Superstructure Each Activity Item Rate is a billing method used in construction projects.
Superstructure refers to the part of a building above the foundation.
Each activity item rate is the cost of a specific task or activity.
This billing method calculates the cost of each activity item in the superstructure.
Examples of activity items include brickwork, plastering, flooring, etc.
Top trending discussions
posted on 9 Jul 2022
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
Section and elevation drawings of a bathroom
Include dimensions for all fixtures and fittings
Show the placement of plumbing lines and electrical outlets
Label materials and finishes for walls, floors, and fixtures
A leading engineering company specializing in innovative solutions for various industries.
Provides cutting-edge engineering solutions
Works with a wide range of industries such as automotive, aerospace, and technology
Focuses on research and development to stay ahead of the competition
Received positive feedback on technical skills and leadership abilities.
Received commendation for successfully leading a team in completing a major project ahead of schedule
Recognized for consistently providing innovative solutions to complex technical challenges
Received high ratings for communication skills and ability to collaborate effectively with cross-functional teams
Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
Listing WBS in MSP
Making MSP model
Execution of steel and shuttering involves the proper planning, design, and installation of these materials for construction projects.
Steel reinforcement bars must be placed in the correct location and spacing to ensure structural integrity.
Shuttering must be properly designed and installed to create the desired shape and size of concrete structures.
Both steel and shuttering must be inspected regularly to ensure they a...
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
The aptitude test consists of logical reasoning, quantity and time related questions. The questions aren't that difficult if prepared well.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I use Primavera P6 for planning. I am highly proficient in it.
I use Primavera P6 for planning purposes.
I have been using it for several years and have gained a high level of proficiency.
I am able to create and manage project schedules, track progress, and analyze data using the software.
I am also familiar with other planning software such as Microsoft Project and Excel.
I am always willing to learn new software and stay
A planning engineer is responsible for creating and managing project schedules, monitoring progress, and ensuring timely completion of the project.
Developing project schedules and timelines
Monitoring project progress and identifying potential delays
Collaborating with project managers and stakeholders to ensure timely completion
Preparing progress reports and presenting them to management
Identifying and mitigating projec...
Reports maintained on daily, weekly and monthly basis by Planning Engineer.
Daily progress report
Weekly status report
Monthly project report
Resource utilization report
Cost control report
Risk assessment report
Productivity of manpower varies by trade and project requirements.
Productivity is measured in units of work completed per unit of time.
Factors affecting productivity include skill level, experience, tools and equipment, and work environment.
Examples of productivity rates for trades include: electricians - 0.5-1.5 hours per outlet installed, carpenters - 100-200 sq ft of framing per day, plumbers - 2-4 fixtures installe...
RCC structure is a reinforced concrete structure commonly used in construction.
RCC structures consist of concrete reinforced with steel bars for added strength
Common types of RCC structures include beams, columns, slabs, and walls
RCC structures are designed to withstand heavy loads and provide durability
Proper reinforcement detailing is crucial for the structural integrity of RCC structures
MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.
MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.
They are essential for coordinating the installation of these systems during construction.
MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...
A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.
Include pipes for both water supply and drainage systems
Show fittings such as elbows, tees, and couplings
Include fixtures like sinks, toilets, and showers
based on 1 interview
Interview experience
Assistant Manager
106
salaries
| ₹4 L/yr - ₹10.4 L/yr |
Manager
54
salaries
| ₹6.1 L/yr - ₹15.1 L/yr |
Assistant General Manager
41
salaries
| ₹14 L/yr - ₹28 L/yr |
Junior Engineer
39
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Senior Engineer
33
salaries
| ₹3.5 L/yr - ₹9.5 L/yr |
Omaxe
Mahindra Lifespace Developers
Realty Assistant
Novel Office