
Fast growing company in the real estate industry.

Runwal Group Interview FAQs

What are the top questions asked in Runwal Group Junior Engineer Civil interview?

Some of the top questions asked at the Runwal Group Junior Engineer Civil interview -

  1. Types building materials, testing of materials,IS codes of rcc concrete earthqu...read more
  2. Initial and final setting time of cement, testing of cement, main steel ,distri...read more
  3. Process of marble flooring and waterproofing in deta...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 124 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Novel Office Interview Questions
4.1
 • 55 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Omaxe Interview Questions
4.1
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
DRA Homes Interview Questions
4.6
 • 22 Interviews
View all
Runwal Group Junior Engineer Civil Salary
based on 13 salaries
₹2.5 L/yr - ₹5 L/yr
16% more than the average Junior Engineer Civil Salary in India
View more details

Runwal Group Junior Engineer Civil Reviews and Ratings

based on 9 reviews

4.3/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.1

Salary

3.8

Job security

3.9

Company culture

3.2

Promotions

3.4

Work satisfaction

Explore 9 Reviews and Ratings
Assistant Manager
112 salaries
unlock blur

₹4 L/yr - ₹10.6 L/yr

Manager
43 salaries
unlock blur

₹6.1 L/yr - ₹15.1 L/yr

Assistant General Manager
40 salaries
unlock blur

₹14 L/yr - ₹28 L/yr

Junior Engineer
39 salaries
unlock blur

₹2.4 L/yr - ₹5.5 L/yr

Senior Engineer
33 salaries
unlock blur

₹3.5 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Runwal Group with

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview